• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3166
  • 2037
  • 2036
  • 957
  • 305
  • 210
  • 149
  • 87
  • 70
  • 70
  • 66
  • 53
  • 51
  • 42
  • 41
  • Tagged with
  • 10977
  • 1906
  • 1774
  • 1160
  • 1101
  • 1000
  • 917
  • 851
  • 841
  • 812
  • 721
  • 700
  • 676
  • 616
  • 615
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
851

Analys av förstudier

Lindhe, Louise, Nielsen, Björn January 2006 (has links)
<p>Förstudien är det första steget i projekteringsfasen, där det ges förslag på åtgärder. I Vägverkets arbete med åtgärder tas det fram förstudier, för att se vilka problemen är och vilka åtgärder som kan tänkas vara möjliga. Den här rapporten kommer att granska arbetet med förstudier. Under arbetets gång har vi använt oss av litteraturstudier, intervjuer samt en enkät. Arbetet inleds med att beskriva vad en förstudie är samt hur arbetet går till i teorin. Sedan följer en empirisk del, där berättas det om de intervjuer som gjorts och där presenteras även resultatet av enkäten. Efter det analyseras resultaten från den empiriska delen, och i de sista kapitlen diskuteras problem och förändringar. Först kommer en beskrivning kring hur arbetet med förstudier fungerar idag, och sedan ges förslag på hur arbetet kan förändras. Som ett exempel kan nämnas ett av de problem som finns idag. Det är hur de behandlar ekonomin, i många fall är redovisningen bristfällig. De som läser förstudien får inte veta hur kostnaderna har räknats fram. Den förändring vi kom fram till är att problemet kan lösas om det finns mer dokumentation kring arbetet som görs innan en förstudie påbörjas. Detta skulle öka tydligheten och ge en ökad förståelse.</p>
852

Passivhus : Särkostnader vid produktion

Johansson, David, Martin, Nilsson January 2010 (has links)
<p>En av orsakerna till att det inte byggs fler passivhus i Sverige är de ökade kostnaderna. I detta examensarbete genomförs en grundlig jämförelse mellan fyra olika passivhusprojekt och konventionella projekt. Jämförelsen görs kring de olika processerna i projektet: projektering, byggande och förvaltning. Den största vikten är lagd kring byggandet där byggnadsdelarna, grund, vägg och tak, jämförs med konventionellt byggande, för att få fram särkostnader för passivhus. Denna information ska förhoppningsvis underlätta för beställaren.</p><p>I den teorietiska bakgrunden ges en grundläggande presentation av litteraturstudierna om passivhus, dess historia, krav, kostnader, m.m. Den största delen av examensarbetet bygger på intervjuer med plastchefer och arbetsledare från fyra olika passivhusprojekt. Detta presenteras i fyra olika praktikfall där informationen från intervjun indelas i projektering, byggande och förvaltning samt en kostnadsdel som har stor vikt i examensarbetet. Programmet BidCon användes för att få fram uppgifter om tid, material- och totalkostnader kring klimatskalet i praktikfallen. Detta sammanställdes i en modell som skapades för att ge en överskådlig bild över praktikfallen.</p><p>Dessa praktikfall analyserades och sammanställdes till en modell med samma syfte som de övriga i varje praktikfall. Resultatet blev att ett antal slutsatser kunde dras utifrån särkostnader kring projektering och byggande men några rimliga slutsatser kunde inte dras vid förvaltning.</p>
853

Structural Insulated Panels SIPS : utredning av lastupptagande förmåga samt brandklassning

