151 |
A Study of the Recreational Impact on Nolin Flood Control Reservoir in West Central KentuckyAdedibu, Afolabi 01 May 1975 (has links)
The purposes of this study are: (1) to consider factors that influenced the creation of Nolin Reservoir, and the selection of its recreation sites, (2) to consider the growth and the variations in attendance and participation in activities as a function of quantity and quality of available facilities and accessibility, and (3) to trace the changes that the creation of the reservoir has brought on the surrounding land use, value and ownership. Through the use of questionnaires, interviews and field investigations, the purposes were accomplished.
Nolin Reservoir was constructed by the Army Corps of Engineers. After extensive study, the cost and availability of materials for construction were found to be the major factors in selecting the dam site and public use areas.
Attendance and participation at the reservoir and at particular recreation sites were found to vary. Such factors as the physical setting, accessibility, quantity and quality of facilities, and distance of each center to an urban area were found to have played significant roles in the analysis.
Tracing the changes in land use, value and ownership, it was determined that agricultural use has been converted into recreational use. This change has brought about other changes. Land values began to rise. In eleven years (1964-1974), land values have increased about 500 percent. The increase in land value had induced many types of land ownerships in the basin. Developers became active, and subdivisions were introduced in 1964. By 1974, there were 75 subdivisions in the basin. Many farmers converted their arable land into housing development and commercial uses of land have also developed.
|
152 |
Environmental and landscape improvements to the engineering orientatedSan Tin East Main Drainage Channel design莊景彬, Chong, King-pan, Derek. January 2001 (has links)
published_or_final_version / Architecture / Master / Master of Landscape Architecture
|
153 |
An assessment of scale issues related to the configuration of the ACRU model for design flood estimationChetty, Kershani. January 2010 (has links)
There is a frequent need for estimates of design floods by hydrologists and engineers for the design of hydraulic structures. There are various techniques for estimating these design floods which are dependent largely on the availability of data. The two main approaches to design flood estimation are categorised as methods based on the analysis of floods and those based on rainfall-runoff relationships. Amongst the methods based on the analysis of floods, regional flood frequency analysis is seen as a reliable and robust method and is the recommended approach. Design event models are commonly used for design flood estimation in rainfall-runoff based analyses. However, these have several simplifying assumptions which are important in design flood estimation. A continuous simulation approach to design flood estimation has many advantages and overcomes many of the limitations of the design event approach. A major concern with continuous simulation using a hydrological model is the scale at which should take place. According to Martina (2004) the “level” of representation that will preserve the “physical chain” of the hydrological processes, both in terms of scale of representation and level of description of the physical parameters for the modelling process, is a critical question to be addressed. The objectives of this study were to review the literature on different approaches commonly used in South Africa and internationally for design flood estimation and, based on the literature, assess the potential for the use of a continuous simulation approach to design flood estimation. Objectives of both case studies undertaken in this research were to determine the optimum levels of catchment discretisation, optimum levels of soil and land cover information required and, to assess the optimum use of daily rainfall stations for the configuration of the ACRU agrohydrological model when used as a continuous simulation model for design flood estimation. The last objective was to compare design flood estimates from flows simulated by the ACRU model with design flood estimates obtained from observed data. Results obtained for selected quaternary catchments in the Thukela Catchment and Lions River catchment indicated that modelling at the level of hydrological response units (HRU’s), using area weighted soils information and more than one driver rainfall station where possible, produced the most realistic results when comparing observed and simulated streamflows. Design flood estimates from simulated flows compared reasonably well with design flood estimates obtained from observed data only for QC59 and QCU20B. / Thesis (M.Sc.)-University of KwaZulu-Natal, Pietermaritzburg, 2010.
|
154 |
Local ecological knowledge of flooding in the Madison Valley neighborhood of Seattle, WashingtonMcGarry, Shawna. January 2007 (has links) (PDF)
Thesis (M.E.S.)--The Evergreen State College, 2007. / Title from title screen (viewed 1/23/2008). "A thesis: essay of distinction submitted in partial fulfillment of the Master of Environmental Studies, The Evergreen State College, June 2007." Includes bibliographical references (leaves 66-70).
|
155 |
Systém přírodě blízkých protierozních a protipovodňových opatření a jejich optimalizace v procesu pozemkových úprav. / System near natural erosion and flood control measures and optimization of the process of land consolidation.BLÁHA, Vladimír January 2013 (has links)
The thesis is focused on the system erosion and the flood control measures in the cadastral territory of Smetanova Lhota. For the calculation of the erosion threat was used universal soil loss equation (USLE) and runoff characteristics are calculated using the runoff CN - curves. The proposal has the influence of several factors. It's rainfall, vegetation cover, soil characteristics, morphology and other. Several calculations were carried out using the program ERCN.
