• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 12
  • 11
  • 4
  • 3
  • 1
  • 1
  • Tagged with
  • 49
  • 17
  • 11
  • 9
  • 8
  • 8
  • 7
  • 7
  • 7
  • 6
  • 6
  • 5
  • 5
  • 5
  • 5
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Gamma ray imaging in industrial and medical applications

Dallimore, Matthew January 2001 (has links)
No description available.
2

Desenvolvimento do plano preliminar de descomissionamento do reator IPEN/MB-01 / Preliminary decommissioning plan of the reactor IPEN/MB-01

Vivas, Ary de Souza 13 November 2014 (has links)
Em todo mundo, muitas instalações nucleares foram construídas e necessitarão serem desligadas em um determinado momento por estarem próximas do seu tempo recomendado de utilização que é de aproximadamente 40 anos. A AIEA (Agência Internacional de Energia Atômica) busca orientar e recomendar uma série de diretrizes para a realização de atividades de descomissionamento de instalações nucleares, com atenção especial aos países que não possuem um quadro regulatório legal que ampare as atividades de descomissionamento. O Brasil, até o momento, não possui uma norma específica que oriente as etapas de descomissionamento de reatores de pesquisa. Entretanto, em março de 2011 foi constituída uma comissão de estudo com a atribuição principal voltada às questões de descomissionamento das instalações nucleares brasileiras, culminando na resolução 133, de 8 de novembro de 2012, um projeto de norma que dispõe sobre o Descomissionamento de Usinas Nucleoelétricas. O Instituto de Pesquisas Energéticas e Nucleares (IPEN) possui dois reatores de pesquisa sendo um deles o reator IPEN/MB-01. O objetivo dessa dissertação de mestrado é elaborar um plano preliminar de descomissionamento desse reator de pesquisa, considerando a documentação técnica da instalação (RAS-Relatório de Análise de Segurança), as normas existentes da CNEN (Comissão Nacional de Energia Nuclear), assim como as recomendações da AIEA. Em termos de procedimentos de descomissionamento para reatores de pesquisa, este trabalho se baseou no que existe de mais moderno em experiências, estratégias e lições aprendidas realizadas e documentadas nas publicações da AIEA que abrangem técnicas e tecnologias de descomissionamento. Considerando estes conhecimentos técnicos e às peculiaridades da instalação, foi selecionada a estratégia de desmantelamento imediato, que corresponde ao inicio das atividades de descomissionamento assim que a instalação for desligada, dividindo-a em setores de trabalho. Como recurso de gerenciamento e acompanhamento do projeto de descomissionamento do reator e manutenção de registros, foi desenvolvido um banco de dados utilizando o programa Microsoft Access 2007, no qual contêm todos os itens e informações referentes ao plano preliminar de descomissionamento. O trabalho aqui descrito busca atender os requisitos, critérios técnicos e institucionais, incorporando o que se tem de mais atual em procedimentos de descomissionamento, podendo servir como guia para as demais instalações brasileiras. / Around the world, many nuclear plants were built and need to be turned off at a certain time because they are close to their recommended time of use is approximately 50 years. So the IAEA (International Atomic Energy Agency), seeks to guide and recommend a set of guidelines for the conduct of activities of nuclear facilities, with special attention to countries that do not have a framework regulatory Legal that sustain the activities of decommissioning. Brazil, so far, does not have a specific standard to guide the steps of the guidelines regarding decommissioning research reactors. However, in March 2011 a study committee was formed with the main task facing the issues of decommissioning of nuclear installations in Brazil, culminating in Resolution 133 of November 8, 2012, a standard project that treat about the Decommissioning of nucleoelectric plants. O Instituto de Pesquisas Energéticas e Nucleares (IPEN) has two research reactors one being the reactor IPEN/MB-01. The purpose of this master dissertation is to develop a preliminary plan for decommissioning this research reactor, considering the technical documentation of the facility (RAS-Safety Analysis Report), the existing standards of CNEN (National Nuclear Energy Commission), as well as IAEA recommendations. In terms of procedures for decommissioning research reactors, this work was based on what is most modern in experiences, strategies and lessons learned performed and documented in IAEA publications covering techniques and technologies for decommissioning. Considering these technical knowledges and due to the peculiarities of the facility, was selected to immediate dismantling strategy, which corresponds to the start of decommissioning activities once the installation is switched off, dividing it into work sectors. As a resource for monitoring and project management of reactor decommissioning and maintenance of records, we developed a database using Microsoft Access 2007, which contain all the items and information for the preliminary decommissioning plan. The work described here aims to meet the requirements, technical and institutional criteria, incorporating what is most current procedures and lessons learned of decommissioning, may serve as a guideline for the other brazilian facilities.
3

