• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1627
  • 918
  • 581
  • 182
  • 164
  • 157
  • 78
  • 54
  • 50
  • 30
  • 30
  • 22
  • 15
  • 14
  • 12
  • Tagged with
  • 4685
  • 690
  • 594
  • 415
  • 392
  • 337
  • 335
  • 333
  • 324
  • 297
  • 291
  • 284
  • 277
  • 269
  • 269
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
921

Comportamento de tubulões à céu aberto, instrumentados, em solo não-saturado, colapsível / Performance of instrumented pier in unsaturared and collapsible soil

Carneiro, Benedito José Imbiriba 16 December 1999 (has links)
Nesta tese foram avaliados o comportamento de tubulões a céu aberto, instrumentados, em solo não-saturado e colapsível. Para o desenvolvimento destes estudos foram executados seis tubulões instrumentados, com o objetivo de se obter a capacidade de carga e recalques, avaliar as curvas de transferência de carga, bem como a separação das parcelas de resistência da base e atrito lateral. Provas de carga na umidade natural e com inundação do solo através de cava de superfície foram realizadas para a quantificação da influência da variação da umidade na capacidade de carga e na colapsibilidade do solo. Os carregamentos aplicados nos tubulões foram do tipo lento (SML). Ensaios de campo e laboratório foram realizados para a obtenção dos parâmetros de resistência do solo e acompanhamento da variação do teor de umidade in situ com vistas ao estudo da capacidade de carga com a utilização dos conceitos dos solos não-saturados. Simulações numéricas foram realizadas com a utilização do modelo proposto por MACHADO (1998) para prever o comportamento dos tubulões executados em solo não-saturado no Campo Experimental de Fundações da USP/São Carlos. / The performance of instrumented pier in unsaturated and collapsible soil was evaluated. In order to study it, six instrumented caissons were performed to obtain the bearing capacity, settlements, the load transfer curves, and the separation of the base resistance and skin friction. Static load test were carried out with natural and saturated soil conditions to quantify the influence of moisture on the behaviour of pier. Field and laboratory tests were performed to obtain the soil resistance parameters and moisture content variation \"in situ\" in order to study the bearing capacity using unsaturated soil concepts. Numerical simulations were carried out through the model proposed by MACHADO (1998) to predict the behaviour of pier built unsaturated soil at the experimental field of foundations of USP/São Carlos.
922

Optimering av last och produktion i Gävles fjärrvärmenät : Reducering av effekttoppar via värmelagring i byggnader

