Effects of early and late procurement of installations service / Effekter av tidig och sen upphandling av installationsarbete

Mohamed, Sadio, Reinholdsson, Karl January 2015 (has links)
I byggbranschen idag är det vanligt att upphandling av installationsentreprenader oftast sker vid produktionsskedet. Denna typ av upphandling har av installatörer ansetts vara sen då det oftast medför sämre möjlighet till god planering för installationsentreprenaden där bristerna leder till ändrings- och tilläggsarbeten. Problemet är inte endast vid upphandlingen utan detta påverkar hela byggprocessen då det finns kopplingar mellan de olika komponenterna i byggprocessen. Även tidigare studier har uppmärksammat brister i samarbetet mellan de olika aktörerna i processen. Beställare och entreprenörer har varit i fokus i dessa arbeten och eftersom byggbranschen är stor och komplex är det förståeligt att de som är längre ner i hierarkin får lägre prioritet. Detta gör att det här examensarbetet blir viktig då det idag inte görs många undersökningar ur installatörers synvinkel. Examensarbetet bygger på en förfrågan från VVS Företagens och Isoleringsfirmornas Förening, om att undersöka hur tidig och sen upphandling av installationsentreprenad påverkar faktorerna planering, lönsamhet, kvalitet, arbetsmiljö och arbetsklimat. I denna studie undersöktes två företag; ÖPE Isolering och Imtech VS-teknik, där ett par utvalda projekt från respektive företag studerades med hjälp av ansvarig projektledare/arbetsledare. Syftet med examensarbetet var att ur installationsentreprenörers synvinkel undersöka hur olika byggprojekt påverkas vid sen upphandling jämfört med projekt där de upphandlades i tidigt skede. Effekterna av sen respektive tidig upphandling har avgränsats till just dessa fem nämnda faktorerna för att under tiden som finns tillgänglig få en så bra bild av projekten som möjligt. Det svar som resultatet pekar emot är att generellt sett blir det mesta bättre då installatörerna upphandlas tidigare. Förhoppningsvis kommer beställare i framtiden att inse nyttan i att upphandla underentreprenörer tidigare, vilket troligtvis skulle medföra mycket bättre arbetsförhållanden både för byggare och installatörer.
22

Att prata om att äta och dricka : En kontrastiv studie av tyska och svenska / Talking about eating and drinking : A contrastive study of German and Swedish

Hartl, Iris January 2016 (has links)
Föreliggande studie handlar om att äta och att dricka, och hur man kan prata om det på tyska och svenska. Målet är att belysa vad det är som styr användningen av så kallade intagningsbegrepp i dessa två språk. Studien intar ett lexikal typologiskt perspektiv och lägger speciellt fokus på rollen som sociala faktorer spelar i valet av intagningsbegrepp. Det undersöks även hur långtgående tendenser svenskan och tyskan uppvisar att reservera vissa intagningsverb för maträtter och drycker av specifik karaktär. Datainsamlingsmetoden är semistrukturerade parintervjuer med 3 informantgrupper per undersökt språk. I utvärderingen av intervjuernas resultat används komponentanalys. Resultaten visar att talarens, lyssnarens och aktörens relation till varandra samt situationen som ska beskrivas (plats, tid) och artighet spelar störst roll i valet av intagningsbegrepp. Vissa mönster upptäcktes vad gäller reservering av begrepp för alkoholhaltiga och onyttiga näringsämnen. Andra faktorer som visade sig vara relevanta i valet av intagningsbegrepp är hastighet, mängd, njutning, rörelse, ljud och art. Resultaten uppvisar få skillnader mellan de undersökta språken. / The aim of this thesis is to give an overview over what controls speakers’ choice of expression when talking about eating and drinking in Swedish and German. Special focus lies on what roll social factors – such as formality, politeness, time of day and the place where food or drink are consumed – play in which expression is used. Another subject under investigation is as to how far Swedish and German go in reserving certain expressions of consumption for food or drink with specific characteristics. Data is gathered in semi-structured group interviews with a group size of two people, interviewing three groups per language. Component analysis is used for interpreting the gathered material in a structured way. The results show that the speaker’s, listener’s and actor’s interpersonal relationship, as well as the situation that the speaker wants to describe, are the most important factors in the speaker’s choice of expression. Some patterns were observed in connection with reserving expressions for alcoholic drinks and unhealthy food. Other factors that were deemed important in the choice of expression are speed of intake, amount of intake, enjoyment, motion, sound and species. Few differences between the studied languages were observed.
23

