• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 50
  • 13
  • 10
  • 9
  • 6
  • 6
  • 4
  • 3
  • 1
  • 1
  • 1
  • Tagged with
  • 123
  • 18
  • 13
  • 12
  • 12
  • 11
  • 11
  • 10
  • 9
  • 9
  • 9
  • 8
  • 8
  • 8
  • 7
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Explorer l'aube cosmique et l'époque de réionisation avec le signal 21 cm / Exploring the Cosmic Dawn and Epoch of Reionization with the 21 cm Signal

Eames, Evan 14 November 2018 (has links)
Les simulations, de plus en plus, sont capables de saisir la complexité de l'époque de réionisation, durant laquelle l'hydrogène neutre de l'Univers a été ionisé par les premières sources lumineuses. Des bases de données représentatives de la multitude de signaux possibles seront nécessaires pour contraindre les paramètres des modèles quand des observations 21~cm seront disponibles. À cette fin, et en préparation des observations à venir sur des instruments comme SKA, nous avons développé une base de données de cones de lumières EoR haute-résolution (21ssd.obspm.fr), ainsi qu'une modélisation du bruit thermique. Nous avons également développé un formalisme permettant de quantifier la différence entre les modèles de cette base de données, en utilisant le spectre de puissance et la fonction de distribution des pixels. Nous trouvons que les deux diagnostiques sont sensibles à des paramètres différents des modèles, ce qui signifie que les deux peuvent être utilisés ensemble de manière complémentaire pour extraire l'information maximale. De plus, en utilisant le code 21cmFAST, nous avons développé des stratégies pour échantillonner l'espace des paramètres d'une manière optimale (plus homogène et isotrope), afin de fournir le meilleur point de départ entrainer un réseau de neurones. Ce réseau retrouve les paramètres du modèle en se basant sur une observable. Nous observons une amélioration modérée dans la précision de ses prédictions quand nous utilisons l'échantillonnage optimisé lors de son entrainement. / Simulations are increasingly able to capture the intricacies of the Epoch of Reionization, during which the neutral hydrogen in the Universe was ionized by the first luminous sources. Databases encompassing the range of possible signals will be needed to constrain parameter values when 21~cm observations are available. In preparation for upcoming experiments such as the SKA, we have developed a database of high-resolution EoR lightcones (21ssd.obspm.fr), along with realistic thermal noise modelling. We examine frameworks with which we can quantify the difference between entries in this database, specifically with the power spectrum and pixel distribution function. We find that the two diagnostics are sensitive to different parameters, meaning they can be used together to extract maximumal information. Then, using the 21cmFAST code, we explore how to optimally sample a parameter space (so that it is more homogeneous and isotropic), in order to provide the best set-up for parameter extraction. Finally, the improved sampling is used in training a neural network. The neural network uses observables as input data, and attempts to estimate the corresponding parameter values. When the optimal sampling is used as training data, we find that the neural network is able to estimate parameter values with a modest improvement in accuracy.
12

