Spelling suggestions: "subject:"0nvironmental impact assessment,"" "subject:"byenvironmental impact assessment,""
1 |
The utilization of EIA techniques in food and cash crop systems of BrazilSantos, James Pimentel January 1992 (has links)
No description available.
|
2 |
Swedish environmental quality criteria : the challenge of classifying surface waters /Lindberg, Johanna. January 2001 (has links) (PDF)
Lic.-avh. Uppsala Sveriges lantbruksuniversitet. / Härtill 2 uppsatser.
|
3 |
The development of environmental assessment processes for projects within the water environmentHickie, David S. January 1998 (has links)
One of the major tools for assisting in the implementation of sustainable development is environmental assessment (EA). This thesis has sought to develop a model and associated techniques required to provide an effective and efficient EA of projects in the water environment. The challenge has been to integrate a number of disparate elements into a cohesive model that provides workable procedures and outputs. The conceptual elements of the EA process have included the needs of environmental ethics and values; the political decision-making processes; current legislation and policy; the communication of infonnation for a range internal and external stakeholders and decisionmakers; the links with technical and economic issues; and The Environmental Agency's project management systems.
|
4 |
The environmental process performance toolAubrey, Heidi January 1998 (has links)
No description available.
|
5 |
LHDA 1000 impact assessment : impact assessment reportAvis, Jeremy Estrup January 1993 (has links)
Summary in English. / The purpose of this report is to present an impact assessment of two possible access routes to the Mohale Dam in Lesotho, namely the Western Access Road and the Least Cost Alternative Route. It is an academic work to demonstrate an adequate grasp of principles, methods and techniques appropriate to the assessment, termed LHDA 1000. The water resources of Lesotho are being exploited to augment the current supply to the PWV industrial area of the Republic of South Africa, in terms of the Lesotho Highlands Water Project. This project is being implemented in phases. Phase lA, currently being constructed, involves the damming of the Malibamatso River at Katse in the Maluti Mountains (Figure1), a transfer tunnel through the mountains, a hydroelectric power station at 'Muela in Lesotho, and a delivery tunnel under the Caledon River to the Ash River (a tributary of the Vaal River which feeds the primary PW impoundment, the Vaal Dam) in the South Africa.
|
6 |
A socio-economic impact assessment of the future closure of a diamond mine in Namaqualand, South Africa : planning for mine closure a decade in advanceMackenzie, Andrew G January 1992 (has links)
Bibliography: pages 56-7. / De Beers Namaqualand Mines (DBNM) have appointed the Environmental Evaluation Unit to undertake an impact assessment of mine closure. According to recent estimates DBNM anticipate that their diamond mining operations in Namaqualand will have to be closed in approximately ten years time. DBNM requested that the study focus on the socio-economic implications of mine closure within the regional context of Namaqualand and not the broader context of South Africa. It is anticipated that the results and recommendations of the study will be used by DBNM in planning for mine closure. The aims and objectives of the study are: 1) To assess the socio-economic consequences of future mine closure. 2) To recommend actions that will mitigate the impacts of mine closure. The aims and objectives of this report are to: 1) Fulfil the academic requirements of the degree. 2) Assess and evaluate information collected during the data collection phase of this project (contained in the Baseline Information Report) and to present these findings clearly and concisely, highlighting significant impacts and options for mitigation. 3) To communicate these findings in a way as would make them useful to both the client as the decision-maker and the interested and affected parties.
|
7 |
Socio-economic impact assessment of the proposed closure of De Beers Namaqualand diamond mines by the year 2005 : main reportGreeff, Karen Liane January 1993 (has links)
Bibliography: pages 65-67. / In 1991 the Environmental Evaluation Unit (EEU) of the University of Cape Town was appointed by DBNM to undertake a socio-economic impact assessment of the proposed closure of DBNM by the year 2005. According to De Beers, the source of viable diamond ore is finite and unless technological advances or market fluctuations make the reserves economically viable, the mine has no option but to shut down its operations. This is anticipated to have major social and economic impacts on the region and DBNM. The emphasis is on regional impacts i.e. the Namaqualand Magisterial District. However, due to the concentration of employees originating from the Herschel District in the Transkei, special cognisance is taken of impacts likely to occur there. Therefore, the two main purposes of this report are to: * identify and evaluate the potential major socio-economic impacts arising out of the closure of De Beers Namaqualand Mines (DBNM), * determine mitigatory action which will reduce negative impacts and optimize positive impacts.
|
8 |
An environmental evaluation system in the planning process of quarries in South AfricaHoogervorst, Arend January 1985 (has links)
The historical framework and background to the process of approving quarries for construction materials in South Africa is examined in depth. In order to produce a proposed Environmental Evaluation System for the assessment of quarries in South Africa, the interrelationships of Quarries and the Environment are briefly examined philosophically. Environmental Impact terminology and Environmental Impact Assessment methodologies, techniques and procedures are also discussed.
|
9 |
Solar PEIS Orientation TalksStoffle, Richard W. January 2013 (has links)
These presentations were designed to provide orientation information for the Solar Energy Programmatic Environmental Impact Statement.
|
10 |
Screening of EIA in the Free State Province : a comparative analysis between the 1997 and 2006 EIA Regulations / C.N.J. WelmanWelman, Coert Nicolaas Jacobus January 2008 (has links)
Thesis (M. Environmental Management)--North-West University, Potchefstroom Campus, 2009.
|
Page generated in 0.3462 seconds