Stålarm, jesper January 2009 (has links)
<h1>Sammanfattning</h1><p> </p><p>Byggbranschen som sådan har över lång tid visat sig vara en mycket konservativ bransch. Gamla beprövade metoder och konstruktionslösningar tenderar att väljas före det som kan anses som nytt och oprövat. Under senare år har dock ett stigande energipris samt den globala uppvärmningen drivit utvecklingen i en riktning där energieffektiva byggnader efterfrågas i allt större omfattning. Detta medför en efterfrågan för nya material och byggnadssätt som kan ersätta eller komplettera de mer traditionella.</p><p> </p><p>Ett för i Sverige förhållandevis nytt byggnadssätt är att uppföra byggnader med Structural Insulated Panels SIPS. Dessa är konstruktionselement som används för både väggar och tak. De består av en yttre beklädnad av OSB-skivor mellan vilka det finns ett isolermaterial, vanligen bestående av någon typ av cellplast eller liknade. Vägg- och takblocken saknar således de stående reglar och takstolar som finns i traditionella konstruktioner utan bärförmågan utgörs av materialens samverkan sinsemellan.</p><p> </p><p>Ursprungligen kommer denna byggnadsteknik från USA där de första försöken att använda denna teknik startade redan på 1930-talet. Det är dock först under senare år som SIPS fått ett större genomslag på marknaden i USA. I Sverige används än så länge tekniken ej i någon större omfattning. SIPS förtillverkas vanligen i fabrik och levereras sedan färdiga för montering till byggplatsen.</p><p> </p><p>Det som undersöks i denna rapport är SIPS-elementens lastupptagande förmåga då de används på tak. Frågeställningen är då hur mycket last de kan uppta per m<sup>2</sup> utan att den nedböjning som då sker skall bli för stor. De metoder som använts för att undersöka detta är huvudsakligen enklare deformationsberäkningar samt jämförelser mellan framräknade resultat och de laster som kan tänkas förekomma på ett tak i form av egentyngder och snölast. Resultaten visar att spännvidder upp till 5-6 m kan anses vara rimliga att använda, beroende av elementens tjocklek, takets form och var byggnaden är belägen.</p><p> </p><p>Det utförs även i rapporten en utredning om vad för slags brandteknisk klass dessa SIPS-element kan tänkas tillhöra. Detta utförs utan någon som helst provning vilket bör påpekas måste utföras av ackrediterad instans för att resultaten skall vara giltiga. Resultaten och diskussionerna kring SIPS-elementens brandklass är mer en jämförelse mellan traditionella konstruktioner med generella godkännanden och ett teoretiskt resonemang kring hur resultatet bör bli om ett brandprov genomförs. Metoden för att utreda detta har till största del varit litteraturstudier, då främst Boverkets skrifter BBR, BKR samt byggvägledningar. Även de olika materialens egenskaper har undersökts, främst genom studier av olika tillverkares hemsidor. Resultaten visar att klassen REI 15 kan ett SIPS-element antas ha om det är isolerat med polyuretanskum. Denna brandtekniska klass uppfyller de krav som ställs i BBR när det gäller småhus. När det gäller flerbostad hus och liknande byggnader där kraven ställs högre kan det anses svårare att uppfylla kraven.</p><p> </p><p> </p><p> </p><p> </p><p> </p><p> </p><p>Det som i första hand avgör SIPS-elementens brandtekniska klasstillhörighet är dess förmåga att bibehålla sin bärförmåga då de utsätts för brand. Denna beror till största del av vid vilken temperatur materialen i konstruktionen inte längre kan anses vara sammanbundna med varandra. Det vill säga när den vidhäftning som finns mellan isolermaterialet och OSB-skivorna upphör att existera. Det är således inte i det avseendet av störst betydelse huruvida isolermaterialet är brännbart eller ej utan vilken temperaturbeständighet det har. Enligt detta resonemang kan eventuellt SIPS-elementet skyddas genom att det bekläds med ett antal lager gipsskivor. En sådan åtgärd kan enligt fört resonemang om möjligt placera konstruktionen i klass REI 30 vilket då innebär att konstruktionen i fråga kan användas i vissa byggnader där kraven enligt BBR ställs högre beträffande brandteknisk klass.