Desenvolvimento do plano preliminar de descomissionamento do reator IPEN/MB-01 / Preliminary decommissioning plan of the reactor IPEN/MB-01

Ary de Souza Vivas 13 November 2014 (has links)
Em todo mundo, muitas instalações nucleares foram construídas e necessitarão serem desligadas em um determinado momento por estarem próximas do seu tempo recomendado de utilização que é de aproximadamente 40 anos. A AIEA (Agência Internacional de Energia Atômica) busca orientar e recomendar uma série de diretrizes para a realização de atividades de descomissionamento de instalações nucleares, com atenção especial aos países que não possuem um quadro regulatório legal que ampare as atividades de descomissionamento. O Brasil, até o momento, não possui uma norma específica que oriente as etapas de descomissionamento de reatores de pesquisa. Entretanto, em março de 2011 foi constituída uma comissão de estudo com a atribuição principal voltada às questões de descomissionamento das instalações nucleares brasileiras, culminando na resolução 133, de 8 de novembro de 2012, um projeto de norma que dispõe sobre o Descomissionamento de Usinas Nucleoelétricas. O Instituto de Pesquisas Energéticas e Nucleares (IPEN) possui dois reatores de pesquisa sendo um deles o reator IPEN/MB-01. O objetivo dessa dissertação de mestrado é elaborar um plano preliminar de descomissionamento desse reator de pesquisa, considerando a documentação técnica da instalação (RAS-Relatório de Análise de Segurança), as normas existentes da CNEN (Comissão Nacional de Energia Nuclear), assim como as recomendações da AIEA. Em termos de procedimentos de descomissionamento para reatores de pesquisa, este trabalho se baseou no que existe de mais moderno em experiências, estratégias e lições aprendidas realizadas e documentadas nas publicações da AIEA que abrangem técnicas e tecnologias de descomissionamento. Considerando estes conhecimentos técnicos e às peculiaridades da instalação, foi selecionada a estratégia de desmantelamento imediato, que corresponde ao inicio das atividades de descomissionamento assim que a instalação for desligada, dividindo-a em setores de trabalho. Como recurso de gerenciamento e acompanhamento do projeto de descomissionamento do reator e manutenção de registros, foi desenvolvido um banco de dados utilizando o programa Microsoft Access 2007, no qual contêm todos os itens e informações referentes ao plano preliminar de descomissionamento. O trabalho aqui descrito busca atender os requisitos, critérios técnicos e institucionais, incorporando o que se tem de mais atual em procedimentos de descomissionamento, podendo servir como guia para as demais instalações brasileiras. / Around the world, many nuclear plants were built and need to be turned off at a certain time because they are close to their recommended time of use is approximately 50 years. So the IAEA (International Atomic Energy Agency), seeks to guide and recommend a set of guidelines for the conduct of activities of nuclear facilities, with special attention to countries that do not have a framework regulatory Legal that sustain the activities of decommissioning. Brazil, so far, does not have a specific standard to guide the steps of the guidelines regarding decommissioning research reactors. However, in March 2011 a study committee was formed with the main task facing the issues of decommissioning of nuclear installations in Brazil, culminating in Resolution 133 of November 8, 2012, a standard project that treat about the Decommissioning of nucleoelectric plants. O Instituto de Pesquisas Energéticas e Nucleares (IPEN) has two research reactors one being the reactor IPEN/MB-01. The purpose of this master dissertation is to develop a preliminary plan for decommissioning this research reactor, considering the technical documentation of the facility (RAS-Safety Analysis Report), the existing standards of CNEN (National Nuclear Energy Commission), as well as IAEA recommendations. In terms of procedures for decommissioning research reactors, this work was based on what is most modern in experiences, strategies and lessons learned performed and documented in IAEA publications covering techniques and technologies for decommissioning. Considering these technical knowledges and due to the peculiarities of the facility, was selected to immediate dismantling strategy, which corresponds to the start of decommissioning activities once the installation is switched off, dividing it into work sectors. As a resource for monitoring and project management of reactor decommissioning and maintenance of records, we developed a database using Microsoft Access 2007, which contain all the items and information for the preliminary decommissioning plan. The work described here aims to meet the requirements, technical and institutional criteria, incorporating what is most current procedures and lessons learned of decommissioning, may serve as a guideline for the other brazilian facilities.
4

