Spelling suggestions: "subject:"discretizations.simulation"" "subject:"tischtennissimulation""
1 |
AN ANALYSIS AND COMPARISON OF DISTRIBUTED OPTIMISTIC TIME SIMULATION USING THE SPEEDES AND WARP IV SIMULATORSBRAND, JESSE EDWARD 28 September 2005 (has links)
No description available.
|
2 |
Experiments in distributed memory time warpSimmonds, Robert W. J. January 1999 (has links)
No description available.
|
3 |
Reducing Uncertainty in Production System Design through Discrete Event Simulation : A case study at Volvo Construction EquipmentEtxagibel Larrañaga, Asier, Loschkin, Julia January 2016 (has links)
In a market environment that is subject to continuous changes, companies need to adapttheir production systems in order to maintain the competitive edge. Current literatureshows that with a successful production system design, higher levels of output, eciencyand quality can be achieved.However, designing a production system is done infrequently and therefore tends tolack experience. As a result, design decisions have to be made under uncertainty due toa lack of information, structure and knowledge. In fact, the success of a design process isdirectly linked to the level of uncertainty.The purpose of this thesis is to reduce uncertainty in production system design throughDiscrete Event Simulation before an assembly system is implemented. Therefore, a theoreticalstudy was carried out dening types and sources of uncertainty in productionsystem design. Parallel to the theoretical study, a case study in Volvo ConstructionEquipment Operations Hallsberg was conducted. Discrete Event Simulation was testedas a tool to reduce uncertainty in production system design.The analysis illustrates the observed sources of uncertainty in production systemdesign cover a process, organizational, corporate, market and cultural context.The relevant uncertainty types identied in the case study in Volvo ConstructionEquipment Operations Hallsberg were environmental, system, technical, structural,temporal, lack of knowledge and lack of information. The information providedby the Discrete Event Simulation in order to reduce uncertainty are in form ofKPIs, process structure and visualization. The provided information had a positiveimpact on the degree of technical uncertainties, the lack of knowledge and thelack of information. As a result, the level of uncertainty in the Volvo ConstructionEquipment Operations Hallsberg future line designing process was reduced.
|
4 |
Lifecycle cost analysis for modular design of solar power systemsIrudayaraj, Prashanth Philip 27 May 2016 (has links)
Solar power systems are becoming increasingly popular due to the fact that solar power can offer time and money saving solutions for off-grid and grid-connected homes, cabins, and businesses with clean and affordable energy. However, there are still significant opportunities to reduce the cost of solar power systems by optimizing system design. This paper presents a methodology for evaluating the lifecycle labor costs of solar power systems. This methodology can help optimize system designs relative to cost. It can also support solar power system selection decisions based on a holistic lifecycle view. The methodology accomplishes this by first presenting a method to evaluate the modularity of competing systems, or design variants. It then describes a method of gathering data and modeling the systems so that it can be communicated to relevant stakeholders. Finally, it uses discrete event simulation to generate an estimate of relative lifecycle labor cost performance. Verification and validation of the methods described are presented through a case study of the MegaModule residential solar power system, designed by the team at GTRI. The paper concludes with a review of limitations and proposed future work.
|
5 |
Hypothesis test of a new line balancing approach with dynamic allocation of assembly operationsTroitiño Malavasi, Bruno Matias, Muñoz Llerena, Alejandro January 2013 (has links)
Assembly lines are no longer systems designed to produce as much as possible at the lower cost. Nowadays several factors such as mass customization and variation in demand have led the manufacturers to consider the flexibility of the assembly systems as one of the most important facts to take into account when designing an assembly line. In this context, this study attempts to test a new paradigm of the workload balance, which is based on a dynamic allocation of the assembly operations. In order to test the hypothesis, a real assembly system of engines has been used as a base model to implement the new approach. The work developed, uses the simulation as a means to carry out the study, which has required the development of several simulation scenarios. The hypothesis has been studied from two different approaches; on one hand a total dynamic allocation of assembly operations, which was expected to cause a wide operational range of the stations. On the other hand, the second approach implements a flow control which aims to reduce the operational range and workload fluctuations. The results obtained show a significant improvement of the system performance in comparison with the current assembly line. It has been found that any improvement implemented in the system is directly reflected in the total performance of the line, regardless if the improvement is made in a system constraint. Moreover, the results have proven a better response of the system to changes in the frequency of models production. Finally, based on the results, this study suggests several paths of future work in order to acquire the needed information to implement the hypothesis in the real world context. / Flexa project
|
6 |
Increasing the Daily Throughput of Echocardiogram Patients using Discrete Event SimulationGandhi, Ronak 22 November 2013 (has links)
Appointment scheduling involves picking a strategy for sequencing patient appointments such that the wait time per patient is minimized and the idle time and overtime for the doctor are minimized. The goal of this project is to increase the number of scans per day at the echocardiogram clinic in the Hospital for Sick Children. The objectives were realized by performing simulations of the workflow of the echo clinic using simulation software. The simulation model did not precisely reflect the echo clinic, and the disparity was attributed to limitations in the simulation model. Nevertheless, the user accepted the model and six different policy change scenarios were explored. All six scenarios yielded significant increases in average scans per day per sonographer. Scenario IV, which eliminated the use of sonographer schedules, was recommended to be implemented due to ease of implementation and lack of negative effect on patient wait time and sonographer overtime.