Elofsson, Fredrik January 2019 (has links)
District heating is today the most common way of providing a building with heat and hot water in Sweden. It is an environmentally friendly product mostly used with renewable fuel. However, at power peaks most companies use production units that are more expensive and worse for the environment and should therefore be avoided as much as possible. This can be done with a method called load management. When a power peak occurs, the heat supply to buildings connected to the district heating system can be temporarily reduced. The heat energy can later be returned when the heat demand is lower. Thanks to the heat inertia of the buildings, the indoor temperature will not fall within the time frame for the load management. Historical data has been analysed to identify when and why power peaks occur in the district heating network. Power peaks throughout the district heating network have proved difficult to identify. However, for individual consumers clear patterns of power peaks have emerged. These power peaks mainly occur because of large use of hot water but also because of the shifting outdoor temperature. In order to see how the production cost would differ from the actual outcome load management was applied for Gävle's district heating 2018. The load management was calculated manually by identifying the most expensive production unit on an hourly basis. If a cheaper production unit had the potential to deliver higher power the next hour, the production was moved to the cheaper production unit. The process was repeated for each hour during 2018. After carrying out load management for Gävle's district heating network, 1 457 MWh had been shifted to a cheaper production unit. This resulted in a financial saving of 1,0 % of the total production cost. The environmental savings showed a reduction from 6.1 to 5.9 g CO2eq /kWh a total of 197 tonne CO2eq. In the exact same way, a load management was performed for a scenario where Gävle and Sandviken's district heating network were connected. The gain for a load management with Sandviken will be considerably larger, a reduced production cost of 3.6 % is possible. The environmental savings showed a reduction from 8.4 to 7.8 CO2eq /kWh a total of 575 tonne CO2eq. For future efficient load management, buildings should be divided into different classes depending on the building's time constant. User patterns for the entire district heating network have proved difficult to detect. Artificial intelligence can be an option for short-term forecasting of the power output / Fjärrvärme är idag det vanligaste sättet att förse en bostad med värme och tappvarmvatten i Sverige. Fjärrvärmen är ofta en miljövänlig produkt som kan produceras av till exempel biobränsle- och avfallseldade kraftvärmeverk eller spillvärme från industrier. Vid tillfälligt högt effektbehov, effekttoppar, använder sig merparten av bolagen av dyrare produktionsenheter med större miljöpåverkan. Dyrare produktionsenheter bör undvikas i största möjliga mån och i detta syfte används metoden laststyrning. Vid en effekttopp kan värmetillförseln till byggnader sänkas temporärt för att återföras några timmar senare när effektbehovet är lägre. Tack vare värmetrögheten i byggnaderna bör inomhustemperaturen inte sjunka inom tidsramen för laststyrning. Statistik från Gävles fjärrvärmanvändning på timbasis under 2018 har analyserats för att identifiera när och varför effekttoppar sker. Effekttoppar i hela fjärrvärmenätet har visat sig svåra att identifiera. På lokal nivå har däremot tydliga mönster för effekttoppar framkommit. Dessa effekttoppar beror till största del av tappvarmvattenanvändning men även förändringar i utomhustemperaturen. För att se hur produktion och last kunde skiljt sig från det verkliga utfallet tillämpades laststyrning för Gävles fjärrvärmeproduktion 2018. Laststyrningen beräknades manuellt genom att den dyraste produktionsenheten identifierades på timbasis. Om en billigare produktionsenhet hade potential att leverera högre effekt nästkommande timmar försköts produktionen. Därefter upprepades processen för varje timme under 2018. Efter utförd laststyrning för Gävles fjärrvärmenät hade ca 1 457 MWh förskjutits till en billigare produktionsenhet. Det gav en ekonomisk besparing på 1,0 % av Gävles totala produktionskostnad. Den miljömässiga besparingen visade på en sänkning från 6,1 till 5,9 [g CO2ekv /kWh] sammanlagt 197 ton CO2ekv. På samma sätt utfördes en laststyrning för ett scenario där Gävle och Sandvikens fjärrvärmenät sammankopplats. Vinsten för en laststyrning med Sandviken blev betydligt större med en minskad produktionskostnaden på 3,6 %. Den miljömässiga påverkan sjönk från 8,4 till 7,8 g CO2ekv /kWh sammanlagt 575 ton CO2ekv. För en framtida effektiv laststyrning bör byggnader delas in i olika klasser beroende på byggnadens tidskonstant. Användarmönster för hela fjärrvärmenätet har visat sig svårt att identifiera. Artificiell intelligens kan vara ett alternativ i framtiden för att prognostisera effektuttaget
923

Estimação de demanda em tempo real para sistemas de distribuição radiais / Real time load estimation for radial distribution systems