An analysis to the main economic drivers for offshore wells abandonment and facilities decommissioning

Wiegand, Sandra Milena 30 September 2011 (has links)
Decommissioning and abandonment is a relevant issue in the petroleum industry because of the complex operations involved and the results after the decision has been made. Several factors could lead to abandoning wells and decommissioning platforms, among others hurricanes, production decline, economic limit, etc. Decommissioning and abandonment operations have a great impact in the revenue stream which is either lost or temporarily deferred depending on the situation. Every year between 100-150 platforms are decommissioned and approximately 620 wells are abandoned in the Gulf of Mexico. A case-by-case scenario should be revised on an annual basis and all the possible options to be considered and submitted to the Government. This thesis presents an overview of the topic and an analysis on when decommissioning and abandoning alternatives are recommended for the optimization of the economical resources. / text
5

A historical site assessment of the Georgia Tech Research Reactor

Fort, Emily Minatra 05 1900 (has links)
No description available.
6

The radiation tolerance and development of robotic platforms for nuclear decommissioning

Nancekievill, Matthew January 2018 (has links)
There is an increasing desire to deploy low-cost robotic systems in nuclear decommissioning environments. These environments include long-standing nuclear fuel storage ponds such as those at the Sellafield site in Cumbria, UK as well as areas affected by expulsion of radioactive material from sites such as the Fukushima accident in Japan 2011. An area of concern for the successful deployment of robotic platforms in a radioactive field is their radiation tolerance. It is necessary to understand how the low-cost components used within robotic platforms react to radiation exposure in a nuclear decommissioning environment. This thesis discusses the radiation tolerance of multiple commercial-off-the-shelf (COTS) components that are commonly used within a robotic platform up to an expected yearly total dose of 5 kGy(Si). It was found that COTS voltage regulators are susceptible to gamma exposure, however, development of a discrete voltage regulator showed an increased tolerance to radiation under certain load and temperature conditions. Inertial measurement units were also investigated and found to be susceptible to a total ionising dose.
7

OFFSHORE WIND FARM DECOMMISSIONING: INTRODUCING A MULTI-CRITERIA DECISION AID APPROACH

Kerkvliet, Hans January 2015 (has links)
The objective of this Thesis is to develop a methodological framework to guide the decision maker in selecting a decommissioning method for offshore wind farms which is supported by the majority of relevant stakeholders. Initially, a literature review has been conducted to find out which methods are available to decommission an off-shore wind farm and which criteria can influence the outcome.Two methods have been found in literature, namely partial and total removal of the foundation. Furthermore, twenty one (21) criteria have been found which could influence the results. These criteria can be divided in four categories which are economical, environmental, social and technical.Subsequently, a methodological framework was developed that included four steps. First, the possible decommissioning methods should be identified. Following on that, information should be collected and stakeholders should be selected. Subsequently, criteria should be selected and as last a multi criteria decision aid method should be used. It is expected that this procedure would lead to a decommissioning method which is supported by most of the stakeholders.To validate the methodological framework, a case study in the Netherlands has been selected. For this case study, four (4) stakeholders were identified and eleven (11) criteria were assessed. The outranking multi-criteria decision aid method PROMETHEE II was selected and results were obtained. Analyzing the results, it was possible to conclude that only one stakeholder preferred the total removal method while the other three stakeholders preferred the partial removal method.
8

Nuclear Waste Disposal and Decommissioning: Are Costs Too High?

Jones, Kevin Andrew 04 1900 (has links)
<p> The great controversy surrounding the use of nuclear power as an electrical source has been further augmented by the problems associated with nuclear waste disposal and nuclear plant decommissioning. This paper focuses on the aspects and estimated costs of waste disposal and decommissioning. Comparison of cost estimates done by independent studies with those done by Ontario Hydro indicate that Hydro is grossly underestimating the costs of waste disposal and decommissioning. This result leads to the conclusion that Ontario Hydro is undervaluing the costs of nuclear waste disposal and decommissioning to justify its use of nuclear power in Ontario. Wide variations in cost estimates for decommissioning, and a lack of cost estimates for nuclear waste disposal, indicate that extensive research is needed in the discipline of cost estimation for waste disposal and decommissioning.</p> / Thesis / Candidate in Philosophy
9

Considerações sobre o descomissionamento do reator de pesquisa IEA-R1 e futuro de suas instalações após o seu desligamento / Considerations about decommissioning of the IEA-R1 research reactor and the future of its instalations after shutdown

