841 |
Ecodesign for Large Campus Style BuildingsMs Marci Webster-Mannison Unknown Date (has links)
No description available.
|
842 |
Ecodesign for Large Campus Style BuildingsMs Marci Webster-Mannison Unknown Date (has links)
No description available.
|
843 |
Ecodesign for Large Campus Style BuildingsMs Marci Webster-Mannison Unknown Date (has links)
No description available.
|
844 |
Ecodesign for Large Campus Style BuildingsMs Marci Webster-Mannison Unknown Date (has links)
No description available.
|
845 |
Ecodesign for Large Campus Style BuildingsMs Marci Webster-Mannison Unknown Date (has links)
No description available.
|
846 |
Ecodesign for Large Campus Style BuildingsMs Marci Webster-Mannison Unknown Date (has links)
No description available.
|
847 |
Ecodesign for Large Campus Style BuildingsMs Marci Webster-Mannison Unknown Date (has links)
No description available.
|
848 |
Some implications of the prediction of seismic riskReynolds, Ronald B. January 1978 (has links) (PDF)
No description available.
|
849 |
Spårbilsstation i Upplands Väsby kommun / Podcar station in Upplands VäsbyStagg, Hannah January 2010 (has links)
<p>Upplands Väsby municipality has a vision that podcars in the future will become an effective alternative in public transport, with reduced car-dependency as a result. The system would also attract new inhabitants and businesses to the municipality.</p><p>This report deals with various issues that podcar stations may face. Also, suggestions for possible track laying at the stations and station design are presented. Two areas are investigated. Eds allé which is a neighborhood that is planned for housing and where the station may be planned into the cityscape from the start. As well as the area around the center, Fyrkanten, where the station needs to interfere with existing buildings and traffic.</p><p>The proposed station in Eds allé is placed over the pavement, about three meters above ground. A station design inspired by nature is proposed, with grass-covered roof and large glass sections. Two platform areas would be enough to cover the station's capacity.</p><p>It is proposed that the Fyrkanten station is situated outside the shopping mall’s west entrance, and built in a contemporary style. Since the station is placed amongst other traffic, it needs to allow approximately 5 meters clearance. Three platforms provide sufficient capacity.</p><p>The station in Eds allé needs to closely attune to nature and environmental design, whereas the station in Fyrkanten can have a tougher design. That is the main difference between the stations in Eds allé and Fyrkanten.</p>
|
850 |
Husdeklaration av Stadiums nya distributionscentral / Description of Building Materials used in Stadium´s new Distribution CentreLandberg, Niklas January 2006 (has links)
<p>The distributioncentral of Stadium has an area of 31,6 acre and is being build in Herstadberg in the region of Norrköping. It is Mattssons Fastighetsutveckling (Mattssons Real-estate development) who also has ordered the building. They will also take care of the operation and support of the distributioncentral. Peab has got the assignment as a total contractor and it is for them I have done my degree project.</p><p>I have been drawing-up a description of the goods in the distributioncenter. In the declaration a description of the goods will be found, there substance for all the materials that has been built in to the building describes. All the descriptions of the goods has been put together in folders. If some of the sustance could be found in Peabs list of liquidate and forbidden materials, that can also been seen in the folders. The project should also result in folders for operation and support for the distributioncenter. In the work I have hade many contacts with contractors, assemblers and suppliers. Everybody has helpt me get hold of all the documents I have needed. When it comes to operation and support, many of the bigger contractors and assamblers will put together there own instructions in folders, and then deliver them to the orderer in connection with the final inspection. The documents from from remaining contractors, assemblers and suppliers will I put together in a folder.</p><p>After this work I have detected that the head of the contract, who has the responsibility for the declaration of goods dont have the time that needs. A person have to be appointed as responsible for the declaration. A full time employed is not needed, at the most a halftime.</p> / Den engelska titeln i uppsatsen (pdf-filen) är felaktig och ska vara "Description of Building Materials used in Stadium´s new Distribution Centre".
|
Page generated in 0.0297 seconds