ÄTA-arbeten - särskilt om entreprenörens rätt till tidsförlängning till följd av ÄTA-arbeten / Correctional and Additional Work (CAW) - The entrepreneurs right to prolongation due to CAW

Nyfors, Axel January 2020 (has links)
No description available.
24

Bristfälliga bygghandlingar, ÄTA-arbeten och dess medföljande ekonomiska konsekvenser : Husbyggnadsprojekt och utförandeentreprenader

Berglund, Amanda January 2020 (has links)
In recent years, deficiencies in construction documents has become a common problem in the construction industry. In most cases this leads to financial consequences, both for clients and building contractors. The risk of financial consequences can be minimized if the deficiencies and errors are eliminated before the construction phase or if it’s detected in an early stage of a project. Within Peab Skellefteå, a lot of time, energy and money are spent to investigate the deficiencies and errors in construction documents. This mostly occur in the construction phase, since that is where the deficiencies and errors usually are discovered. Previous studies concerning the same area indicate that financial consequences is a result of inadequate construction documents and alteration and additional works, but none of the studies includes further investigation concerning how it practically appears in projects and in what way it affects the client’s and building contractor’s economy. Based on this, the purpose of the report has been formulated: The purpose of the master thesis is to investigate and understand how inadequate construction documents affects individual construction projects in terms of economy. Based on the results from the interviews, recommendations will be proposed regarding how the risk of financial consequences can be reduced to help entrepreneurs avoid these types of situations. The content of this report is essentially based on interviews with nine participants, either site managers, construction engineers or purchasers from Peab Skellefteå. Theory from previous studies is also used and the report is limited to traditional contracts. The results of the interview study revealed that both the building contractor and the client have been negatively affected in terms of economy in project 1–6. It is hard to report accurate numbers, since inadequate construction documents might affect the next work stage, contract rate, time that should have been spent doing something else and the time spent to investigate deficiencies and errors, which can be difficult to prove. Some costs could be deduced to the discovered deficiencies and errors, see Table 1. Generally, it’s stated that deficiencies in construction documents entails financial consequences for both entrepreneurs and clients. The respondents explain that the drawings are the most problematic construction document and that’s where most errors are discovered. The parts of the drawings that’s usually inadequate is piercings, fittings, inner walls, details, attachments and contradictory information. Deficiencies typically connected to financial consequences for the building contractor is piercings, reinforcement, fire sealing and time spent investigating the deficiencies. For the client, typical deficiencies connected to financial consequences are lack of foundation- and ground investigation, quantifying errors, when incorrect dying times leads to extra costs and additional work. The respondents’ suggestions for improvement in collaboration with the author’s own thoughts is the basis of the given recommendation. The main potential improvements for designers are to review construction documents more accurate, increase their knowledge about production and materials, work with BIM-coordination and be receptive to feedback. Clients should check the coordination, increase their knowledge about work steps and materials and have consistent solutions through the project. Building contractors should have coordination meetings with designers, clients and installers, make an appropriate number of tender calculations, provide feedback to designers and clients, use the question/answer-method, design a useful contract administration and increase the review of contract documents for the often-deficient parts.
25