Frajndlich, Roberto 19 December 2014 (has links)
O Reator Nuclear de Pesquisa IEA-R1 em operação desde 1957 no Instituto de Pesquisas Energéticas e Nucleares (IPEN-CNEN/SP) é um dos reatores mais antigos do mundo em operação. Em algum momento no futuro, a exemplo de outros reatores, será desligado definitivamente. Antes de chegar este momento a organização operadora precisa planejar o futuro de suas instalações e definir o destino que pretende dar aos equipamentos e materiais radioativos e não radioativos que se encontram no interior das instalações. Estas questões devem estar contidas no chamado \"Plano de Descomissionamento Preliminar da Instalação\" que é o tema deste trabalho. O trabalho apresenta inicialmente uma visão geral sobre este tema e relaciona os objetivos gerais e específicos para sua realização, descrevendo a seguir, as diretrizes que a organização operadora deve considerar para formulação de um plano de descomissionamento. A estrutura atual do setor nuclear brasileiro enfatizando principalmente as normas utilizadas no gerenciamento do rejeito radioativo é apresentada. Uma descrição dos principais equipamentos do reator IEA-R1 que constituem o seu inventário radioativo e não radioativo é apresentada. O trabalho enfatiza também a experiência adquirida pelo corpo técnico do reator com as reformas e modificações realizadas na instalação durante sua vida útil. Esta experiência pode ser de grande valia por ocasião do descomissionamento do reator no futuro. Um experimento usando o método de espectrometria gama de alta resolução e cálculo computacional através da teoria de Monte Carlo foi realizado com o objetivo de se obter uma estimativa do volume de rejeito radioativo gerado pelo desmantelamento das paredes de concreto da piscina do reator. O custo do descomissionamento em função da estratégia escolhida é determinado utilizando o código CERREX. Por fim, é realizada uma discussão sobre as diferentes estratégias consideradas. Na base destas discussões conclui-se que a estratégia mais vantajosa a ser adotada no caso deste reator é aquela que preserva o seu prédio e instalações anexas, tendo em vista o grande volume de rejeito radioativo e custos sensivelmente maiores que resultariam com o seu desmantelamento. É sugerida a preservação de parte das equipes de operação, manutenção, proteção radiológica e física da instalação e utilização do prédio do reator e anexos para divulgação da energia nuclear através de sua transformação em um museu, uma vez que este foi o primeiro reator nuclear construído no Brasil e, desde sua inauguração, tem sido utilizado como forma de divulgação da energia nuclear no país. / The IEA-R1 Nuclear Research Reactor, in operation since 1957, in the Instituto de Pesquisas Energéticas e Nucleares (IPEN-CNEN/SP), is one of the oldest research reactors in the world. However at some point in time in the future, as example of the other reactors, it will be shutdown definitively. Before that time actually arrives, the operational organization needs to plan the future of its installations and define the final destination of equipment and radioactive as well as non-radioactive material contained inside the installations. These and other questions should be addressed in the so called Preliminary decommissioning plan of the installation, which is the subject of this work. The work initially presents an over view about the theme and defines the general and specific objectives describing, in succession, the directions that the operating organization should consider for the formulation of a decommissioning plan. The present structure of the Brazilian nuclear sector emphasizing principally the norms utilized in the management of radioactive waste is also presented. A description of principle equipment of the IEA-R1 reactor which constitutes its inventory of radioactive and non-radioactive material is given. The work emphasizes the experience of the reactor technicians, acquired during several reforms and modifications of the reactor installations realized during its useful life time. This experience may be of great help for the decommissioning in the future. An experiment using the high resolution gamma spectrometric method and computer calculation using Monte Carlo teory were performed with the objective of obtaining an estimate of the radioactive waste produced from dismantling of the reactor pool walls. The cost of reactor decommissioning for different choices of strategies was determined using the CERREX code. Finally, a discussion about different strategies is presented. On the basis of these discussions it is concluded that the most advantageous strategy that can be adopted in the case of this reactor is the one which preserves its building and installations, in view of the fact that a large volume of radioactive waste which will be produced and consequently a much higher costs that will result if dismantling of the reactor is decided. It is suggested that a part of the team of the technicians of reactor operation and maintenance and radiation protection services should be retained and the reactor with its building and annexes should be used for disseminating the information about the nuclear energy by transforming it in to a museum. This has been the first nuclear reactor built in Brazil and since its inauguration, has been, constantly utilized for disseminating information about the nuclear energy in the country.
10

Considerações sobre o descomissionamento do reator de pesquisa IEA-R1 e futuro de suas instalações após o seu desligamento / Considerations about decommissioning of the IEA-R1 research reactor and the future of its instalations after shutdown