|
7 |
Increasing the Daily Throughput of Echocardiogram Patients using Discrete Event SimulationGandhi, Ronak 22 November 2013 (has links)
Appointment scheduling involves picking a strategy for sequencing patient appointments such that the wait time per patient is minimized and the idle time and overtime for the doctor are minimized. The goal of this project is to increase the number of scans per day at the echocardiogram clinic in the Hospital for Sick Children. The objectives were realized by performing simulations of the workflow of the echo clinic using simulation software. The simulation model did not precisely reflect the echo clinic, and the disparity was attributed to limitations in the simulation model. Nevertheless, the user accepted the model and six different policy change scenarios were explored. All six scenarios yielded significant increases in average scans per day per sonographer. Scenario IV, which eliminated the use of sonographer schedules, was recommended to be implemented due to ease of implementation and lack of negative effect on patient wait time and sonographer overtime.
|
8 |
The safe design of computer controlled pipeless batch plantsMushtaq, Fesil January 2000 (has links)
High profit (low volume) products are very attractive economically, and are influencing the direction of manufacture towards product based batch processes. One new system which has a great deal of potential is a "pipeless" plant, in which the reactor moves to different areas of the plant where heating, agitation etc. takes place. There are obvious advantages in its use in providing a means of quickly responding to fast market changes while maintaining high product quality with reduced waste. The basic concept has been successfully demonstrated with several production plants already in operation, mainly in Japan. Nevertheless the safety issues associated with pipeless plants have not been dealt with. Three main areas of further work have been identified in the safe design of computer controlled pipeless batch plants: process, computer control, and scheduling safety. In essence it is a batch process that is carried out, and therefore entails all the safety issues associated with a batch process, such as the sharing of resources. As with all new processes, it is necessary to identify and eliminate as many hazards as possible at the design stage. Computers can introduce hazards as well as benefits. There is extensive use of computer control in automated pipeless plants, and the primary manner in which problems occur is through hardware and software failures. Possible hazards need to be identified and eliminated at the design stage, without losing the benefits of plant flexibility and speed of product changeover. Scheduling is usually concerned with optimum product output, and does not consider safety. One of the biggest problems with moving reactors is collisions. To overcome, or minimise the possibility of this problem, the plant layout and schedule require careful consideration. Simulation is a very useful tool for demonstrating the interaction between the two. The aim of this research is to develop an integrated approach to hazard identification and safety requirement specification. The results of which should be a methodology that allows the user to produce a safe design for an economically attractive pipeless plant for batch processes.
|
9 |
Statistical Analysis of Treatment Compliance for Clinical Trials using Electronic Compliance MonitoringSirois, Jean-Karl January 2015 (has links)
Compliance, the extent to which patients follow a medication regimen, has been recognized as one of the most serious problems facing medical practice today. Recent developments in assessing compliance include electronic compliance monitors (ECM), devices that record the date and time of the release of medication from its original container. This allows utilizing ECM compliance data in statistical analyses related to clinical trials.
This thesis proposes ways of dealing with the time-varying nature of compliance. We examine the compliance behaviour from real ECM data through statistical analysis of compliance rate, followed by a time-to-event analysis with respect to first noncompliance event. Then, using discrete event simulation and proportional hazards models we compare analyses using a fixed treatment covariate and time-varying compliance covariate based on pharmacokinetic principles in estimating treatment effect. We observe a reduction of up to 40% in EMSE in favour of the latter model for treatment effect estimation.
|
10 |
Simulation Modeling and Analysis of Adjustable Service-Rate Queueing Models that Incorporate Feedback ControlBabin, Paul D 11 December 2015 (has links)
Research shows that in a system model, when the production rate is adjusted based on the number of items in queue, the nature of the model changes from an open-loop queueing system to a closed-loop feedback control system. Service-rate adjustment can be implemented in a discrete event simulation model, but the effect of this adjustment has not been thoroughly analyzed in the literature. This research considers the design of feedback signals to generate realistic simulation models of production system behavior. A series of simulation experiments is conducted to provide practical guidance for simulation modelers on how adding a service-rate adjustment feedback loop to a queueing system affects system performance.
|
Page generated in 0.1238 seconds