Utvärdering Partneringprojekt hos Skanska sverige AB

Hagström, Linus, Pettersson, Per-Axel January 2020 (has links)
Partnering is an increasingly common form of project in the construction industry. From its inception in the late 80's in the USA until today, the habit and knowledge are increasing about how to carry out an effective partnering project and what to look out for. Previous reports have been focused on what partnering is and thoroughly how it is works. This report is written together with Skanska Sverige ABs Orebro Office. The purpose is to investigate the major practical pros and cons, when you manage a partnering project instead of a regular one with a fixed price. The selected areas of interest are Finance, Stress, Accidents & Incidents, the problem-solving process and what kind of project is best applicable. Facts are mainly taken from interviewed employees at Skanska and relevant clients they have been in contact with.Finance is the most influential factor in which choice of contractor that gets the deal, in terms of fixed price projects. The sum for which the customer buys a contractor is including risk calculations and fee margins leading to the percentage margin can be quite high. It is up to the contractor to perform the work with the money which they have been bought. If the construction costs run high, the contractor still does not get paid more. If it costs less, the contractor saves more money than planned.In a partnering project, the contract sum is stated between the two parties and a reasonable percentage are generated as a fee for the contractor. The contractor earns this amount regardless of production cost. This can differentiate the total percentage of earnings, if it will be greater or less than expected. The incentive is to create as good a product as possible and at the same time reduce production costs. The arrangement is positive for both parties as a stable income comes to the contractor and the client is able to influence the project more. The benefits are greatest in larger, longer and more complex projects where the risk is greater.Stress generally decreases in partnering projects as it is based on creating one community and to helping each other. No conflicting discussions about whose fault it was but the focus is on how to solve the problem. This leads to an improved problem-solving process and an estimated reduction of Accidents & Incidents in the majority of individuals who are deeply familiar and accustomed to this type of partnering project.The financial incentive promotes a company that wants to increase the percentage of its earnings for its shareholders instead of those that focus on current sales and the money flow. It creates more satisfied customers who realize that the company is not wasteful of their money. This means that companies that are listed on the stock exchange market can possibly get better results from partnering.The conclusion is that the optimal projects for this type of cooperation are those with sales of more than 100 million SEK that last for a long time and have greater complexity. This is because smaller projects cannot use the systems which partnering has to offer because the project is already rounded off when the partnering is at its best. Partnering is a good, stable and secure form of cooperation for both client and contractor as it is a stable income for the contractor and that the client has a better opportunity to influence the project. This as well as the final cost for the client should be as low as possible.
26

UTREDNING AV UPPHANDLINGSDOKUMENT VID OFFENTLIG UPPHANDLING MED FOKUS PÅ ÄTA-ARBETEN / Investigation of documents in public procurement with the focus on alterations, supplementary- and withdrawn work

Axelsson, Alice, Johansson, Elinor January 2020 (has links)
Purpose: Today two of the biggest problems within the construction industry in Sweden is the exceeding of budgets and that the projects do not finish in time. One of the reasons is the use of alterations, supplementary- and withdrawn work that occurs during the project. The purpose is therefore to study the variations that can be related to the documents that are used during public procurement as well as provide some suggestions on how the procurement documents can be improved for future projects. Hence trying to decrease the use of variations in projects. Method: The study consists of a multiple case study with three similar projects. The methods that are used are a literature study that provides the base of the intended study. A study of documents is also a crucial element to be able to draw the connections between the procurement documents and the alterations, supplementary- and withdrawn work. There will also be semi structured interviews that will strengthen the case study and increase the knowledge within the area. Findings: the study shows that 60 percent of the alterations, supplementary- and withdrawn work can be connected to the procurement documents. There are a few causes that leads to the use of alterations, supplementary- and withdrawn work in a project for example coordination between the different technical areas within the projects that can lead to contradictions in the documents. Too much material in the procurement documents can leads to conflicting information which leads to the use of alterations, supplementary- and withdrawn work. With greater accuracy and greater coordination between the different technical areas, drawings, and other documents. Coordination between the areas would also improve if it is implemented in the early stages of design. It is important to be clear in the technical description which work is expected from the project which would lead to fewer the alterations, supplementaryand withdrawn work. Implications: the overall problem is in this study is how you can reduce the use off alterations, supplementary- and withdrawn work connected to the procurement documents. Most of the alterations, supplementary- and withdrawn work in a project can be connected to these documents. To be able to reduce the cost there should be a system implemented regarding the review and coordination of the procurement documents. Limitations: This study is limited to three different projects from different municipalities, to secure a more certain result there should be more equivalent projects included in the study. The interviews are limited to the project managers that where responsible for the specific projects in this study. Keywords: alterations, supplementary- and withdrawn work, procurement documents, public procurement, specifications, regulations, technical specifications
27

