• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Membranbioreaktorteknik - en framtida lösning på Lundåkraverket? / Membrane bioreactors - A future solution at Lundåkra wastewater treatment plant?

South, Nicholas January 2014 (has links)
Membrane bioreactors (MBR) combined with biological phosphorous treatment (Bio-P) has been investigated if that could be an alternative to the future expansion with conventional active sludge treatment at Lundåkra wastewater treatment plant (WWTP) in the proximity of Landskrona, Sweden.The results showed that the surface demand in the biological treatment will be reduced with 67% with the MBR-alternative compared to a conventional activated sludge process. The nutrient removal in the MBR-solution was decreased or unchanged for nitrogen-, phosphorous- and organic parameters. However, the energy demand will increase with an estimated cost of approximately 1 million SEK annually. Moreover, the extra chemical consumption is estimated to cost 370 000 SEK annually.The disturbances caused by filamentous bacteria such as sludge dispersal could be resolved with MBR-technology because the membranes are not affected by these organisms. The Bio-P process combined with MBR-technology works if the wastewater recirculates from the membranes to an aerobic zone.In the proposal, there will be a new pre-treatment step, for instance hole screens. In addition, there will be an introduction of chemical precipitation in the biological treatment, use the present post-precipitation basin with lamella sedimentation as an overflow wastewater treatment and transform one of the clarifiers into a side stream hydrolysis. The new MBR-design will consist of a new basin built between the clarifiers and the lamella sedimentation building. An extended study of the MBR-alternative with respect to sludge treatment and hydraulics is required before it can be shown if that is a better solution than a conventional activated sludge process.

Page generated in 0.4077 seconds