</p><p> </p><p> </p><p> </p><p> </p><p> </p><p> </p><p> </p><p> </p><p> </p><p> </p><h1> </h1><h1> </h1><h1> </h1> / <h1>Abstract</h1><p> </p><p>The construction industry as it is has for a long time proven itself to be a very conservative trade. Proven methods and materials from the past have a tendency to be chosen instead of those who can be referred to as new and unproven. However, during the last few years the increased cost for energy and the global warming have pushed the acceptance of new construction materials and solutions when more energy efficient buildings are requested. This brings out an increased need for new materials and ways to construct buildings, which can replace or complement the more traditional ways to build.</p><p> </p><p>One for in Sweden relatively new construction method is to construct buildings with Structural Insulated Panels SIPS. These elements of construction which can be used for constructing both walls and roofs are made out of an outer skin of OSB-boards which are in between isolated by a core of cellular plastic of some sort. The wall and roof panels do not have those joists that a traditional framework has. The result is that the amount of heat leakage through wooden lumber are minimized compared to a traditional construction.</p><p> </p><p>This building technique has its origin in the USA where the first basic tries to use the SIPS-technique begun in the 1930s. However it's not until recent years that SIPS has made a bigger breakthrough on the market in the USA. The SIPS are usually prefabricated and delivered ready for assembly to the construction site.</p><p> </p><p>What is to be investigated in this report is the SIPS ability to withstand load when they are used as roof-elements. In this case it is the amount of load (kN/m<sup>2</sup>) the element can withstand before the deflection gets to big. The methods being used for this is mainly simple calculations of deflection and comparisons between calculated results and those loads that in theory could work on a roof in shape of dead load and load caused by snow. The results show that spans between 5-6 meters could be considered reasonably to use, though slightly depending on thickness of the SIPS-element, shape of roof and where the building is located, taking into account the  potential load caused by snow.</p><p> </p><p>In the report an investigation of which rating of fire performance these SIPS could belong to is also made. This is performed without any technical fire tests which should be pointed out must be carried out by a certified test laboratory to make the results valid. The results and discussions concerning the SIPS should be regarded as a comparison between traditional constructions that have a general approval and a theoretical reasoning about the outcome of a full scale fire test performed on SIPS. The method being used for this has mainly been studies of literature, mainly the regulations and recommendations that can be found in the documents produced by the Swedish Board of Construction (Boverket), The characteristics of the included materials in SIPS has been investigated mainly by visiting the manufactures web pages. Results show that a rating of fire performance could be claimed to be REI 15 for a SIPS which have an isolating core consisting of polyurethane foam. This rating fulfils the fire resistance standards according to single family homes and such. Although where standards are set higher, such as for apartment buildings and similar the standards could be considered tougher to meet.</p><p> </p><p> </p><p> </p><p>What mainly decides what type of fire resistance rating SIPS could be given is its ability to keep its load bearing capacity when exposed to fire. This ability mainly depends on at which temperature the materials in the SIPS-element no longer can be expected to be bound together. It is of less importance by these means if the isolation material could burn or not, it's more a question of at which temperature the element will delaminate and then lose its load bearing capacity. According to this a possible way of protecting the SIPS from heat could be to apply a number of gypsum boards to the inside of the element. This could possibly raise the rating up to REI 30. This enables that the SIPS could possibly be used in some buildings where standards according to Swedish building regulations are set slightly higher than those set for single family homes.</p><p> </p><p> </p><p> </p><p> </p><p> </p><p> </p><p> </p><p> </p><p> </p><p> </p>
854