Massignan, Julio Augusto Druzina 01 August 2016 (has links)
Para implantação de diversas funções de controle e operação em tempo real em Sistemas de Distribuição (SDs), como, por exemplo, restabelecimento de energia, é necessário um procedimento para representar a carga em tempo real. Ou seja, uma metodologia que possibilite a estimação em tempo real das demandas dos transformadores de distribuição que em geral não são monitoradas de forma direta. Para esse fim propõe-se, neste trabalho, um Estimador de Demanda em Tempo Real (EDTR) baseado em: informações off-line (consumo mensal dos consumidores e curvas de carga típicas); um algoritmo computacionalmente eficiente para cálculo de fluxo de potência baseado na estrutura de dados denominada Representação Nó-Profundidade (RNP); e nas poucas medidas disponíveis em tempo real nos SDs. O EDTR proposto opera em dois estágios: (1) Estimação Off-line das Demandas; e (2) Refinamento em Tempo Real das Demandas, executados em instantes diferentes (um de maneira off-line e outro em tempo real), de forma a prover uma estimativa das demandas dos transformadores de distribuição. Considerando somente as informações off-line, o EDTR proposto permite a estimação das demandas dos transformadores de distribuição com uma medida da incerteza da estimativa. Através do processamento das medidas disponíveis em tempo real, via um algoritmo eficiente para cálculo de fluxo de potência, o EDTR proposto permite o refinamento das estimativas off-line. Neste trabalho serão apresentados resultados de diversas simulações computacionais demonstrando a eficiência do EDTR proposto. Alguns parâmetros são avaliados quanto à influência nas estimativas do EDTR proposto, como a presença de erros grosseiros nas medidas disponíveis em tempo real e alimentadores somente com medidas de magnitude de corrente. Além disto, destaca-se a influência da qualidade das estimativas iniciais obtidas pelo Estágio (1), e a importância das hipóteses estatísticas utilizadas nesse estágio para o processo de estimação. Apresenta-se, ainda, a aplicação do EDTR proposto em um SD real brasileiro. Um teste de validação foi realizado através de uma campanha de medição em um alimentador real, que consistiu na instalação de medidores de demanda em três transformadores de distribuição para aferir a qualidade das estimativas obtidas pelo EDTR proposto. Finalmente, o EDTR proposto é aplicado em um SD real de larga escala, para aferir o desempenho computacional da metodologia implantada e as dificuldades de implantação. Vale ressaltar que sua implantação é condizente com ferramentas consolidadas nos Centros de Operação da Distribuição, como o uso do processo de agregação de cargas e o cálculo de fluxo de potência, e poucas rotinas precisam ser adicionadas para integração do EDTR. / Several real time control and operation applications for Distribution Systems (DS), such as, service restoration, require a procedure for real time load modeling. That is, a methodology for real time estimation of the distribution transformers loading which are generally not monitored. For this purpose, in this dissertation, a Real Time Load Estimator (RTLE) is proposed based on: off-line information (monthly consumption and typical load curves); a computationally efficient algorithm for power flow calculation based on the data structure called Node-Depth Encoding; and on the few available real time measurements on the distribution system. The proposed RTLE operates in two stages: (1) Off-line Load Estimation and (2) Real Time Load Refinement, performed in different moments (one off-line and the other in real time), providing the distribution transformers load estimates. Using only the offline information, the proposed RTLE allows the estimation of the loads of the distribution transformers with a measure of uncertainty. By processing the available real time measurements, using an efficient power flow calculation algorithm, the proposed RTLE refines these off-line estimates. This dissertation presents several simulations showing the efficiency of the proposed RTLE. Some parameters are evaluated and their influence on the RTLE load estimates, such as gross errors in the available real time measurements and feeders with only current magnitude measurements. Besides, it is emphasized the influence of the initial load estimates obtained from Stage (1), and the importance of the statistical hypothesis used in this stage in the load estimation process. Also, this work presents the application of the proposed RTLE in a real Brazilian DS. A validation test was performed through in-field verification in a real distribution feeder, which was executed via load meters installation in three distribution transformers to evaluate the quality of the load estimates provided by the RTLE. Finally, the proposed RTLE was tested in a real large scale DS to evaluate its computational performance and the difficult level of its implementation. It is noteworthy that its implementation is straightforward with other Distribution Operation Center tools, such as load aggregation and load flow calculation, and few routines must be added for integrating the RTLE.
924

Metodologia para planejamento de ações de alívio de carregamento em sistemas de distribuição de energia elétrica em média tensão / Methodology for planning of load shedding actions in electrical power distribution systems in medium voltage

Borges, Guilherme Pereira 14 June 2016 (has links)
O objetivo desta tese é desenvolver e implementar em computador uma metodologia para resolver o problema de alívio de carregamento utilizando técnicas de remanejamento ou corte de carga. Tal metodologia, fundamenta-se no Algoritmo Evolutivo Multiobjetivo em Tabelas, que foi desenvolvido inicialmente para o problema de restabelecimento de energia em sistemas de distribuição. Já metodologia desenvolvida nesta tese trata o problema de alívio de carregamento, buscando minimizar o número de consumidores sem fornecimento de energia elétrica e o número de operações de chaveamento. Todavia, é necessário a obtenção de um plano de manobras em chaves adequado de modo que este não inviabilize a implantação na prática e que resulte em soluções que contemplem: a ausência de sobrecarga na rede e nas subestações, a manutenção dos níveis de tensão dentro dos intervalos exigidos pela legislação e a manutenção da radialidade da rede. Para alcançar estes objetivos, utiliza-se técnicas que determinam a sequência de chaveamento necessária para o plano de alívio de carga obtido. Prioriza-se, ainda, o atendimento aos consumidores prioritários e o corte seletivo de cargas em condições de esgotamento das possibilidades de remanejamento entre os alimentadores primários. Ao aplicar a metodologia proposta em um sistema de distribuição real de grande porte da Companhia Energética de Pernambuco - CELPE, constatou-se que, em comparação com a técnica atualmente utilizada, a metologia desenvolvida é confiável e apresenta bons resultados no que se refere a: sequência exequível de manobras, diminuição do número de chaveamentos e redução do número de consumidores e consumidores prioritários sem atendimento. Além disso, a metodologia possui capacidade de aplicação em outros sistemas semelhantes e foi integrada em um sistema computacional com ambiente gráfico permitindo estudos de caso e armazenamento em banco de dados. / The objective of this research is to develop and implement a methodology for the treatment of load shedding problem due to the existence (operation) or the possibility to occur (planning) contingencies in supply system (High Voltage/Subtransmission). The methodology is based on Multiobjective Evolutionary Algorithm in Tables, initially developed for the service restoration problems in distribution systems. It aims to minimize the number of customers without electricity supply; minimizing the number of switching operations, so that it does not impede the implementation in practice; absence of overload in network and substations; maintaining the voltage levels within the ranges required by the laws of radiality and maintenance of the network. To achieve these goals, are used techniques for determining the required switching sequence for the load shedding plan obtained; prioritization of special consumer in service and selective load shedding when exhausted the possibilities of relocating loads between primary feeders. When applies the proposed methodology in a real large distribution system of the Energy Company of Pernambuco - CELPE, it can be seen that, compared with the technique currently used, it is reliable with good results regarding viable sequence of maneuvers; reducing the number of switchings and number of consumers and priority consumers without service in addition to be able to be applied in similar systems. The methodology has been integrated into a computer system in a graphical environment with facilities of case studies and storing information in the database.
925

