Spelling suggestions: "subject:"cousing policy.but africa."" "subject:"cousing policy.but affrica.""
51 |
An evaluation of the provision of houses in the Eastern Cape at Intsika Yethu local municipality: the case of Joe Slovo informal settlement at Chris Hani District Municipality (for the period 2009-2011)Mbotoloshi, Zukile January 2011 (has links)
The research seeks to evaluate the housing service rendering in the Intsika Yethu Local Municipality with special reference to the Joe Slovo informal settlement at Chris Hani District Municipality. The introduction provides the general overview of the study and provides a background to the intention of the research to evaluate the housing services provision in the municipality. The problem statements briefly describe the problem identified in the study and the objectives of the study are set. The theoretical framework is provided and the theories used to evaluate the housing service are discussed which are institutional theory and the system theory. The importance of conducting the research is discussed and the limitations of the study are discussed in the research. Importantly, the study plan directs the researcher in the direction towards the goals of the research. Also the terms used in this study that are not clear were defined to avoid misinterpretation; misunderstanding and confusion of words and terms. The review of the current literature on the theoretical framework and the nature and place of public administration was discussed. The policy process and the nature and place of policy making as well as steps in policymaking were discussed. The nature and place of policy implementation which includes all the functions was discussed in the study. The policy analysis and evaluation as the final step in the policy process including the stages in policy analysis and evaluation i.e. input phase; processing and conversion phase; output phase, impact/effect phase were discussed The legislative framework for rendering of housing services in South Africa was discussed as it influence and affects the housing service rendering in Intsika Yethu Local Municipality. The role of municipal authorities in the rendering of housing services was discussed. The permission to conduct research was received from Intsika Yethu local municipality on the 13 October 2009 from the Municipal Manager. The research design was explained together with research approaches and strategy as qualitative and quantitative. The research methodology with a clear population and sampling for the study as well as the data collection instruments and procedures as questionnaires; literature study and interviews were explained. The ethical considerations are discussed. The data analysis and interpretation was conducted to enable the researcher to identify patterns which are consistent within the data. The theory and techniques for data analysis was discussed to link the theory and data analysis. The demographics of chief officials and political office bearers as respondents include their age; year of service, home language, gender, the academic qualification as well as the different stakeholders were analysed. The housing as essential services in the initiation of policy which the input phase of the Systems theory analysis was conducted and the data on the nature of housing services as output phase were analysed and discussed. The data on the structural problems were analysed and discussed. Also the analysis was conducted on the legislative framework for housing x services. The problems with the rendering of housing services especially administrative enabling problems as a processing phase in the policy process were analysed and discussed. And lastly, the possible solutions to the solving of housing problems were discussed and analysed. The findings of the study were provided and discussed and the concluding remarks were provided to whether the problem is real and whether the hypothesis is true and valid. The recommendations of the study were provided to enable Intsika Yethu Local Municipality to improve the housing service provisioning and ultimately to provide better service delivery.
|
52 |
An evaluation of the impact of the provincial housing policy in the Nxuba MunicipalityDywili, Mhlobo Douglas January 2012 (has links)
The Eastern Cape Department of Housing has a constitutional and legislative mandate to provide houses to the poor and disadvantaged citizens living within the province. Parliament must also, according to the Constitution of the Republic of South Africa, 1996, as amended, take reasonable legislative and other measures within its available resources to achieve the progressive realisation of the right of citizens to have access to adequate housing (section 26 (1) and (2)). The commitment to improve the existing housing situation, namely the serious lack of adequate housing and basic services in urban townships and rural settlements, is thus in the first instance a policy matter and secondly a financial matter. However, despite the existing policy measures, such as the Housing Act, 1997 (Act 107 of 1997), the rendering of housing services resulted in uncompleted and defective houses due to inexperienced contractors providing poor workmanship and also corruption in the housing programmes. The rendering of housing services as a functional area has constitutionally been given to the national and provincial legislatures in South Africa. The Constitution allocated this function to the local sphere of government. Municipal authorities are the facilitators of sustainable housing services to (xiv) citizens on behalf of the national and provincial spheres of government. The study was thus conducted within the Nxuba local municipality which is one of eight local municipalities in the Amathole district municipality. The purpose of the study was to evaluate the implementation of the provincial housing policy and to determine the impact of the existing policy on the housing needs of the citizens of the Nxuba local municipality. For this purpose the fundamental and overall study problem was found to be that the rendering of housing services at the Nxuba local municipality is hampered by the implementation of an inadequate provincial housing policy and by incompetent municipal personnel and that these actions do not satisfy the growing demand for sustainable and suitable housing. The hypothesis was furthermore based on the fact that the existing provincial housing policy is inadequate to satisfy human needs and impacts negatively if not harmfully on human well-being. The study revealed that besides the implementation of an inadequate housing policy by incompetent municipal personnel, there are economic, social, political, physical and environmental effects on the citizens. As far as the environmental is concerned, the staging of protest marches resulting in the burning of tyres, rubbish cardboards and road barricades had caused serious air pollution which might lead to the spread of diseases such as TB, cancer and bronchitis when people inhale the poisonous gas evolving from smoke such as carbon monoxide (CO) and sulphur dioxide gases. Secondly, there is an economic impact on the citizens. Houses have been built away from town and people are compelled to commute between the town and their place of residence on a daily basis. With a continuous increase in the petrol price and its associated increase in transportation costs people pay large amounts to get to town. Furthermore the building of the RDP houses frequently comes to a standstill, builders, plumbers and carpenters lose their jobs. People’s income levels fall, impacting negatively on economic activity.