Slipforming of Vertical Concrete Structures. Friction between Concrete and Slipform Panel

Fosså, Kjell Tore January 2001 (has links)
<p>Slipforming is a construction method that has been used in several decades for production of concrete structures. It is a wide range of different structures that are slipformed, but typical are vertical structures such as towers, bridge columns and offshore platforms. Slipforming are not only used for straight vertical concrete structures, but also on structures where the geometry of the structure and the wall thickness is changed. Slipforming is normally a continuous working operation (24 hours a day), which require a well-planned supply of materials. Problems that occur during this process needs to be solved instantly. Slipforming is a rather complicated operation compared to other construction techniques. The requirements to the materials, personnel and the execution of the work are therefore accordingly higher.</p><p>Slipforming of concrete structures has in most cases been carried out successfully with no or only minor supplementary work. However, in some cases, surface damages have occurred during slipforming. Typical surface damages are lifting cracks and vertical lined damages caused by lumps formed on the slipform panel. These problems have during recent years caused discussion and partly also scepticism to slipforming as a reliable construction technique. The Norwegian Public Roads Administration has recommended in Publication 77 that some concrete structures should not be slipformed depending on the environmental impact at the location, geometric degree of difficulties of the concrete structure and the type of concrete. Also in other countries there are scepticism to slipforming as a construction technique.</p><p>The prime objective of the research program is to improve the understanding of the slipform technique as a construction method in order to ensure high quality concrete structures. The objective is to identify the parameters affecting the net lifting stress (friction) that occur during lifting of the slipform panel. Focus is given to the importance of the concrete properties that will influence the forces that occur between the slipform panel and the concrete. Also any connection between the friction level and the surface damages is investigated. Based on the result it should be possible to define requirements for materials, mix composition and method of execution to ensure that the specified quality in the structure is obtained.</p><p>The lifting stress can be divided in static lifting stress and sliding lifting stress, where the static lifting stress represents the friction that has to be overcome in order to start sliding and the sliding lifting stress is the minimum friction that occurs during sliding. The difference between the static and sliding lifting stress is caused by the decreasing effective pressure during lifting at the sliding zone and the adhesion that occurs because of no movement of the slipform panel between two lifts. Both static and sliding lifting stress are closely related, but the static lifting stress can be extremely large compared to the sliding lifting stress.</p><p>The friction law can be used to describe the correlation between the net lifting stress and the effective pressure. This correlation is almost linear and applicable for both the net static and sliding lifting stress. The effective pressure, which represents the pressure between the solid particles and the slipform panel, is the difference between the normal pressure (concrete pressure against the slipform panel) and the pore water pressure. It is primarily the pressure in the pore water that is responsible for most of the variation in the effective pressure during the plastic phase and the transition period, which means that it is mainly the variation in the pore water pressure that controls the level of the lifting stress. The pore water pressure is decreasing slightly in early phase because of the settlement in the concrete. During the elastic phase, the pore water pressure start to decrease faster as an effect of the chemical shrinkage that occurs because of the cement reaction.</p><p>The pore water pressure development can be characterised by the decrease rate of the pore water pressure and the minimum pore water pressure. The minimum pore water pressure is defined as the pore water pressure at the time of maximum lifting stress. The minimum pore water pressure occurs just before the pressure is increasing at the sliding zone close to the slipform panel. It is primarily the level of the minimum pore water pressure that will decide the maximum level of the static and sliding lifting stress. The pore water pressure decrease rate and the minimum pore water pressure depends on the particle concentration and particle size distribution for the finer particles and also the air content in the concrete. Higher particle concentration and finer particle size distribution will both result in a faster pore water pressure decrease rate and a lower minimum pore water pressure. A higher air content will reduce the effect from the chemical shrinkage because the existing air volume will act as a pressure release volume, resulting in a lower pore water pressure decrease rate and a higher minimum pore water pressure.</p><p>Also the compaction method will have an impact on the decrease rate of the pore water pressure and the minimum pore water pressure, because the air content will be reduced with prolonged vibration time. Prolonged vibration will in general result in a higher lifting stress, depending on the response on the concrete during vibration. When lightweight aggregate is used in the concrete, the entrapped air in the lightweight aggregate will increase the pore water pressure and result in a lower lifting stress. Porous lightweight aggregate will have larger impact on the pore water pressure than denser lightweight aggregate.</p><p>Pressure gradients that occur between two concrete layers will affect the decrease rate of the pore water pressure. Water will “flow” from layers with younger concrete without any negative pressure to concrete layers with lower pore water pressure. This will reduce the decrease rate in the concrete layer that receives the water. In later stage the same concrete that supplied the concrete layer below with water will receive water from the concrete layer above. The pressure gradient at the joint (between two concrete layers) will be more even as a result of the water communications between the concrete layers. Evaporation of water from a fresh concrete surface will result in a faster decrease rate and a lower minimum pore water pressure because of the drying process will form menisci near the surface. The water communication is in general good in the concrete in this phase.</p><p>The time at which the minimum pore water pressure occurs will also have an impact on the minimum pressure level. A shorter period of time from the minimum pore water pressure occur to the time of initial set will result in a relatively higher minimum pore water pressure and a lower lifting stress. The minimum pore water pressure has occurred earlier when water has evaporated from an exposed concrete surface. Also when very rough slipform panel is used, the incipient vacuum between the slipform panel and the concrete is punctured early (collapse of the capillary system at the sliding zone) because of the rough panel surface and will result in a relative low lifting stress.</p><p>Both the lifting frequency and the lifting height has a considerable effect on the static lifting stress. Lower lifting height or decreased lifting frequency will both result in a lower pore water pressure and a higher static lifting stress. This is probably because the interface zone is disturbed each time the slipform panel is lifted. Less disturbance of the interface will result in a lower minimum pore water pressure. The lifting stress is decreasing during lifting as an effect of the decreasing effective pressure at the sliding zone and the reduced adhesion. The effective pressure at the sliding zone is probably at minimum and the adhesion is completely broken when the lifting stress is stabilized on a minimum level. The sliding lifting stress is also affected of the lifting frequency and the lifting height if not the minimum level is reached during the lift.</p><p>Surface damages caused by high lifting stress are not demonstrated in the vertical slipform rig. However, similar concrete mix design that has been used in a field project, where surface damages occurred, has been tested in the vertical slipform rig. The concrete mix in this field project was replaced with a new concrete mix, where no or only minor surface damages occurred after the replacement. Both concrete mixes is tested in the vertical slipform rig and the result show a considerable higher static and sliding lifting stress for the concrete mix that was used when surface damages occurred. This indicates that there are a connection between high lifting stress and risk for surface damages. This means also that concrete mixes that obtains high lifting stress in the vertical slipform rig is more exposed to surface damages than concrete mixes that has obtained lower lifting stress.</p>
855

