311 |
Efektivní pokrytí potřeby tepla s pomocí solární soustavy / The effective coverage of the heat demand using solar systemVítek, Lukáš Unknown Date (has links)
This master thesis aims to design the heating system and HDW preparation in an apartment building. The first variant deals with condensation gas boiler as the only energy source, while the second variant combines the gas boilers with the solar thermal system. The apartment building is located in Prag and has three above-ground floors and a basement. In the basement is the technical room. Convectors are being used for heat distribution. The theoretical part deals with the introduction to the solar thermal system.
|
312 |
Dodávka energie pro skleníkovou produkci / Energy supply for greenhouse productionNajbrtová, Zuzana January 2021 (has links)
The import of the vegetable has prevailed in the long run over the own production. In connection with this reality and increasing demand for the food with higher quality the production greenhouse is more often built. The providing heat, cold and electricity for the year-round operation is related to the construction and working of these objects. The theoretical part of this theses describes possible ways how to cover energy consumption for the model greenhouse in Kožichovice, Třebíč region. The heat losses and the year-round heat consumption were stated for the selected model and compared with the exact values from Kožichovice. The following method of energy supply was selected based on the calculated energy consumption - the separate cogeneration unit, cooperation of several cogeneration units, a biogas station, a heat pump and central heating system. These methods of energy supply were subjected to technical and economical comparison.
|
313 |
Tepelná čerpadla ve vytápění / Heat pumps in heating systemsZaťková, Miroslava January 2013 (has links)
This master´s thesis addresses heating of the new three - storey office building, which is located in Brno Pisárky. The heating system is designed as a low-temperature system with forced circulation of water using mostly panel radiators. As the heat source was designed two variants. The first heat source is the heat pump air - water, which is installationed inside. The second heat source is a gas condensing boiler. The part of design is preparation hot water. Ventilation of the building is equal-forced. Experimental part of master´s thesis is focused on measuring the amount of electricity produced per year by photovoltaic panels on the existing house in Brno Pisárky. Thesis also includes measuring outdoor temperature and intensity of solar radiation. The result is a comparison of the need for electricity for the heat pump for heating family house, total electricity consumption family house and amount of electricity produced by photovoltaic panels.
|
314 |
Hydraulika otopných soustav / Fluid power heating systemPaták, Jiří January 2013 (has links)
The theoretical part deal with problematic of fluid power heating system. The experimental part deal with measurement of the characteristic of circulation pump and measurement of valves - ball valve. The project solves the heating and hot water preparing for the new administrative building in Žďár nad Sázavou. The building has 3 floors. As a source of heat for the winter season is designed gas boiler, for hot water preparing is also used the same gas boiler. The heat source is placed in a separately accessible room.
|
315 |
Ocelové konstrukce objektů kotelny a strojovny / Steel structures of boiler and engine roomsKrompolc, František January 2014 (has links)
A steel construction, divided into two parts, was designed for the building object of a production block of a bio power plant. The two parts separate the boiler room and the engine room. Due to the specific load caused by the operation equipment, also several plateaus, consoles, footbridges and technological constructions were designed. A system of principal pillars HEB, transversely frame-connected with plane solid girders IPE, forms the hall construction. Pillars in rows 1 and 4 are rigidly jointed to foundations. A bearing structure of the roof deck is imposed on the girders. It is composed of a system of purlins – rolled profiles type UPE. The rigidity of the roof is secured by horizontal bracing between the purlins. The construction of the boiler room is attached to the construction of the engine room, which is formed of frame-connected principal pillars HEB in rows 4,7 and 8. The roof truss IPE is designed for 12 900 mm span between rows 4 and 7 and for 4 800 mm between rows 7 and 8. The spatial rigidity of the structure is not only secured by the rigid connection of pillars and foundation combined with the frame-connected roof rungs. It is mainly maintained thanks to the system of vertical wall bracings interacting with the horizontal bracing of the roof. Between the pillar rows B, C, D, E, F and G and 8 to 9 a construction of a substation is attached. In the engine room is situated technological structure. The construction is formed by supporting frames consisting of pillars type HEA, rungs type IPE and HEA and vertical bracing of rolled profiles. Pillars type HEA are connected to foundation using articulated connection. The rigidity of the structure is secured both ways by vertical bracing and by the connection of the plateau beams with the hall girders.
|
316 |
Vytápění staveb. objektu zdroji na různé druhy paliv s vyhodnocením ekonomické výhodnosti / Heating buildings. building resources on different types of fuel in assessing economic benefitsDvořák, Václav January 2014 (has links)
This work deals with the topic „Heating buildings building resources on different types of fuel in assessing economic benefits“. On this theme is elaborated theoretical part, then the topic is applied to the specified building. The project is design central heating, water heating, water heater design power unit. The project is designed in two versions. In the first variant are the heat source gas boilers. In the second variant are the heat source heat pumps.
|
317 |
Návrh vytápění z pohledu primární energie / Proposal of heating from the perspective of the primary energyJurka, Vít January 2014 (has links)
This master´s thesis proposal addresses the heating from the perspective of primary energy in the object. The building is located in Brno and is used as a villa with a pool hall. The object of this work is the selection of appropriate variants of three heat sources (gas boiler, pellet and electric) in terms of primary energy. The project is design of the heating system chosen mode of heat, which is a pellet boiler. The theoretical part is focused on the pellets and their history, classification, properties, production, storage and transport.
|
318 |
Vytápění objektu hotelového typu plynovým médiem a alternativním zdrojem / Hotel type building heating gas and alternative media sourceByrtus, Miroslav January 2014 (has links)
Proposal for heating the building of the hotel type. The first part describes the detailed description and analysis of heat sources proposed in the third part, which are gas-fired condensing boilers, fireplaces and stoves. In the second part we find two technical solutions involvement boiler room. The third section contains solutions for selected variants.
|
319 |
Sportovní centrum / Sports centerHlaváček, Petr January 2015 (has links)
The new building sport center without cellar. The object is based on strip foundation. The footing bottom is in frost resistant depth. Construction system is in both ways. Vertical walls are made by cut bricks POROTHERM. The external cladding is replenished by thermal insulation plaster POROTHERM TO. Horizontal constructions are made by filigree ceiling panels. Stairway is made by reinforced concrete. Heating system is ensured by gas boiler.
|
320 |
Otopné plochy a mikrobiální mikroklima / Radiators and microbial microclimateRaputa, Pavel January 2015 (has links)
This master thesis describes the design of heating in a new one-storey nursery school in Kuřim. The heating systém is designed as a low-temperature systém with a forced circulation of water and a horizontal piping. Three kinds of radiators are used in the design. The panel radiators, tube radiators and free-standing convectors. In this project there are two varinats of the heat source for buliding. The first variant is two gas condensing boilers and the second variant is two heat pumps of an air/water split design. The disign includes air heating in the unit of air conditioning and hot water preparation. The experimental part of the master thesis is focused on microbial microclimate in buildings and radiators contamination by microorganisms. It contains four different experiments, their realization, results and evaluation.
|