Contribution au pilotage de la charge pour accroître la flexibilité du système électrique. / The contribution of load control in increasing electric system flexibility

Saker, Nathalie 30 January 2013 (has links)
Les défis environnementaux et l’augmentation de la population viennent en preuve de l’importance de réfléchir à d’autres moyens de production tout en maintenant la sécurité et la fiabilité du système électrique. La sûreté du système électrique exige à tout moment que la production soit égale à la demande des consommateurs, pour ça, différentes solutions sont déjà mises en place, ces solutions consistent à mettre en marche des moyens de pointes couteux et polluants pendant les périodes de pointes, mais comme les moyens de production son insuffisants et vue la difficulté d’exploitation de nouveaux moyens de production, une nouvelle réflexion sur la gestion de la demande est apparue; celle-ci se base sur la possibilité à gérer la demande du consommateur final au lieu de la satisfaire.L’objectif de la thèse est d’étudier la possibilité à rendre des services au système électrique en appliquant des actions de contrôle dites de DR (Demand Response), sur différents types de charges électriques. Ces actions de DR représentent des interruptions partielles appliquées sur les charges électriques de type thermique. Notre choix s’est basé sur ces types de charges parce que celles-ci emmagasinent de la chaleur respectivement dans l’air et dans l’eau; qui peut être restituée pendant la période de contrôle ou d’interruption. Néanmoins, il existe un effet négatif qui suit le contrôle de ces charges car l’énergie effacée de ces charges est reportée à l’instant de reconnexion de celles-ci; ce report prend la forme d’un pic de consommation nommé CLPU (Cold Load Pick-Up) et qui apparait au moment de la reconnexion. Le CLPU représente un problème qui doit être géré, et sa magnitude dépend des types d’actions de contrôle qu’on veut implanter et aussi des conditions du système électrique (contingence, défaillance d’une unité de production ou besoin de réserve de puissance). Pendant la thèse, le CLPU est contrôlé et optimisé ainsi que la puissance effacée. Un cas d’étude est présenté sur la contribution des actions de gestion de la demande à l‘ajustement entre la demande et la production et l’effet généré sur le réglage secondaire de fréquence. / Environmental challenges and the increasing in electric demand show the importance of considering other form of production while maintaining the safety and reliability of the electrical system. The electrical power systems stability lays on a fundamental constraint: supply and demand must be equal at each instant, so, different solutions are already in place, these solutions include controlling generators’ production during peak periods. But, power units (mainly nuclear, thermal, hydro) capacities are not always sufficient and flexible to follow the demand variations during these periods; an alternative solution to this insufficiency is to make the demand following the electrical power generation by providing bulks of electrical power to the power system by curtailing consumer’s electric load consumption. Such a solution that represents a new organization in the power system industry can be done by Demand Side Management (DSM) actions. The aim of the thesis is to study the possibility to offer services to the electrical system by applying control actions called DR (Demand Response) on different types of electric loads. These DR actions represent partial interruptions of electrical loads’ consumption and especially thermal loads’ consumption.Our choice was based on the thermal electric loads because they store heat respectively in air and water, which can be restored during the control period or interruption. However, there is a negative effect that follows the control of these type of loads because the reduced energy during curtailment period is deferred at the time of reconnection, this deferred power takes the form of a power peak named CLPU (Cold Load Pick-Up), which appears at the time of reconnection. The CLPU is a problem that must be managed, and its magnitude depends on the type of control actions and on the electric system conditions (ie: contingency or failure of a generating unit). In the thesis, the CLPU is controlled and optimized as well as the load reduction during curtailment period. The contribution of control actions in balancing mechanisms and the effect produced on the secondary control of frequency are analyzed.
926