Improvement Fatigue Performance of Threaded Drillstring Connections by Cold Rolling

Kristoffersen, Steinar January 2002 (has links)
<p>The research work presented in this thesis is concerned with analytical, numerical and experimental studies of the effect of cold rolling on the fatigue behaviour of threaded drillstring connections.</p><p>A comprehensive literature study is made of the various effects on the fatigue behaviour of residual stresses introduced by mechanical deformation of notched components. Some of the effects studied are cyclic hardening behaviour after prestraining, cyclic creep, fatigue initiation in prestrained materials, short cracks and crack growth models including crack closure. </p><p>Residual stresses were introduced in the surface of a smooth pipe by a rolling device to simulate a cold rolling process and verify the calculated residual stresses by measurements. Strain hardening and contact algorithm of the two bodies were incorporated in the FE analyses. Two significant errors were found in the commercial software package for residual stress evaluation, Restan v. 3.3.2a also called SINT, when using the Schajer method. The Schajer algorithm is the only hole-drilling algorithm without theoretical shortcomings, and is recommended when measuring large residual stress gradients in the depth directions. Using the Schajer method solved by in-house Matlab-routines good agreement between measured residual stress gradients and residual stress gradients from FE analyses was found.</p><p>Full scale fatigue tests were performed on pipes cut used drillstrings with notches of similar geometry as threads used in drillstring connections. The simulated threads consisted of four full depth helix notches with runouts at the surface. The pipe threads were cold rolled and fatigue tested in a full-scale four-point rotating bending fatigue testing rig. The test results showed that cold rolling had an effect on the crack initiating period. A major part of the fatigue life was with cracks observed at the notch root, but due to the increased fatigue crack propagation resistance the final fracture initiated at pits inside the pipe. Therefor, an optimisation of the roll geometry and rolling parameters was not possible. However, a significant fatigue life improvement was achieved. Based on experiments, a roller with similar profile as the thread root is recommended. A rolling force of maximum 20 KN is recommended to minimise the possibility of damaging the thread profile. Shallow cracks were observed typically when 5% of the fatigue life had expired. Re-rolling after 50% of expected improved fatigue life, when also short cracks were observed in the notch roots further increased the fatigue improvements. </p><p>Pretensioned small steel specimens with a notch were used to simulate cold rolled threats. The specimens were fatigue tested in tension with minimum load close to zero. Pretensioning increased the fatigue life form approximately 50 000 cycles to an infinite number of cycles. In these test non-propagating cracks of typically 0.4 mm length were found. The benefit from pretensioning gradually disappeared with increasing mean stress. FE analyses indicated that an almost instant relaxation of residual stresses to a level with no monotonic strain hardening from preloading would take place when cycled to moderate mean stress. Cycled at low mean stress, an instant relaxation of the surface layer was found in analysis. All observations from notched pretensioned fatigue specimens were in good agreement with the available literature. However, preloading was found to be strain rate dependent in tests where a pretension load held for 2 minutes gave a longer fatigue life than a sinusoidal loading-unloading cycle performed over a one minute interval.</p><p>Strain hardening was found not contributing to the fatigue life improvement, whereas the polishing effect from improved surface quality after cold rolling increased the fatigue initiation period. However, residual stress and subsequent early crack closure was the dominating effect at moderate cyclic mean loads. </p><p>The material data required to perform FE fatigue simulation studies of a full threaded cold rolled coupling incorporating make-up torque, include cyclic stress strain behaviour at various amplitudes and mean stress caused by various degrees of prestraining. Such data are not readily available today, and are only possible to obtain in carefully planned and executed experiments. Also, 3D FE model required for cold rolling analysis is extremely CPU time consuming. Consequently, cold rolling simulations could not be successfully implemented in this work.</p><p>One of the main conclusions from this work is that drillstring connections will respond differently to thread rolling at the pin or box. A significant improvement in the fatigue life of box threads from residual stresses is expected mainly from increased resistance to crack propagation. However, the compressive residual stress is sensitive to overloading in compression, and the improvement from residual stress depends strongly on the mean stress (or R-ratio). At values of R of approximately 0.6 or higher the beneficial of rolling therefore tends to disappear. At the critical locations of the pin, which are the last engaged thread or the stress relief groove, the effect of residual stresses introduced by rolling is therefore likely to be severely reduced by the high mean stress imposed during make-up of the connection. However, a beneficial effect of rolling is expected to remain due to improved surface condition and due to a possible effect of strain hardening. The net results of these factors on the fatigue performance of actual drillstrings can only be determined in full scale rotating bending tests. </p>
856

