• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 12
  • 8
  • 2
  • 1
  • Tagged with
  • 30
  • 30
  • 30
  • 10
  • 7
  • 6
  • 5
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

A generalized algorithm to evaluate project completion times and criticality indices for PERT networks

Soukhakian, M. A. January 1988 (has links)
No description available.
2

Judgment estimates of the moments of hypothetical performance time distributions

Rodgers, Edward Grady 08 1900 (has links)
No description available.
3

Development of a resource allocation technique based on resource-time units

McNeill, Charles Albert 05 1900 (has links)
No description available.
4

A pert simulation game

Eigel, Robert Louis 05 1900 (has links)
No description available.
5

Continuity considerations in cyclic project scheduling

Ferraz, Ronaldo Gomes 05 1900 (has links)
No description available.
6

A heuristic approach to the m x n static sequencing problem

Lappley, Erwin Neil, January 1966 (has links)
Thesis (M.S.)--University of Wisconsin--Madison, 1966. / eContent provider-neutral record in process. Description based on print version record. Bibliography: l. 93-94.
7

The application of the critical path method to aircraft maintenance

Summers, Harold Angus Charles January 1965 (has links)
The use of expensive and highly specialized equipment in any industry is only advisable if the eost of the equipment can be justified by a sufficiently large output. The greater the output, the smaller will be the cost of the equipment to be borne by each unit. Thus, once such equipment has been purchased, management endeavours to maintain output at a maximum in order to reduce unit costs or to increase profits. It is for this reason that airline managements continually endeavour to increase the utilization of jet aircraft. By increasing the number of revenue flying hours only one hour each week on one jet aircraft, an airline will realize an additional net contribution to overhead (or profits) of approximately $60,000 per year. One method of increasing utilization is to decrease the downtime of the aircraft for maintenance purposes. This requires a reduction of the total elapsed time of the maintenance check. The critical path technique has found wide application in solving the general problem of reducing the time required to complete a project which consists of many inter-related jobs. For example, the technique has been used to reduce the time required for constructing a building, for completing the periodic overhaul of a chemical plant, and for completing the Polaris Missile Development Program. It was therefore felt that the critical path technique might be of use in solving this problem of increasing the utilization of jet aircraft. This thesis, based on the results of a study carried out at Canadian Pacific Air Lines during the months of May through August, 1963, describes the various ways in which the technique can be of use in solving this problem. It was found that the technique did have a wide applicability. In the initial period of application, it would be of great value as a tool for analyzing the problems of the check. It can be used both to point out the jobs or chains of jobs which prohibit the reduction of the check time and also to direct the revision of the scheduling of these jobs in such a way that the elapsed time is reduced. This reduction of elapsed time will have the effect of increasing the number of jobs which must be completed at the earliest possible time if the check completion time is to be a minimum. As a result there will be a greater need to use the technique both for scheduling and monitoring all the jobs of the check. / Business, Sauder School of / Graduate
8

A combined critical path method--material requirements planning model for project scheduling subject to resource constraints

Smith, Dwight Edward January 1980 (has links)
No description available.
9

Management of construction resources

Preston, Robert Lowell 08 1900 (has links)
No description available.
10

RDM - relationship diagramming method /

Plotnick, Fredric Leigh. Martin, Joseph P. January 2008 (has links)
Thesis (Ph. D.)--Drexel University, 2008. / Includes abstract and vita. Includes bibliographical references (leaf 81).

Page generated in 0.0703 seconds