Resposta dinâmica dos reatores UASB (Upflow Anaerobic Sludge Blanket) submetidos a cargas orgânicas e hidráulicas cíclicas: modelação matemática simplificada / Dynamic behavior of the UASB (Upflow Anaerobic Sludge Blanket) reactors submitted to organic and hydraulic cyclical loads: mathematical modeling simplified

Carvalho, Karina Querne de 10 June 2002 (has links)
Em países com condições ambientais, sócio-culturais e econômicas favoráveis à aplicação de processos anaeróbios para tratamento de esgotos sanitários, o reator UASB (Upflow Anaerobic Sludge Blanket) possui muitas vantagens, dentre os reatores anaeróbios, por permitir instalação, operação e manutenção a baixos custos, apresentar baixa geração de lodo, ser capaz de suportar sobrecargas hidráulicas e orgânicas e possuir eficiência de remoção de demanda química de oxigênio entre 70% e 80%. Contudo poucos estudos são reportados na literatura quando o reator é submetido a variações cíclicas diárias, de cargas orgânicas e hidráulicas, em períodos curtos de duração - iguais ou menores que 24 h. Para compreender os prováveis amortecimentos e atrasos nas respostas de reatores UASB quando submetidos a essas variações, desenvolveu-se um modelo matemático simplificado baseado no regime de escoamento contínuo de um tanque de mistura completa, no modelo cinético tipo Monod para remoção de DQO (Demanda Química de Oxigênio) e equacionamentos empíricos reportados na literatura. Esse modelo indicou que, mesmo apresentando baixa eficiência na remoção de demanda química de oxigênio, o reator possui capacidade de amortecer as variações impostas de vazão e respondeu com grande sensibilidade à variação de velocidade específica máxima de degradação de substrato, indicando que esse parâmetro cinético deve ser o parâmetro de calibração do modelo matemático. / In countries with favorable environmental, social, cultural and economical conditions, the use of anaerobic processes in treatment of domestic sewage. The UASB reactor (Upflow Anaerobic Sludge Blanket) has many advantages, among the anaerobic reactors, allows the installation, operation and maintenance with low costs; presents low sludge generation; is capable to support organic and hydraulic overloads and has COD removal efficiencies between 70% and 80%. However few studies are reported in the literature about reactors submitted to cyclical daily variations of organic and hydraulic loads in short periods of time - equal to or shorter than 24 hours. Aiming to understand the probable dampening and the delays in the response of the UASB reactors when submitted to these variations, it was developed a simplified mathematical model based on the continuous flow pattern of a completed stirred tank and in the Monod kinetic model for COD (Chemical Oxygen Demand) removal and empirical kinetic equations reported in the literature. The model indicated that, even when presenting low efficiency in the removal of COD, the reactor has a capacity to dampen the forced flow variations, and responded with great sensivity to the variation of qmáx., indicating that this kinetic parameter may be the calibration parameter of the mathematical model.
927

Resposta dinâmica de reator UASB em escala piloto submetido a cargas orgânicas e hidráulicas cíclicas: modelos matemáticos e resultados experimentais / Dynamic response of a UASB reactor submitted to organic and hydraulic cyclical loads: mathematical models and experimental results