En Jämförelse av våtrum : Prefab VS platsbyggt

Volden, Henrik January 2007 (has links)
<p>I arbetet görs en jämförelse mellan platsbyggda- och prefabricerade våtrum. Jämförelsen görs utifrån kriterierna ekonomi, kvalité och miljöpåverkan.</p>
857

Projektera och producera en fuktsäker byggnad : En studie som klarlägger ansvarstagandet och hur kommunikationen mellan aktörer kan förbättras / Planning and produce for a humidity secure building : A research that clarifies the responsibilities and how the communication between actors in a building project can be improved

Engström, Tobias, Johansson, Jesper January 2007 (has links)
<p>Tidigare studier visar att ansvarsfrågan för fuktsäkerheten är oklar samt att kunskapsöverföringen mellan byggprocessens olika aktörer brister. Detta kan leda till bristande fuktsäkerhet som i sin tur kan leda till hälsoproblem för de boende.</p><p>Den 1 juni 2006 kom Boverket ut med en ny regelsamling (BBR) och som numer innehåller tydligare regler och omformulerade krav gällande fuktsäkert byggande.</p><p>Detta arbete syftar till att redovisa risker med informationsspridningen mellan byggprocessens olika skeden samt att redovisa vilka förändringar som måste göras av aktörerna för att uppfylla senaste BBR (BFS 1993:57 med ändringar t.o.m. 2006:22). Målet med arbetet är att klarlägga ansvarsantagandet i de olika skedena av processen och att bidra med bättre rutiner för fuktsäkerheten.</p><p>Arbetet grundar sig på en litteraturstudie som i teori beskriver hur aktörerna bör bedriva sitt arbete för ett fuktsäkert byggande samt redogör vilken aktör som ansvarar för vilken del av arbetet. Till arbetet har även en fallstudie genomförts, på ett byggnadsprojekt utfört i egen regi, där aktörer inom program, projektering och produktionsstadiet intervjuats. Utifrån intervjusvaren redovisas risker och förbättringsförslag med deras arbete för fuktsäkert byggande.</p><p>Resultatet av fallstudien visar att det finns en del förbättringar att genomföra. I fallstudien upprättar inte beställaren några specifika fukttekniska krav. Beställaren bör upprätta en tydlig kravformulering som fastställer tekniska krav, krav på kompetens, rutiner och egenkontroller för projektet. Kravformuleringen bör också redovisa hur kraven ska verifieras samt vilken aktör som ansvarar för att kraven uppfylls. Då beställaren upprättar en sådan kravformulering minskar oklarheter i ansvarsfrågan som vilken aktör som ansvarar för vad.</p><p>I fallstudien skickar konstruktör sina bygghandlingar till beställare som vidarebefordrar dessa till entreprenör. För att minimera kunskapsförluster och missförstånd, mellan projektering och produktion, så bör konstruktören träffa entreprenören för att konstruktören ska kunna överföra avsikter och information med sina bygghandlingar.</p><p>I studerat projekt så tar arkitekten i första hand hjälp av materialleverantörer. Det bör kopplas fler kompetensområden, i första hand en oberoende fuktsakkunnig, till projektet i ett tidigare skede. Detta ökar möjligheten för att skapa ett välutformat program.</p><p>Studerat fall är projekterat enligt tidigare BBR, men om projektet skulle vara projekterat enligt gällande BBR (BFS 1993:57 med ändringar t.o.m. 2006:22) skulle vissa förändringar behöva genomföras. För att uppfylla de nya kraven från Boverket bör en fuktsäkerhetsprojektering utföras, och till detta ska rätt kunskap anlitas om det inte redan ingår i projektet. Vidare måste entreprenören ändra sina rutiner vid mottagningskontrollen av materialet. Idag utförs inte någon fuktkvotsmätning av virket, vilket måste genomföras för att säkerhetsställa att virket inte överstiger det kritiska fukttillståndet som Boverket fastställt.</p> / <p>Previous studies show that the responsibility of humidity is vague and that the transference of the knowledge between the building project actors fails. This can lead to health problem among the users of the building.</p><p>The first of June 2006 Boverket released a new collection with rules of construction which contains more specified rules to guarantee a secure humidity construction.</p><p>The purpose with this report is to clarify what kind of changes the actors need to do, to fulfil the new rules of construction from Boverket. The purpose is also to clarify risks with how the information is transferred between actors and what kind of responsibility the actors have in the different phases of the building project.</p><p>The report is based on a study of different literary works which in theory describes how the actors should pursue their work for securing humidity and also describes which actor is responsible in the different phases of the building project. For the report a specific building project is studied where different actors in different phases of the project has been interwieved. From the replys of the interwievs the risks and improvements for securing humidity is showed.</p><p>The result of the study clarifies that improvements can be done in this project. The orderer of the project doesn’t create demands from humidity point of view. To minimize misunderstanding of where the responsible lies in the different phases of the project, the orderer should create demands and also clarify which actor who is responsible for fulfilling the demands.</p><p>In this case the design engineer sends his building papers to the orderer of the project which further sends the paper to the contractor. To minimize misunderstandings between planning and production, the design engineer should meet up with the contractor to explain his intendancy with his building papers.</p><p>In this building project the architect often listens to the supplier of material. If more knowledge is connected to an earlier phase of the building project, most of all a humidity expert, it will increase the chance for a well formed program.</p><p>To fulfil the new rules of construction from Boverket the contractor needs to change his routine for the receiving of materials.</p>
858