Partnering i en mindre kommun - en SWOT-analys / Partnering in a small municipality - a SWOT-analysis

Landergren, Linus, Alinder, Anton January 2020 (has links)
Purpose: In today´s (2020) construction industry, partnering is mostly used in larger projects and municipalities. The purpose of this report is to study why partnering is not used to a greater extent in smaller municipalities. The goal of this report is to study whether smaller municipalities could benefit from applying partnering.    Method: To achieve the goal of this report, a case study was conducted with the data collection techniques interview and literature study. The interviews were conducted with three small municipalities, a large contractor and two municipal housing corporations. The literature study was done to attain an in-depth understanding of the concept of partnering and to investigate previous research on a similar topic.   Findings: The benefits of partnering are that the product will be good and the client get what they want as they are more involved in the project compared to regular procurement. The communication will be better and fewer disputes occur due to more frequent communication. Dedication and focus on the best of the projects are important elements for a succeeded partnering project. Partnering could be beneficial for a smaller municipality but the reason why partnering is not used to a greater extent in smaller municipalities is because it requires more time, energy, commitment and a big organisation. The municipalities also have concerns about projects being procured on a cost reimbursable contract.  Implications: The small municipalities could benefit from partnering but it should be applied on projects that are ongoing for a long time or when they do not know what they want. Those involved should spend a lot of time in the beginning of the project to decrease the costs. The municipalities should be dedicated in the project, cooperate with the contractors and put the best of the project in focus.   Limitations: The report´s limitations mean that the report is not applicable to major municipalities in Sweden. The tender stage and the economy are not included in the report. Alternative solutions to the problems with changes, additions and cancellations of jobs within construction law, apart from partnering, are not addressed. / Syfte: I dagens (2020) byggbransch används partnering mestadels i större projekt och i större kommuner, syftet med rapporten är att utreda varför partnering inte används mer i mindre kommuner.   Målet med rapporten är att studera ifall det kan gagna mindre kommuner att tillämpa partnering.      Metod:  För att uppnå målet har en fallstudie genomförts med datainsamlingsteknikerna intervju och litteraturstudie. Intervjuerna genomfördes med tre mindre kommuner, ett stort entreprenadföretag och två kommunala bostadsbolag. Litteraturstudien gjordes för att öka förståelsen för begreppet partnering och för att utreda vad tidigare forskning säger om ämnet.  Resultat: Fördelarna med partnering är att produkten blir bra och som verksamheten vill ha det, då de är mer involverade i projektet jämfört med traditionell upphandling. Kommunikationen blir bättre då de kommunicerar oftare och det uppstår färre tvister. Engagemang och att sätta projektet i fokus är viktiga beståndsdelar för ett lyckat partneringprojekt. Partnering kan vara gynnsamt för en mindre kommun om det tillämpas på rätt sätt. Anledningen till att inte partnering används mer i mindre kommuner är för att det kräver mer tid, pengar och engagemang samt en stor organisation från beställaren i partneringprojekten. Kommunerna har även en oro för löpande räkning där det inte är ett fast pris utan prissumman fastställs först när projektet är klart.    Konsekvenser: Det kan var gynnsamt att tillämpa partnering för mindre kommuner men det bör vara ett projekt som pågår under en längre tid eller det inte vet vad de vill ha. De involverade bör lägga ner mycket tid i början av projektet för att minska kostnaderna. Kommunerna bör vara engagerade i projektet, samarbeta med entreprenörerna och sätta projektets bästa i fokus.  Begränsningar: Rapportens begränsningar gör att resultatet ej är tillämpbar på större kommuner i Sverige. Anbudsskedet och ekonomin tas ej upp i rapporten. Alternativa lösningar på problemen med ÄTA-arbeten, förutom partnering, behandlas ej.
28

ANBUD ELLER SKAMBUD : Tre studier om ändringar och tilläggsarbeten som uppstår i samband med entreprenadupphandlingar till en statlig myndighet