Score-Based Approaches to Heterogeneity in Psychological Models

Arnold, Manuel 30 May 2022 (has links)
Statistische Modelle menschlicher Kognition und Verhaltens stützen sich häufig auf aggregierte Daten und vernachlässigen dadurch oft Heterogenität in Form von Unterschieden zwischen Personen oder Gruppen. Die Nichtberücksichtigung vorliegender Heterogenität kann zu verzerrten Parameterschätzungen und zu falsch positiven oder falsch negativen Tests führen. Häufig kann Heterogenität mithilfe von Kovariaten erkannt und vorhergesagt werden. Allerdings erweist sich die Identifizierung von Prädiktoren von Heterogenität oft als schwierige Aufgabe. Zur Lösung dieses Problems schlage ich zwei neue Ansätze vor, um individuelle und gruppenspezifische Unterschiede mithilfe von Kovariaten vorherzusagen. Die vorliegende kumulative Dissertation setzt sich aus drei Projekten zusammen. Projekt 1 widmet sich dem Verfahren IPC-Regression (Individual Parameter Contribution), welches die Exploration von Parameterheterogenität in Strukturgleichungsmodellen (SEM) mittels Kovariaten erlaubt. Unter anderem evaluiere ich IPC-Regression für dynamische Panel-Modelle, schlage eine alternative Schätzmethode vor und leite IPCs für allgemeine Maximum-Likelihood-Schätzer her. Projekt 2 veranschaulicht, wie IPC-Regression in der Praxis eingesetzt werden kann. Dazu führe ich schrittweise in die Implementierung von IPC-Regression im ipcr-Paket für die statistische Programmiersprache R ein. Schließlich werden in Projekt 3 SEM-Trees weiterentwickelt. SEM-Trees sind eine modellbasierte rekursive Partitionierungsmethode zur Identifizierung von Kovariaten, die Gruppenunterschiede in SEM-Parametern vorhersagen. Die bisher verwendeten SEM-Trees sind sehr rechenaufwendig. In Projekt 3 kombiniere ich SEM-Trees mit unterschiedlichen Score-basierten Tests. Die daraus resultierenden Score-Guided-SEM-Tees lassen sich deutlich schneller als herkömmlichen SEM-Trees berechnen und zeigen bessere statistische Eigenschaften. / Statistical models of human cognition and behavior often rely on aggregated data and may fail to consider heterogeneity, that is, differences across individuals or groups. If overlooked, heterogeneity can bias parameter estimates and may lead to false-positive or false-negative findings. Often, heterogeneity can be detected and predicted with the help of covariates. However, identifying predictors of heterogeneity can be a challenging task. To solve this issue, I propose two novel approaches for detecting and predicting individual and group differences with covariates. This cumulative dissertation is composed of three projects. Project 1 advances the individual parameter contribution (IPC) regression framework, which allows studying heterogeneity in structural equation model (SEM) parameters by means of covariates. I evaluate the use of IPC regression for dynamic panel models, propose an alternative estimation technique, and derive IPCs for general maximum likelihood estimators. Project 2 illustrates how IPC regression can be used in practice. To this end, I provide a step-by-step introduction to the IPC regression implementation in the ipcr package for the R system for statistical computing. Finally, Project 3 progresses the SEM tree framework. SEM trees are a model-based recursive partitioning method for finding covariates that predict group differences in SEM parameters. Unfortunately, the original SEM tree implementation is computationally demanding. As a solution to this problem, I combine SEM trees with a family of score-based tests. The resulting score-guided SEM trees compute quickly, solving the runtime issues of the original SEM trees, and show favorable statistical properties.
13

Software Configuration Management i labbmiljö

Jensen, Per January 2004 (has links)
<p>I nästan varje större organisation som arbetar med mjukvaruutveckling är ett "Software Configuration Management" (SCM) system ett måste. Anledningen till detta är att under utvecklingsfasen förändras mjukvarukoden ofta. Detta leder till att det är svårt att exempelvis spåra ändringar som gjorts tidigare i koden. Om organisationen inte har ett SCM-system blir situationen lätt kaotisk.</p><p>Att välja ett SCM-verktyg är inte enkelt. Det finns en uppsjö av verktyg på marknaden och varje leverantör erbjuder sina lösningar på problemen. Orsaken till detta är att det inte finns en standard som ett SCM-system måste följa. Det är helt och hållet upp till leverantören vad som ska ingå i systemet och hur det ska fungera. Detta gör det svårt för de organisationer som planerar att köpa in eller har köpt in ett SCM-system för att få den önskade funktionaliteten. Organisationen får helt enkelt anpassa sig efter verktyget.</p><p>Denna rapport kommer att fokusera på hur det är möjligt att få önskad funktionalitet eller kunna göra förbättringar mot ett befintligt SCM-system genom design av ett fristående verktyg som arbetar mot det i organisationen befintliga SCM-systemet.</p>
14