Carvalho, Karina Querne de 14 December 2006 (has links)
Poucos estudos são reportados na literatura sobre o comportamento dinâmico do reator UASB submetido a variações cíclicas diárias, de cargas orgânicas e hidráulicas, em períodos curtos de duração - iguais ou menores que 24h, com os quais verifica-se queda na eficiência do reator, causada pela provável flotação dos grânulos, problemas com geração de odor e alta concentração de sólidos suspensos no efluente. Para melhor compreender a resposta dinâmica desses reatores submetidos a essas variações, foi desenvolvido o modelo MMS baseado no modelo hidrodinâmico de mistura completa em reatores em série, modelo cinético de primeira ordem para consumo de substrato e para crescimento da biomassa e equacionamentos empíricos reportados na literatura. Esse modelo indicou a capacidade do reator de amortecer as variações impostas e a influência da cinética na eficiência de remoção da matéria orgânica. Para calibrar e validar o MMS, foi avaliado o desempenho de um reator UASB (160 L) no tratamento de esgoto sanitário municipal da cidade de São Carlos. Durante o período de operação, o reator foi submetido a variações senoidais cíclicas, de cargas orgânica e hidráulica, em valores inferiores e superiores a 40% e 60% da vazão afluente de 16,0 L/h. A produção média de gás metano e a eficiência média de remoção de DQO alcançadas pelo reator foram de aproximadamente: 1,83 L/h e 61% para vazão afluente de 16 L/h, TDH de 10 h e velocidade ascensional de 0,23 m/h; 2,24 L/h e 48% para variação cíclica de 40% e 2,97 L/h e 40% para variação cíclica de 60%. O MMS indicou faixa de valores para a DQO efluente com diferença em relação aos resultados observados experimentalmente - de 37% para vazão afluente constante de 16 L/h e 59% e 56% para variações senoidais cíclicas de 40% e 60% da vazão afluente, respectivamente – devido à limitação do modelo em considerar o arraste de sólidos no efluente que ocorreu ao longo de toda a operação do reator e mais acentuadamente quando foram aplicadas variações da vazão afluente. O modelo ADM1 proposto por Batstone et al.(2002a,b)apresentou menor similaridade com os resultados observados experimentalmente por não contemplar a variação horária e diária de alguns parâmetros de entrada, mas apenas a média aritmética dos valores. / There are no extensive reports on the dynamic behaviour of UASB reactor submitted to cyclical daily variations of organic and hydraulic loads of short periods of time - equal to or shorter than 24 hours - that can damage the reactor efficiency due to probable granule flotation, odor generation and high concentration of suspended solids in the effluent. Aiming to understand the dynamic response of these reactors when submitted to these variations, it was developed the MMS model based on the N-continuous flow stirred tank reactors (CSTR) in series model, first order kinetics model for substrate consumption and biomass growth and empirical equations reported in the literature. The model indicated the reactor capacity on dampening the imposed flow rate variations and the influence of the kinetics in the organic matter removal efficiency. It was evaluated the response of a UASB in bench scale (160 L) treating sanitary sewage of São Carlos city in order to calibrate and validate the MMS. During the operation, the reactor was submitted to cyclical sinusoidal variations of organic and hydraulic loads in lesser and higher values of 40% and 60% of the influent flow rate of 16 L/h. The reactor achieved mean methane production and mean COD removal efficiency of: 1,83 L/h and 61% to influent flow rate of 16 L/h, HRT of 10 h and upflow velocity of 0,23 m/h; 2,24 L/h and 48% to sinusoidal variation of 40%; 2,97 L/h and 40% to sinusoidal variation of 60%. The MMS model results indicated a range of effluent COD values with a difference of 37% to influent flow rate of 16 L/h, 59% and 56% to sinusoidal variations of 40% and 60%, respectively, in comparison with the experimental observed data. This probably occurred due to the model limitation in considering and predicting the solids washout in the effluent that was verified during all the operation, and also more significant when the sinusoidal variations were applied. The ADM1 reported by Batstone et al. (2002a,b) presented lesser similarity with the experimental observed results due to the fact that it does not consider hourly and daily variations of some input parameters, but only the arithmetical mean of the values.
928

Metodologia semiempírica unificada para a estimativa da capacidade de carga de estacas. / Unified semiempirical methodology for estimating the load capacity of piles.