Ramqvist, Louise, Johansson, Linn January 2017 (has links)
Upphandling är en central del för att styra statliga resurser och hur de allokeras. Syftet är att förklara avtalsprecision av komplexa byggentreprenader. För att uppnå syftet kommer vi att studera byggprojekt där upphandlingar är utvecklade. Studie 1 besvarar en teoretisk hypotes om att stora projekt skapar fler ÄTA-arbeten. Hypotesen testas med registerdata från en offentlig myndighets interna projektdatabas. Studie 2 söker förklaringar till varför stora projekt driver ÄTA-arbeten. Förklaringar kommer från intervjuer med projektledare och entreprenörer. Studie 3 testas sex olika förklaringar vi benämner post-hoc hypoteser (PHH) som bygger på etablerade begrepp. Testet bygger på enkätdata för beställare och entreprenörer. Den interna projektdatabasen innehöll 486 infrastrukturprojekt (Studie 1). Baserad på projektdatabasen valdes fyra projekt ut för vidare analys. Totalt intervjuades fyra beställare och två entreprenörer kopplat till de utvalda projekten (Studie 2). Totalt deltog 208 respondenter i enkäten varav 87 beställare, 116 entreprenörer och 5 underentreprenörer som kompletterades av två externa entreprenörer (Studie 3).  Resultatet från Studie 1 ger indikation på att dokumentationen, uppföljningen och redovisningen är bristfällig. Detta bekräftades av intervjuerna i Studie 2. I Studie 3 fann vi att projekteringen är bristfällig i stora projekt där parterna agerar missvisande. Resultatet visar på att ÄTA-arbeten drivs av ofullständig projektering, person och ledarskap och av en medveten affärsmodell. Genom bättre dokumentation, uppföljning och redovisning skapas bättre avtalsprecision i upphandlingar och bidrar till meningsfulla processer och en träffsäkrare resursallokering. / Procurement is a key part of controlling government resources and how they are allocated. The purpose of this thesis is to explain the contractual precision of complex construction contracts. In order to achieve our objective, we will study construction projects where the procurement is well developed. We pursue this objective based on three studies. Study 1 answers a theoretical hypothesis that large projects create more cost overruns/error. The hypothesis is tested on a project database which is an internal register data from a public bureau. Study 2 seeks explanations as to why large projects drive cost overruns. Explanations come from interviews with project managers and contractors. Study 3 tests six different explanations we refer to post-hoc hypotheses (PHH) based on established concepts. The test is based on survey data for clients and contractors. The project database contained 486 infrastructure projects (Study 1). Based on the project database, four projects were selected for further analysis. A total of four clients and two contractors were interviewed in connection with the selected projects (Study 2). A total of 208 respondents participated in the survey, of which 87 clients, 116 contractors and 5 subcontractors were supplemented by two external contractors (Study 3). The result from study 1 indicates that the documentation, follow-up and reporting are inadequate and confirmed much of the findings in Study 2. In Study 3 we found that the planning is inadequate in large projects and often misleading. The result shows that cost overruns/error is driven by person and leadership, incomplete planning and a conscious business model. Through better documentation, follow-up and accounting, better contractual precision is created in procurement and contributes to meaningful processes and more accurate resource allocation.
29