Cost and time effective DSM on mine compressed air systems / R. Joubert

Joubert, Hercules Phillipus Roedolf January 2010 (has links)
Implementing demand side management (DSM) is expensive and often time consuming. Eskom grants subsidies for DSM projects based on the proposed savings. The subsidy granted is not always adequate to fund all the required control equipment to achieve the desired saving. This study focuses on alternative cost– and time–effective methods to implement DSM on gold mines, specifically on the compressed–air systems where the infrastructure is inadequate, worn out or outdated. The compressors generating compressed air for mining are one of the largest electricity consumer at gold mines. By optimising the energy consumption of these compressed–air systems, the largest potential demand reduction can be achieved. This will lighten the demand load on the already overloaded national power grid. Compressed air at gold mines is mainly used for production purposes, thus the majority of savings on these systems need to be achieved during non–production hours. Fixing air leaks, optimising compressor control, meticulous planning of implementation locations and controlling air usage are all methods that were investigated to achieve alternative cost– and time–effective methods to implement DSM on mine compressed–air systems. The methods were implemented by an Energy Services Company (ESCo) at four different mines. The results achieved from these case studies are documented and discussed in this study. / Thesis (M.Ing. (Mechanical Engineering))--North-West University, Potchefstroom Campus, 2011.
15

Cost and time effective DSM on mine compressed air systems / R. Joubert

Joubert, Hercules Phillipus Roedolf January 2010 (has links)
Implementing demand side management (DSM) is expensive and often time consuming. Eskom grants subsidies for DSM projects based on the proposed savings. The subsidy granted is not always adequate to fund all the required control equipment to achieve the desired saving. This study focuses on alternative cost– and time–effective methods to implement DSM on gold mines, specifically on the compressed–air systems where the infrastructure is inadequate, worn out or outdated. The compressors generating compressed air for mining are one of the largest electricity consumer at gold mines. By optimising the energy consumption of these compressed–air systems, the largest potential demand reduction can be achieved. This will lighten the demand load on the already overloaded national power grid. Compressed air at gold mines is mainly used for production purposes, thus the majority of savings on these systems need to be achieved during non–production hours. Fixing air leaks, optimising compressor control, meticulous planning of implementation locations and controlling air usage are all methods that were investigated to achieve alternative cost– and time–effective methods to implement DSM on mine compressed–air systems. The methods were implemented by an Energy Services Company (ESCo) at four different mines. The results achieved from these case studies are documented and discussed in this study. / Thesis (M.Ing. (Mechanical Engineering))--North-West University, Potchefstroom Campus, 2011.
16

Psychometrics With R: A Review Of CRAN Packages For Item Response Theory

Rusch, Thomas, Mair, Patrick, Hatzinger, Reinhold 11 1900 (has links) (PDF)
In this paper we review the current state of R packages for Item Response Theory (IRT). We group the available packages based on their purpose and provide an overview of each package's main functionality. Each of the packages we describe has a peer-reviewed publication associated with it. We also provide a tutorial analysis of data from the 1990 Workplace Industrial Relation Survey to show how the breadth and exibility of IRT packages in R can be leveraged to conduct even challenging item analyses with versatility and ease. These items relate to the type of consultations that are carried out in a firm when major changes are implemented. We first use unidimensional IRT models just to discover that they fit do not fit well. We then use nonparametric IRT to explore the possible causes for the scaling problem. Based on the results from the exploration, we finally use a two-dimensional model on a subset of the original items to achieve a good fit with a sensible interpretation, namely that there are two types of consultations a firm may engage in: consultations with workers/representatives from the firm and with official union representatives. The different items relate mostly to one of these dimensions and firms can be scaled well along these two dimensions. / Series: Discussion Paper Series / Center for Empirical Research Methods
17