Roberto Frajndlich 19 December 2014 (has links)
O Reator Nuclear de Pesquisa IEA-R1 em operação desde 1957 no Instituto de Pesquisas Energéticas e Nucleares (IPEN-CNEN/SP) é um dos reatores mais antigos do mundo em operação. Em algum momento no futuro, a exemplo de outros reatores, será desligado definitivamente. Antes de chegar este momento a organização operadora precisa planejar o futuro de suas instalações e definir o destino que pretende dar aos equipamentos e materiais radioativos e não radioativos que se encontram no interior das instalações. Estas questões devem estar contidas no chamado \"Plano de Descomissionamento Preliminar da Instalação\" que é o tema deste trabalho. O trabalho apresenta inicialmente uma visão geral sobre este tema e relaciona os objetivos gerais e específicos para sua realização, descrevendo a seguir, as diretrizes que a organização operadora deve considerar para formulação de um plano de descomissionamento. A estrutura atual do setor nuclear brasileiro enfatizando principalmente as normas utilizadas no gerenciamento do rejeito radioativo é apresentada. Uma descrição dos principais equipamentos do reator IEA-R1 que constituem o seu inventário radioativo e não radioativo é apresentada. O trabalho enfatiza também a experiência adquirida pelo corpo técnico do reator com as reformas e modificações realizadas na instalação durante sua vida útil. Esta experiência pode ser de grande valia por ocasião do descomissionamento do reator no futuro. Um experimento usando o método de espectrometria gama de alta resolução e cálculo computacional através da teoria de Monte Carlo foi realizado com o objetivo de se obter uma estimativa do volume de rejeito radioativo gerado pelo desmantelamento das paredes de concreto da piscina do reator. O custo do descomissionamento em função da estratégia escolhida é determinado utilizando o código CERREX. Por fim, é realizada uma discussão sobre as diferentes estratégias consideradas. Na base destas discussões conclui-se que a estratégia mais vantajosa a ser adotada no caso deste reator é aquela que preserva o seu prédio e instalações anexas, tendo em vista o grande volume de rejeito radioativo e custos sensivelmente maiores que resultariam com o seu desmantelamento. É sugerida a preservação de parte das equipes de operação, manutenção, proteção radiológica e física da instalação e utilização do prédio do reator e anexos para divulgação da energia nuclear através de sua transformação em um museu, uma vez que este foi o primeiro reator nuclear construído no Brasil e, desde sua inauguração, tem sido utilizado como forma de divulgação da energia nuclear no país. / The IEA-R1 Nuclear Research Reactor, in operation since 1957, in the Instituto de Pesquisas Energéticas e Nucleares (IPEN-CNEN/SP), is one of the oldest research reactors in the world. However at some point in time in the future, as example of the other reactors, it will be shutdown definitively. Before that time actually arrives, the operational organization needs to plan the future of its installations and define the final destination of equipment and radioactive as well as non-radioactive material contained inside the installations. These and other questions should be addressed in the so called Preliminary decommissioning plan of the installation, which is the subject of this work. The work initially presents an over view about the theme and defines the general and specific objectives describing, in succession, the directions that the operating organization should consider for the formulation of a decommissioning plan. The present structure of the Brazilian nuclear sector emphasizing principally the norms utilized in the management of radioactive waste is also presented. A description of principle equipment of the IEA-R1 reactor which constitutes its inventory of radioactive and non-radioactive material is given. The work emphasizes the experience of the reactor technicians, acquired during several reforms and modifications of the reactor installations realized during its useful life time. This experience may be of great help for the decommissioning in the future. An experiment using the high resolution gamma spectrometric method and computer calculation using Monte Carlo teory were performed with the objective of obtaining an estimate of the radioactive waste produced from dismantling of the reactor pool walls. The cost of reactor decommissioning for different choices of strategies was determined using the CERREX code. Finally, a discussion about different strategies is presented. On the basis of these discussions it is concluded that the most advantageous strategy that can be adopted in the case of this reactor is the one which preserves its building and installations, in view of the fact that a large volume of radioactive waste which will be produced and consequently a much higher costs that will result if dismantling of the reactor is decided. It is suggested that a part of the team of the technicians of reactor operation and maintenance and radiation protection services should be retained and the reactor with its building and annexes should be used for disseminating the information about the nuclear energy by transforming it in to a museum. This has been the first nuclear reactor built in Brazil and since its inauguration, has been, constantly utilized for disseminating information about the nuclear energy in the country.

Page generated in 0.0277 seconds