Likställda arbeten i entreprenader

Widmark, Ronnie January 2020 (has links)
Vid entreprenader förekommer ett begrepp som kallas ÄTA (Ändringsarbete, Tilläggsarbete och Avgående arbete). Ett ÄTA-arbete uppstår när beställaren under entreprenadtidens gång föreskriver något som inte är angivet i kontraktshandlingarna. ÄTA är dessutom beställarens garanti för att dennes önskemål med investeringen blir som det är tänkt. Entreprenören är vid sådana tillfällen både berättigad och skyldig att utföra dessa ÄTA-arbeten mot ersättning. Detta står att läsa i standardavtalen AB 04 och ABT 06 som entreprenadavtalen ofta grundas på.1 När det kommer till entreprenörens rätt att erhålla betalning för arbeten som denne anser inte ingår i kontraktsarbetena kallas det för ”arbeten likställda med ÄTA-arbeten” (vidare kallat likställda arbeten). Den bestämmelsen återfinns i 2:4 i standardavtalen.  Regleringen gällande likställda arbeten verkar till synes väldigt genomtänkt och belyst av upphovsmännen i föreningen Byggandets kontraktskommité (BKK). Det har dock visat sig att den bestämmelse som skapats för att råda bot på eventuella problem när verkligheten avviker från det förmodade, inte sällan vållar meningsskiljaktigheter mellan parterna. Samtidigt som entreprenören vill ha extra betalt för arbeten som inte står med i kontraktet, så ligger det i beställarens intresse att betala så lite som möjligt utöver kontraktssumman. En fråga som väckt min nyfikenhet är hur en tvist om betalning för likställda arbeten kan bli så omfattande och handla om ett belopp om 21 miljoner kronor som i NJA 2015 s. 3.2 Informerade entreprenören inte beställaren om att de ansåg att det förelåg ett likställt arbete? Inhämtade entreprenören beställarens synpunkter, som i sin tur förklarade att de var av en annan åsikt? I händelse av det senare, varför fortsatte entreprenören att utföra likställda arbeten vid äventyr av att inte erhålla betalning? Eller har entreprenören inhämtat beställarens synpunkter utan att erhålla ett positivt svar av beställaren men valt att fortsätta ändå för att senare tvista om saken?  Hade det inte varit en mindre riskabel lösning för entreprenören att häva kontraktet i stället för att riskera att arbeta utan att erhålla betalning? Det känns i sammanhanget som att entreprenören står för en större del av riskerna när det kommer till de likställda arbetena och kostnaderna som uppstår. Under den senaste 15-årsperioden då AB 04 och ABT 06 varit gällande har BKK genom de nu gällande standardavtalen, och Högsta domstolen (HD) med sina prejudicerande domar, fastställt hur de grundläggande begreppen och rekvisiten ska tolkas när det gäller regeln om likställda arbeten i 2:4 och framförallt frågor om hur de här aktuella bestämmelserna i kapitel 2 i standardavtalen ska tolkas.  Uppsatsen handlar således om likställda arbeten och problematiken kring det begreppet.
30

En studie av hur entreprenadsumman i ett betongbroprojekt påverkas av ÄTA – arbeten och avvikelse : En fallstudie av 4 broprojekt utförda av Veidekke Entreprenad AB Anläggning Sydväst / A study of how the contract sum in a concrete bridge project is affected by contract changes and deviations : A case study of 4 concrete bridge projects done by Veidekke Entreprenad AB