Kurt André Pereira Amann 27 August 2010 (has links)
A pesquisa parte do fato de que os métodos semiempíricos de estimativa da capacidade de carga de estacas não devem ser empregados indiscriminadamente em qualquer região do país sem as devidas adequações às características do solo local. Constata-se, com isso, que não existem metodologias específicas para proceder tais adequações e que o meio técnico acaba por realizar a mera classificação dos métodos em conservador ou contra a segurança, o que se constitui num certo paradigma. Assim, o presente trabalho propõe uma Metodologia Semiempírica Unificada (MSU), em três etapas. Na primeira delas, o projetista estima a capacidade de carga a partir da otimização das melhores práticas adotadas pelos diversos métodos semiempíricos utilizados no Brasil. Discutem-se ainda o embutimento da ponta e a criação de novos métodos semiempíricos. Na segunda etapa, realiza-se a verificação de desempenho com base nos critérios de ruptura aplicados à curva carga-recalque de provas de carga. Nessa etapa, as imprecisões do dito paradigma são apontadas e faz-se uma nova proposta de aplicação dos critérios de ruptura. Na terceira etapa, faz-se uma retroanálise para aferição da estimativa semiempírica unificada da primeira etapa. Propõe-se, assim, o uso da separação das parcelas de atrito e ponta por meio de métodos de transferência de carga, bem como pela proposta de ajustes polinomiais, no caso de ensaios instrumentados. A análise crítica desse processo gerou a proposta de uma nova abordagem matemática da transferência de carga. A correção dos valores adotados para os coeficientes semiempíricos de cada camada, individualmente, é feita pela proposta de aplicação do conceito de Hierarquia dos Solos (AMANN, 2000). Os resultados de correção dos métodos semiempíricos, contudo, são específicos para o solo de cada local em estudo. Assim, são utilizados, como exemplo, ensaios em diversas regiões do país, o que permite a verificação da aplicabilidade da metodologia proposta. / The research starts from the fact that the semiempirical methods for estimating the pile load capacity shouldn\'t be used indiscriminately in any country\'s region without making proper adjustments to the local soil characteristics. It is verified, from this, that there are no specific methodologies to make such adjustments and the geotechnical engineers find themselves forced to perform a simple classification of the methods in \"conservative\" or \"against the safety\", which constitutes a form of paradigm. In this context, this paper proposes a Unified Semiempirical Methodology (MSU) in three steps. In the first, the designer estimates the foundation load capacity from the optimization of best practices adopted by different semiempirical methods used in Brazil. A discussion is also made the toe embedment and the creation of new semiempirical methods. In the second step, the verification of the foundation performance is carried out, based on the failure criteria applied to the load-settlement curve of load tests. At this step, the inaccuracies from that paradigm are outlined and a new proposal is made for applying the failure criteria. In the third step, a backanalysis is accomplished to admeasure the unified semiempirical estimative from the first step. It is, thus, proposed to separate both shaft friction and toe resistance from the total load, by means of load transfer methods, and by the proposal of polynomial adjustments in the case of instrumented piles. With the critical analysis of this process, a new mathematical approach to load transfer is presented. The correction of the coefficients of the semiempirical methods is made by the application of the Soils\'s Hierarchy concept (AMANN, 2000). The results of semiempirical methods correction, however, are specific to the soils of each particular site. The applicability, of the proposed methodology, is illustrated using pile load tests from various parts of the country.
929

"Índices de carga e desempenho em ambientes paralelos/distribuídos - modelagem e métricas" / Load and Performance Index for Parallel/Distributed System - Modelling and Metrics

Kalinka Regina Lucas Jaquie Castelo Branco 15 December 2004 (has links)
Esta tese aborda o problema de obtenção de um índice de carga ou de desempenho adequado para utilização no escalonamento de processos em sistemas computacionais heterogêneos paralelos/distribuídos. Uma ampla revisão bibliográfica com a correspondente análise crítica é apresentada. Essa revisão é a base para a comparação das métricas existentes para a avaliação do grau de heterogeneidade/homogeneidade dos sistemas computacionais. Uma nova métrica é proposta neste trabalho, removendo as restrições identificadas no estudo comparativo realizado. Resultados de aplicações dessa nova métrica são apresentados e discutidos. Esta tese propõe também o conceito de heterogeneidade/homogeneidade temporal que pode ser utilizado para futuros aprimoramentos de políticas de escalonamento empregadas em plataformas computacionais heterogêneas paralelas/distribuídas. Um novo índice de desempenho (Vector for Index of Performance - VIP), generalizando o conceito de índice de carga, é proposto com base em uma métrica Euclidiana. Esse novo índice é aplicado na implementação de uma política de escalonamento e amplamente testado através de modelagem e simulação. Os resultados obtidos são apresentados e analisados estatisticamente. É demonstrado que o novo índice leva a bons resultados de modo geral e é apresentado um mapeamento mostrando as vantagens e desvantagens de sua adoção quando comparado às métricas tradicionais. / This thesis approaches the problem of evaluating an adequate load index or a performance index, for using in process scheduling in heterogeneous parallel/distributed computing systems. A wide literature review with the corresponding critical analysis is presented. This review is the base for the comparison of the existing metrics for the evaluation of the computing systems homogeneity/heterogeneity degree. A new metric is proposed in this work, removing the restrictions identified during the comparative study realized. Results from the application of the new metric are presented and discussed. This thesis also proposes the concept of temporal heterogeneity/homogeneity that can be used for future improvements in scheduling polices for parallel/distributed heterogeneous computing platforms. A new performance index (Vector for Index of Performance - VIP), generalizing the concept of load index, is proposed based on an Euclidean metric. This new index is applied to the implementation of a scheduling police and widely tested through modeling and simulation. The results obtained are presented and statistically analyzed. It is shown that the new index reaches good results in general and it is also presented a mapping showing the advantages and disadvantages of its adoption when compared with the traditional metrics.
930