Software Configuration Management i labbmiljö

Jensen, Per January 2004 (has links)
I nästan varje större organisation som arbetar med mjukvaruutveckling är ett "Software Configuration Management" (SCM) system ett måste. Anledningen till detta är att under utvecklingsfasen förändras mjukvarukoden ofta. Detta leder till att det är svårt att exempelvis spåra ändringar som gjorts tidigare i koden. Om organisationen inte har ett SCM-system blir situationen lätt kaotisk. Att välja ett SCM-verktyg är inte enkelt. Det finns en uppsjö av verktyg på marknaden och varje leverantör erbjuder sina lösningar på problemen. Orsaken till detta är att det inte finns en standard som ett SCM-system måste följa. Det är helt och hållet upp till leverantören vad som ska ingå i systemet och hur det ska fungera. Detta gör det svårt för de organisationer som planerar att köpa in eller har köpt in ett SCM-system för att få den önskade funktionaliteten. Organisationen får helt enkelt anpassa sig efter verktyget. Denna rapport kommer att fokusera på hur det är möjligt att få önskad funktionalitet eller kunna göra förbättringar mot ett befintligt SCM-system genom design av ett fristående verktyg som arbetar mot det i organisationen befintliga SCM-systemet.
18

Emisivita a výsledek bezdotykového měření teploty / Emissivity and Result of Non-Contacting Temperature Measurement

Kotrba, Martin January 2011 (has links)
Detailed introducition of non-contact temperature measurement and correct settings of the measurement device, which has great influence on correct temperature determination, is the aim of this diploma thesis. The experimental laboratory was established to verify dependencies by Compaq CM non-contact thermometer. Conclusions and recomendations are deduced from the measurement results and their analysis.
19

Construction Management : Risker och möjligheter för byggherrar / Construction Management

Ahlinder, William, Grass, Emil January 2017 (has links)
Byggsektorn har länge använt vedertagna och traditionella genomförandeformer där bristen av förändring varit stor. Under de senaste årtiondena har emellertid flera alternativa former av processmetoder och organisationsuppbyggnader vuxit i omfattning inom den svenska byggsektorn. Detta har medfört att valet av genomförandeform har blivit allt mer komplext, där beställare gynnas av att ha goda kunskaper om olika sätt att bedriva byggprojekt. Byggherrar eftersträvar att bedriva byggprojekt med låg risk samtidigt som de ska vara kostnadseffektiva, ha kort byggtid och hålla hög kvalité. Hur väl ett byggprojekt lyckas beror till stor del på de beslut som fattas tidigt i byggprocessen. Såväl möjligheterna till riskminimering som till ändringar avtar med tiden efter att projektet initierats. Därför är ett av de viktigaste besluten för byggherrar valet av genomförandeform. En av de alternativa genomförandeformerna som ökat i användning på den svenska bygg- och fastighetsmarknaden är Construction Management (CM). Därmed har beställare fått ytterligare ett alternativ att utvärdera inför valet av rätt genomförandeform. Under utvärderingen ställs beställaren inför många olika frågor gällande vilka risker och möjligheter varje genomförandeform innebär. Denna studie undersöker vilka egenskaper CM har i avseende risker och möjligheter i relation till andra genomförandeformer samt till vilka typer av projekt som CM passar bra att användas. Vidare undersöks vilka kunskaper aktörer inom den svenska byggbranschen har om CM. Syftet med studien är att öka kunskaperna om genomförandeformen och ge förlag till förändringar i sättet som CM-projekt bedrivs.  Studien utförs med en kvalitativ metod där flertalet olika aktörer från bygg- och fastighetsbranschen intervjuas. Resultatet grundas på vilka uppfattningar, erfarenheter och reflektioner om CM som framförts av de medverkande respondenterna. Resultatet från studien visar att CM kan användas inom alla typer av byggprojekt, där fördelarna med genomförandeformen utnyttjas bäst vid komplicerade projekt med hög risknivå. Användandet av genomförandeformen kan leda till kortare byggtider, lägre pris och ge beställare möjligheter till kostnadseffektiva förändringar. Samtidigt förflyttas ett stort ansvars- och risktagande till beställaren i relation till andra valmöjligheter. Studien visar dock att aktörer inom branschen gör skillnad på kontraktsmässiga risknivåer och de risknivåer som baseras på erfarenheter av faktiska utfall med CM-projekt. Beställarens övergripande risktagande vid CM-projekt i relation till andra valmöjligheter är därmed svårt att värdera enligt de intervjuade respondenterna.Ett flertal möjliga förändringar i sättet att bedriva CM-projekt kan genomföras för att bättre möta beställares behov och därmed öka efterfrågan på genomförandeformen. Främst handlar förändringarna om att omarbeta kontrakten mellan konsulter och beställare i syfte att förflytta en del av projektriskerna till den organisation som leder byggprojektet. Därtill kan alternativa ersättningsformer för konsulter och ändringar gällande hanteringen av garantiärenden minska beställares farhågor vid CM-projekt. / Traditional and well established project delivery methods have during an extended time been used in the construction sector. During the last decades, usage of alternative process methods and organizational structures has increased within the Swedish construction sector. Thus, the process of choosing a project delivery method is getting more complex. Clients are benefitted from having good knowledge about different ways of operating construction projects. Clients’ aim for construction projects with low level of risk, at the same time the project should be efficient in terms of costs, time and quality. The outcome of a project is highly dependent on decisions being taken early in the process, though the possibility of risk-minimization and changes decreases over time. Therefore, one of the most important decisions for clients is the choice of project delivery method. Construction Management (CM) is one of the alternative project delivery methods that have increased in usage within the Swedish construction and real estate market. Consequently, clients have one additional project delivery method to evaluate in aspects of what risks and possibilities it would entail to the project. This study evaluates what risks and possibilities CM-projects have in relation to other methods and identifies when the project delivery method is most suitable to use. Further, the study examines the level of knowledge concerning CM among different actors within the Swedish construction sector. The purpose of this study is to increase the knowledge of the project delivery method and to suggest possible changes in the way CM is used.The study comprises a qualitative interview based method where a wide spread of actors from the Swedish construction and real estate market are participating. The result is founded upon the perceptions, experiences and reflections the participating actors have expressed. The result of this study shows that CM can be used in all types of projects, where the benefits of the delivery method are best used in complex projects with high levels of risk and uncertainty. The use of CM could lead to shorter project time, lower price and give the client possibilities of cost effective changes. However, the project risk and responsibility is to a greater extent held by the client. The respondents expressed a difference about the contractual risk levels and the levels based upon experience from project results, which makes it hard to evaluate if CM relates to a higher or lower degree of risk in comparison to the traditional delivery methods.    A lot of possible changes could be implemented in the way CM-projects are executed to adapt more to the clients’ needs and thereby increase the demand of the project delivery method. These changes contain modified contracts between consultants and clients to move parts of the risk to the CM-organization that holds the project management. Further changes in how the consultant fees are charged and how the warranties are handled could decrease the clients´ concerns with CM-projects.
20