Saleh, Nehad January 2020 (has links)
Anläggningsprojekt är idag allt fler på grund av att den infrastruktur som byggdes på mitten på 1900-talet inte längre uppfyller dagens ställda krav. I takt med att större entreprenader utförs idag, krävs även större resurser och bättre samspel mellan beställare och entreprenörer. Entreprenadsumman för ett betongbroprojekt är väldigt stark förknippat med mängden ÄTA–arbeten och avvikelser. ÄTA–arbeten kan gå i olika riktningar, till exempel från underentreprenör mot beställare och tvärtom. I denna studie ligger fokus på entreprenörens ÄTA–arbeten gentemot beställaren och avvikelser som uppstår i produktionen. Syftet med studien är att identifiera de vanligaste ÄTA–arbeten och avvikelser som förekommer i olika betongbroprojekt för att undersöka hur dessa påverkar entreprenadsumman samt hur de i framtiden skall hanteras av entreprenören så att de inte upprepas i kommande projekt. Till en början har en litteraturstudie gjorts för att öka kunskapen kring ämnet. Därefterhar en fallstudie utförts av fyra tidigare betongbroprojekt. Den centrala delen av fallstudien har varit en kvalitativ undersökning, med intervjuer samt en enkätundersökning. Det har hållits 10 intervjuer med olika platschefer, en jurist och en arbetschef, samtidigt har 55 tjänstemän från fallföretaget deltagit i enkätundersökningen. I den kvantitativa delen har en sammanställning gjorts av samtliga ÄTA–arbeten och avvikelser som uppstått i de betongbroprojekt som studerats. Därefter har de ÄTA–arbeten och avvikelser som upprepats i dessa betongbroprojekt identifierats. Studien visar att ÄTA–arbeten oftast uppstår på grund av brister i beställarens förfrågningsunderlag. Geotekniska undersökningar och tekniska lösningar föreskrivna av beställaren är det som vanligen föranleder ÄTA–arbeten. Även entreprenadformen är avgörande för mängd och typ av ÄTA–arbeten. I en utförandentreprenad är det mycket mer likställda ÄTA–arbeten och när det gäller en totalentreprenad är de vanligaste ÄTA–arbetena föreskrivna tilläggs- och ändringsarbeten. Det är sällan lönsamt med många ÄTA–arbeten i betongbroprojekten, däremot ökar det projektensomsättning vilket får ses som positiv. Avvikelser förekommer oftast på grund av dålig planering och kommunikation. Bristfälliga arbetsberedningar och missade kontroller är andra orsaker till att avvikelser förekommer. Det är oftast entreprenörens eget fel attdet uppstår avvikelser. Avvikelserna har då alltid en negativ inverkan på projektetsslutkostnad i och med att kostnaden inte läggs på entreprenadsumman, det vill säga att entreprenören avhjälper avvikelser på egen bekostnad. De vanligaste ÄTA–arbetena förekommer kring brokonstruktionens grundläggning,oftast på grund av att de geotekniska undersökningar som gjorts, har gjorts fel eller inte i tillräcklig omfattning. När det kommer till avvikelser är de vanligast i samband med armeringsarbeten och betonggjutningar. Dyrare avvikelser förekommer men inte i någon större utsträckning. Genom att lägga mer fokus på planering, kommunikation, involvering och upprätta bättre arbetsberedningar kan negativa effekter på entreprenadsumman på grund av ÄTA–arbeten och avvikelser undvikas. / Various plant projects are today more common because the infrastructure built in themid-1900s no longer meet today's set requirements. As major contracts are carried out today, greater resources and better interaction between client and contractor are also required. The contract sum for various concrete bridge projects is very strongly associated with the amount of contract changes and deviations. Contract changes can go between different entrepreneurs for example from a subcontractor against the clientand vice versa. In this study the focus is on contract changes from the main entrepreneur towards the client and deviations that occurs in the production. The purpose of the study is to identify the most common contract changes and deviations that occur in different concrete bridge projects to investigate how these affect the contract sum and how they should be handled by the entrepreneur in the future so that they are not repeated in upcoming projects. Initially a literature study has been done to increase knowledge about the subject. Then a case study has been carried out on four previous concrete bridge projects. The central part of the case study has been a qualitative investigation, where interviews have been held and a survey has been conducted. There have been 10 interviews with various site managers, a lawyer, and a supervisor, while 55 officials from the case company have participated in the survey. In the quantitative part, a compilation of contract changes and deviations that has occurred in the concrete bridge projects that was studied has been done. Then the contract changes and deviations that was repeated in all the studied concrete bridge projects has been identified. The study shows that contract changes occur most often because of deficiencies in the clients request documents. Geotechnical investigations and technical solutions prescribed by the client are what usually prompt contract changes. The contract form is also crucial for the amount and type of contract changes. In a contract that is based on AB 04 it is much more preserved contract changes and when it comes to a general contract based on ABT 06, the most common contract changes are prescribed alterations and additional works. It is rarely profitable with many contract changes in concrete bridge projects, yet it increases the revenue of the projects, which may be positive. Deviations occur most often due to poor planning and communication. Inadequate work preparations and missed controls are other reasons for the presence of deviations. It is usually the entrepreneur’s fault that there are a lot of deviations. Deviations always has a negative effect on the project’s final cost since the cost for it is not added to the contract sum, which means that the entrepreneur remedies deviations at their own expense. The most common contract changes occur around the groundwork of the bridge construction, usually because the geotechnical investigations carried out by the client, have been done wrong or not enough. When it comes to deviations the most common are in connection with reinforcement work and concrete castings. More expensive deviations occur but not to a greater extent. By focusing more on planning, communication, involvement and establishing better work preparations, negative effects on the contract sum due to contract changes and deviations can be avoided.