Fuktsäkringsarbete i ett byggprojekt : – En undersökning om hur byggprocessens aktörer arbetar för att uppnå samhällskraven / Securing humidity in a building project : -A Research about how the building process and its actors work to meet demands regarding the law.

Hansson, Linus, Nyberg, Andreas, Wahlberg, Jonas January 2006 (has links)
<p>Lagen säger att man inte får uppföra byggnader så att det riskerar människors hälsa. Trots detta uppförs byggnader så att ohälsa uppstår för de boende. Arbetet behandlar hur man i ett byggprojekt arbetar med fuktsäkring. Syftet är att undersöka hur man i projektet arbetar med att fuktsäkra byggnaderna. Målet är att lyfta fram var i processen det finns risker när det gäller fuktsäkring, och även ge förslag till förbättringar av arbetet med fuktsäkringen. En studie över lagar och förordningar har gjorts för att se vilka krav som ställs på en byggnad ur fuktsynpunkt samt hur branschregler tillämpas så att fuktproblem inte uppstår i byggnader. Intervjuer har gjorts för att se vilken roll byggnadsnämnden, entreprenören, konstruktören och leverantören har när det gäller att ställa krav på fuktsäkring. Arbetet är avgränsat till uppförandet av flerbostadshus i Karlstad där man bygger i egen regi. Resultatet visar att fuktskador riskerar att grundläggas i alla skeden i byggprocessen och att alla aktörer i projektet kan bidra till riskerna. Resultatet visar även att man är medvetna om fuktproblematiken och att större krav på dokumentation och erfarenhetsåterföring skulle minska riskerna för fuktskador. För att förbättra fuktskyddet skall man redan i programskedet upprätta en projektspecifik fuktskyddsbeskrivning gjord i samarbete med en fuktskyddssakkunnig. Man borde också informera/utbilda alla parter som riskerar bidra till fuktproblem i byggnader.</p> / <p>According to Swedish law you are not allowed to construct buildings in a way that may result in jeopardizing people’s health. Despite this fact buildings are constructed in such way that health problems accurse. This composition deals with a building-project and how its actors works regarding to humidity that effects buildings. The purpose of this essay is to look into how in a project one works with eliminating risks concerning humidity and also the level of demands that are made to secure the construction. The objective is to point out where in the building-process risks appears when it comes to securing humidity in buildings, but also to suggest how to make improvements. The method is based on a study of laws and ordinances that concerns humidity in buildings. The way the building line, and the knowledge within it, is used in a project to secure the building from humidity has also been studied. Interviews has been made to look into in what the role building department, entrepreneur, constructor and supplier has regarding to humidity in buildings. This essay is demarcated to multifamily buildings in Karlstad built in own-regime. The result shows that the risk of damage as a consequence of humidity is founded in all phases in the building-process and that all actors of the process are a part of the problem. The result also shows that actors in the project is well averred of the problem with humidity but that there is not enough demands on documentation and on how to work with experiences from earlier project. To work in a more efficient way one should draw up a description for the project regarding to the risk of humidity in the building. This description should be made in co-operation with someone who has the right knowledge concerning how to draw up a description, and that also makes the project safe from humidity point of view. The result also shows that it is necessary to educate all actors that risks contributing to the problem with humidity in buildings.</p>
859