Estimação de demanda em tempo real para sistemas de distribuição radiais / Real time load estimation for radial distribution systems

Julio Augusto Druzina Massignan 01 August 2016 (has links)
Para implantação de diversas funções de controle e operação em tempo real em Sistemas de Distribuição (SDs), como, por exemplo, restabelecimento de energia, é necessário um procedimento para representar a carga em tempo real. Ou seja, uma metodologia que possibilite a estimação em tempo real das demandas dos transformadores de distribuição que em geral não são monitoradas de forma direta. Para esse fim propõe-se, neste trabalho, um Estimador de Demanda em Tempo Real (EDTR) baseado em: informações off-line (consumo mensal dos consumidores e curvas de carga típicas); um algoritmo computacionalmente eficiente para cálculo de fluxo de potência baseado na estrutura de dados denominada Representação Nó-Profundidade (RNP); e nas poucas medidas disponíveis em tempo real nos SDs. O EDTR proposto opera em dois estágios: (1) Estimação Off-line das Demandas; e (2) Refinamento em Tempo Real das Demandas, executados em instantes diferentes (um de maneira off-line e outro em tempo real), de forma a prover uma estimativa das demandas dos transformadores de distribuição. Considerando somente as informações off-line, o EDTR proposto permite a estimação das demandas dos transformadores de distribuição com uma medida da incerteza da estimativa. Através do processamento das medidas disponíveis em tempo real, via um algoritmo eficiente para cálculo de fluxo de potência, o EDTR proposto permite o refinamento das estimativas off-line. Neste trabalho serão apresentados resultados de diversas simulações computacionais demonstrando a eficiência do EDTR proposto. Alguns parâmetros são avaliados quanto à influência nas estimativas do EDTR proposto, como a presença de erros grosseiros nas medidas disponíveis em tempo real e alimentadores somente com medidas de magnitude de corrente. Além disto, destaca-se a influência da qualidade das estimativas iniciais obtidas pelo Estágio (1), e a importância das hipóteses estatísticas utilizadas nesse estágio para o processo de estimação. Apresenta-se, ainda, a aplicação do EDTR proposto em um SD real brasileiro. Um teste de validação foi realizado através de uma campanha de medição em um alimentador real, que consistiu na instalação de medidores de demanda em três transformadores de distribuição para aferir a qualidade das estimativas obtidas pelo EDTR proposto. Finalmente, o EDTR proposto é aplicado em um SD real de larga escala, para aferir o desempenho computacional da metodologia implantada e as dificuldades de implantação. Vale ressaltar que sua implantação é condizente com ferramentas consolidadas nos Centros de Operação da Distribuição, como o uso do processo de agregação de cargas e o cálculo de fluxo de potência, e poucas rotinas precisam ser adicionadas para integração do EDTR. / Several real time control and operation applications for Distribution Systems (DS), such as, service restoration, require a procedure for real time load modeling. That is, a methodology for real time estimation of the distribution transformers loading which are generally not monitored. For this purpose, in this dissertation, a Real Time Load Estimator (RTLE) is proposed based on: off-line information (monthly consumption and typical load curves); a computationally efficient algorithm for power flow calculation based on the data structure called Node-Depth Encoding; and on the few available real time measurements on the distribution system. The proposed RTLE operates in two stages: (1) Off-line Load Estimation and (2) Real Time Load Refinement, performed in different moments (one off-line and the other in real time), providing the distribution transformers load estimates. Using only the offline information, the proposed RTLE allows the estimation of the loads of the distribution transformers with a measure of uncertainty. By processing the available real time measurements, using an efficient power flow calculation algorithm, the proposed RTLE refines these off-line estimates. This dissertation presents several simulations showing the efficiency of the proposed RTLE. Some parameters are evaluated and their influence on the RTLE load estimates, such as gross errors in the available real time measurements and feeders with only current magnitude measurements. Besides, it is emphasized the influence of the initial load estimates obtained from Stage (1), and the importance of the statistical hypothesis used in this stage in the load estimation process. Also, this work presents the application of the proposed RTLE in a real Brazilian DS. A validation test was performed through in-field verification in a real distribution feeder, which was executed via load meters installation in three distribution transformers to evaluate the quality of the load estimates provided by the RTLE. Finally, the proposed RTLE was tested in a real large scale DS to evaluate its computational performance and the difficult level of its implementation. It is noteworthy that its implementation is straightforward with other Distribution Operation Center tools, such as load aggregation and load flow calculation, and few routines must be added for integrating the RTLE.

Page generated in 0.0411 seconds