|
156 |
Využití dotačních titulů pro vybudování protipovodňových opatření v Jihočeském kraji / The use of subsidies for the construction of flood control measures in South Bohemia RegionVANČUROVÁ, Michaela January 2014 (has links)
The subject of this diploma thesis "The use of subsidies for the construction of flood control measures in South Bohemia Region" is analysis of the use of public budgets and funds of European Union for the construction of flood control protection in South Bohemia Region. The thesis is dedicated to the description of the biggest flood events in South Bohemia Region and to the analysis of current flood control protection. The thesis's core is the analysis of funding of flood control measures and comparison of flood affected areas with number of flood control measures.
|
157 |
Análise da eficiência de métodos de controle de Enchentes na atenuação de picos de cheias utilizando o modelo computacional SWMM Storm Water managemente model / Analysis of the efficiency of flood control methods for the attenuation of peak flow using the SWMM - Storm water management modelSILVA, Karla Alcione da 31 August 2007 (has links)
Made available in DSpace on 2014-07-29T15:01:53Z (GMT). No. of bitstreams: 1
Dissertacao Karla Alcione da Silva.pdf: 1636555 bytes, checksum: d36dd50302f1e6a5b506033da1f1abb0 (MD5)
Previous issue date: 2007-08-31 / This research presents an evaluation of the eficiency of four flood control measures applied to an
urban basin in the city of Goiânia, State of Goiás, Brazil. Goiânia shows frequent flooding
problems. The following factors have been identified as causes of the floodings: (1) significant
number of impervious areas (2) lack of green areas, (3) insuficient capacity of the pipe network
to convey the produced water volume. Small detention basins, infiltration trenches and the
increase of permeable areas (30-50%) within parcels have been evaluated as flood control
measures as well as the use of the Lago do Bosque dos Buritis as a detention basin. For this
purpose, the Stormwater Management Model SWMM has been applied for evaluating 11
hypothetic management measures in the water basin. The later control measures were evaluated
individually as combined. In determining the impervious area index of the studied area, field
visits have been carried out, which showed high imperviousness. (86.16%). A synthetic rainfall
time series, derived from the equation proposed by Costa e Brito (1999) with recurrence of 2
years, has been used in the simulations. Horton`s equation was applied to represent infiltration
with parameters presented in Moura (2005). The scenario which combines the use of infiltration
trenches and the increase of pervious areas to 50% has shown to be the best solution in reducing
peak flow with 43% eficiency. On the other hand, the scenario using detention basins presented
the smallest efficiency (3%). / O presente trabalho apresenta a avaliação da eficiência de quatro métodos de controle de
enchentes em uma bacia urbana localizada na cidade de Goiânia, que apresenta graves problemas
de inundação. Estes alagamentos devem-se a alguns fatores que foram levantados, tais como:
muitas áreas impermeabilizadas, poucas áreas verdes e rede com dimensões pequenas e
insuficientes para o escoamento de todo o volume produzido. Foram analisadas a implantação de
microservatórios de detenção, trincheira de infiltração, o aumento da área permeável no interior
do lotes (de 30% e 50%) e o uso dos lagos do Bosque dos Buritis como dispositivo de controle.
Para tanto, procederam-se simulações no modelo computacional SWMM Storm Water
Management Model em que foram avaliados 11 cenários hipotéticos na bacia, que consistiram
na aplicação dos dispositivos de forma individual e em conjunto. Para a determinação do índice
de impermeabilização da área estudada foi necessário realizar um levantamento em uma área
amostra, o qual demonstrou uma média de 86.16% de impermeabilização em cada lote. A
precipitação utilizada foi uma série sintética, determinada por meio da equação de chuva
desenvolvida por Costa e Brito (1999) com tempo de recorrência adotado de 2 anos. Para
representar a infiltração, optou-se por trabalhar com a equação de infiltração de Horton, segundo
os parâmetros de Moura (2005). O cenário simulado com a implantação de trincheira de
infiltração e o aumento da área permeável em 50% apresentou aproximadamente 43% de
eficiência na redução da vazão de pico, indicando que essa poderia ser a melhor solução para o
problema analisado, enquanto que o cenário com microreservatórios apresentou a menor
eficiência, aproximadamente 3%.