Cm-faktorer för böjd och tryckt stång : Lösning av nya elementarfall / Cm-factors for flexured and compressed bar : Solution of new elemental cases

Gerland, Jonas January 2018 (has links)
I den mest grundläggande delen av Eurocode 3, SS-EN 1993-1-1, finns olika sätt att kontrollera bärförmågan för en balkpelare som utsätts för böjknäckning, d.v.s. en kombination av transversell och axiell last. Genom att använda formler där det dimensionerande värdet på andra ordningens moment ingår kan man kontrollera om balkpelaren håller för den aktuella belastningen.   Beräkningar av andra ordningens moment ger differentialekvationer som kan vara besvärliga och tidskrävande att lösa, men beräkningarna kan förenklas om man känner till den momentfaktor, kallad Cm-faktor, som tar hänsyn till momentfördelningens form i det aktuella lastfallet.   Denna rapport visar hur man kan härleda både exakta och approximativa värden på Cm-faktorer genom att studera två lastfall som skulle kunna vara av intresse för praktiskt bruk då konsolbalkar utsätts för böjknäckning. Resultaten visar att den approximativa metoden, som innebär avsevärt förenklade beräkningar, ger fullgoda resultat för de två fall som behandlas i rapporten.   Cm-faktorerna presenteras som grafer för att kunna läsas av då normalkraften som angriper i konsolbalkens fria ände varierar. I rapporten ges även bakgrunden till begreppet momentfaktor genom förklaring och beräkning av förstoringsfaktorn, ofta kallad f.

Page generated in 0.0226 seconds