Förslag till utökning av antalet gästboxar på Färjestadstravet / Suggestion to increase the number of boxes for guest horses on Färjestadstravet

Eriksson, Stefan January 2008 (has links)
<p>Färjestadstravet behöver utöka antalet boxplatser för gästande hästar med 30 stycken. Bör detta göras genom att bygga nya gästboxar? Eller bör nya boxar för permanentuppstallning byggas, och då bygga om några befintliga stall till gäststallar? Hur kan stallet utformas? Var på stallbacken bör stallet byggas?</p><p> </p><p>För att besvara dessa frågor har jag tittat på vilka praktiska lösningar de olika typerna av stallar behöver, samt gjort vissa ekonomiska överslagsberäkningar. Thomas Söderberg som är anläggningschef på Färjestadstravet frågade tränarna om de var intresserade av att hyra ett nybyggt stall. De flesta var positiva till detta men ingen var villig att betala högre boxhyra än de gör idag. Detta gör att det är mer fördelaktigt att bygga nya boxar för gästande hästar då dessa ger en något högre avkastning per år, samt att byggkostnaden är lägre för ett gäststall då det inte kräver lika stora utrymmen.</p><p> </p><p>Arbetet har lett fram till ett förslag på byggnad innehållande 30 gästboxar med förspänningsmöjlighet, fördelade på tre mittgångar, samt fyra dusch boxar i byggnadens södra gavel. Det nya stallet placeras bredvid infarten till stallområdet.</p> / <p>Färjestadstravet needs to increase the number of boxes for guest horses with 30. Should this be done by building new boxes for guest horses? Or should a new longtime stable be built, and some of the existing stables be rebuilt for guest horses? Which lay out is suitable for the stable? Where on the stable yard should it be located?</p><p> </p><p>To solve this, I’ve looked on which practical solutions the different type of stables needs, and made some economical estimate estimations. Thomas Söderberg who is manager over constructions on Färjestadstravet asked the trotter trainers if they were interested in renting a new stable. Most of them were interested but no one was willing to pay more in rent than they do today. That makes it more favorable to build new stables for guest horses, since they yield a little better return, and are cheaper to build, since a guest stable needs less space.</p><p> </p><p>This work has led to a recommendation of a building containing 30 boxes for guest horses with chance to shaft the horses. The 30 boxes will be divided in three passages and four shower boxes will be built in the south gable. The new building will be placed next to the entrance to the stable yard</p>
860

Checklista för projektledaren vid ROT-arbete av verksamhetslokal : En sammanfattning av risker och åtgärder

Norling, Ola, Wikström, Therese January 2006 (has links)
<p>Problemet vid ROT-arbete är att många delar av upprustningen kan orsaka tidsfördröjning, vilket är extra känsligt för projekt under stor tidspress. Om det handlar om att återställa en byggnad som inhyser en verksamhet, så arbetas det mot en mycket större tidspress än vid återställande av bostadshus. Förseningar är något som man varken har tid eller råd med. Det gäller att få igång verksamheten så fort som möjligt, dels för att inte ägarna ska förlora inkomst och dels för att försäkringsbolaget vill betala ut rätt försäkringspengar.</p><p>Examensarbetet visar de viktigaste momenten i både teori och praktik. Det har gjorts en litteraturstudie inom ämnet för att få en bred kunskapsbas. En intervju har också genomförts med en i dag erfaren projektledare, som pekat på de viktigaste arbetsuppgifterna för en projektledare i ett ROT-projekt.</p><p>Syftet är att finna de faktorer som kan försena ett ROT-projekt och precisera dessa i en checklista för att projektledaren ska kunna upprätta en säkrare tidsplanering.</p><p>Det är viktigt att projektledaren, trots det pressade tidsschemat, genomför riskhanteringsmetoden vid ROT-arbeten. En planerare som för första gången ska analysera risker med ett ROT-arbete bör gå efter riskhanteringsmallen för att undvika att förbise viktiga riskmoment och hanteringsmetoder.</p><p>Vissa av projektledarens viktiga åtaganden beskrivs inte i teorin, vilket gör det svårt för en projektledare utan tidigare erfarenhet från yrket. Därför är denna studie användbar, då den belyser både teori och praktik.</p>

Page generated in 0.0344 seconds