|
158 |
Análise da translação da onda de cheia efluente do reservatório da UHE Manso na bacia hidrográfica do rio Cuiabá, Mato Grosso / Flood routing analysis of Manso hydroelectric power plant effluent reservoir in Cuiabá river basin, Mato Grosso state, BrazilRafael Pedrollo de Paes 05 May 2011 (has links)
As inundações periódicas na bacia hidrográfica do rio Cuiabá levaram a população a buscar meios para controlar as ocorrências de inundação, o que estimulou a construção da UHE Manso, atualmente sob responsabilidade da empresa Eletrobrás Furnas, em importante afluente desse rio. A partir de então, muito se tem discutido sobre a segurança proporcionada pela contenção de cheias do Aproveitamento Múltiplo de Manso (APM Manso) nas comunidades a jusante, especialmente na região metropolitana do Vale do Rio Cuiabá. O presente trabalho se propõe a avaliar a influência do reservatório de Manso na atenuação das cheias na bacia do Cuiabá. Foram analisados cenários hidráulicos a fim de comparar o impacto dos eventos extremos que ocorreram antes e após a operação da usina nas hipóteses da existência e inexistência do reservatório, e de cheias de projeto com diversos períodos de retorno na sub-bacia do rio Manso. O amortecimento hipotético do APM Manso foi simulado pelo método de Puls, e a translação da onda de cheia foi calculada pelo modelo hidrodinâmico CLiv. Em suma, foi constatado que o reservatório evitou uma cheia que atingiria grandes magnitudes em 2006. Quanto às inundações de maior prejuízo observadas anteriormente à construção da usina, duas delas seriam substancialmente atenuadas com a existência do reservatório; no entanto, uma terceira atingiria os níveis de alerta definidos pela Defesa Civil Estadual. Por fim, concluiu-se que, nas condições ideais de simulação, o APM Manso é capaz de reduzir a frequência das cheias consideradas de risco para as comunidades a jusante para períodos de retorno entre 50 e 100 anos. Apesar do amortecimento verificado, para que haja mitigação dos impactos de maneira racional, diversos outros cuidados devem ser tomados, em especial os relacionados ao planejamento para a ocupação apropriada das áreas de planície de inundação, a fim de que a segurança da população não dependa exclusivamente do reservatório. / The constant floods in Cuiabá river basin had led population to seek ways to control the overflow occurrences, encouraging the construction of Manso hydroelectric power plant, nowadays under responsibility of Eletrobras Furnas Company, in an important tributary of this river. Much has been discussed about the safety provided by the flood attenuation of Manso Multiple Use reservoir (MMU) in downstream communities, mainly in the metropolitan region of Cuiabá River Valley. In this context, this dissertation reports on the evaluation of the influence of Manso reservoir on the flood attenuation in Cuiabá basin. Hydraulic scenarios were analyzed in order to compare the impact of extreme events that occurred before and after hydroelectric power plant operation in the case of existence and non existence of the reservoir, and the impact of design flood with many return periods in Manso river sub-basin. The hypothetical flood-control of the MMU was simulated by level pool routing method, and the wave propagation was calculated by CLiv hydrodynamic model. It was verified that the reservoir avoided an inundation of great magnitudes in 2006. Regarding the major inundations that occurred before the hydroelectric power plant construction, two of them would have been substantially attenuated by the existence of the reservoir, and a third one would have reached the alert levels defined by the State Civil Defense. Finally, it was concluded that, under perfect simulated conditions, MMU is able to reduce the flood frequency considered risky to communities downstream in return periods between 50 and 100 years. Despite the verified flood-control, for the purpose of mitigating the impacts in wise manners, many other precautions must be taken, especially those related to planning for appropriate occupation in flood plain areas, so that population safety does not depend exclusively on the reservoir.
|
159 |
Služebnost rozlivu / Easement of areas designated for overflowing of floodsKubala, Martin January 2021 (has links)
Easement of areas designated for overflowing of floods - Abstract The aim of this thesis is to elaborate and subsequently provide an analysis of the current legal regulation of the easement of areas designated for overflowing of floods in Czech civil law. With regard to the historical development of easements as a superior concept of the easement of areas designated for overflowing of floods, as well as with regard to the regulation of a similar institute, which is the area designated for controlled flood overflowing under the Water Act. This thesis focuses on approaching the relatively young institute of the easement of areas designated for overflowing of floods in Czech civil law, clarifying its basic essence and its use in practice. The first chapter briefly outlines the basic characteristics of easements and their subdivision. The second chapter of the thesis briefly outlines the basic characteristics of the easement of areas designated for overflowing of floods. In the third chapter, this thesis focuses on the historical development of easements from Roman law until the Civil Code of 1964, focusing on the general historical development of easements in the absence of specific regulation of the easement of areas designated for overflowing of floods in this historical development. The greatest emphasis in...
|
160 |
Posouzení efektivity protipovodňové a protierozní ochrany malých povodí / Assessment of erosion and flood control measures effectiveness in small catchmentsFeltl, Jakub Unknown Date (has links)
Thesis is about assessment of erosion and flood control measures effectiveness, especially of broad base terraces. The main contribution is a new method of flood effect evaluation of these measures. This is solved by modern programs and geospatial technologies such as ArcMap and HEC - HMS. Economic assessment in alternative solutions of flood and erosion control effect is a main result which leads to optimal technical proposal. The proposed, relatively fast, method can be successfully applied in practice.
|