|
53 |
Have local authorities in Cape Town developed their owns set of indicators as part of assessing their progress in providing adequate shelter?Thomson, Tenille January 2003 (has links)
Includes bibliographical references (leaves 96-107).
|
54 |
Provision of housing and quality of life : the Geographic study of Extension 44 in the Polokwane MunicipalityNgoatle, Thabang January 2021 (has links)
Thesis (M.Sc. (Geographic Studies)) -- University of Limpopo, 2021 / The study focuses on Extension 44 in the Polokwane, an exclusively Black urban Township defined as a liveable geographical space consisting of both activity and awareness space (perpetual) space. Central to this research is its origins and existence as part of the urban racial spatial organization of Polokwane Municipality, viewed in terms of the Colonial, Apartheid and the traditional theoretical models depicting the internal structure of urban centres, including how it fits into the post-Apartheid urban planning policies, the provision of housing (types and quality), including the availability of physical and social infrastructure, how the residents perceive and evaluate these in relation to the residents’ quality of life in that area. The questions raised are (i) when and why was Extension 44 in the Polokwane municipality established? (ii) Who provides what type and quality of housing in the township? (iii) And lastly what perceptions do the residents have regarding housing and living conditions in Extension 44? Therefore, the study draws its significance as falling under both Settlement (Urban) and Behavioural geography. The former deals with origins and the nature of habitable space (settlements) while the latter is concerned, among others, with how people perceive their habitat.
|
55 |
Effects of the development and implementation of the national public housing policy in South Africa with specific reference to the Gauteng ProvincePhago, Kedibone Goodwill 06 1900 (has links)
The housing shortage in developing countries is one of the challenges of the 21st century. South Africa is no exception. This study has been undertaken to ensure that a bigger picture of this phenomenon can be understood. This study is also an attempt to understand whether governmental actions and interventions are near to addressing the challenges of homelessness for low-income households. In particular, the problem being investigated points to several issues which require extensive research towards possible proposals for future policy interventions. This means that the study takes interest in what the effects of the development and implementation of the national public housing policy in South Africa are. These effects need to be understood and identified for relevant conclusions and recommendations to be drawn. Further, the research problem has been broadened to understand the extent to which the effects of the Housing Act 107 of 1997 and the Gauteng Housing Act 6 of 1998 are conducive to addressing the public housing problems in the Gauteng Province.
The literature review undertaken in this study shows that for South Africa, and particularly the Gauteng Province, to be more successful in addressing public housing problems, different approaches and interventions are necessary. This is due to the fact that most successful countries (especially Western countries) have allowed community organisations themselves, not only the government, to become actively involved in the provision of public and low-income housing. Other findings of this study are, inter alia, poor administrative capacities, shortage of land for housing development, housing affordability problems, and lack of sound intergovernmental relations systems. The main recommendation, on the basis of the findings, is that a constitutional review and amendment recommending public housing policy implementation to be the preserve of municipalities should be considered. Several additional recommendations include, inter alia, proposed changes in the hierarchical structures and the adoption of business models that could minimise red tape to improve the turn-around period for beneficiaries in the process of public housing provision in the Gauteng Province.
|
56 |
Effects of the development and implementation of the national public housing policy in South Africa with specific reference to the Gauteng ProvincePhago, Kedibone Goodwill 06 1900 (has links)
The housing shortage in developing countries is one of the challenges of the 21st century. South Africa is no exception. This study has been undertaken to ensure that a bigger picture of this phenomenon can be understood. This study is also an attempt to understand whether governmental actions and interventions are near to addressing the challenges of homelessness for low-income households. In particular, the problem being investigated points to several issues which require extensive research towards possible proposals for future policy interventions. This means that the study takes interest in what the effects of the development and implementation of the national public housing policy in South Africa are. These effects need to be understood and identified for relevant conclusions and recommendations to be drawn. Further, the research problem has been broadened to understand the extent to which the effects of the Housing Act 107 of 1997 and the Gauteng Housing Act 6 of 1998 are conducive to addressing the public housing problems in the Gauteng Province.
The literature review undertaken in this study shows that for South Africa, and particularly the Gauteng Province, to be more successful in addressing public housing problems, different approaches and interventions are necessary. This is due to the fact that most successful countries (especially Western countries) have allowed community organisations themselves, not only the government, to become actively involved in the provision of public and low-income housing. Other findings of this study are, inter alia, poor administrative capacities, shortage of land for housing development, housing affordability problems, and lack of sound intergovernmental relations systems. The main recommendation, on the basis of the findings, is that a constitutional review and amendment recommending public housing policy implementation to be the preserve of municipalities should be considered. Several additional recommendations include, inter alia, proposed changes in the hierarchical structures and the adoption of business models that could minimise red tape to improve the turn-around period for beneficiaries in the process of public housing provision in the Gauteng Province.
|
57 |
Factors influencing the construction project success rates of Reconstruction Development Programme (RDP) housing projects in the Eastern Cape : a quality perspective : a census studyGabula, Zandisile Herbert 19 November 2012 (has links)
Submitted in fulfilment of the requirements of the Masters of Technology: Quality, Durban University of Technology, 2012. / There were several problems facing Reconstruction and Development
Programmes (RDP) housing projects caused by contractors using unskilled
labour, misuse of funds, fraudulent claims, contractors asking for additional
money or having left site. The overall scope of projects had no plan and no clear
definition, poor project management and there was a lack of strategies to
improve the quality of projects. This study recommends that it is imperative that
project team members involved in the management of RDP housing projects
have the necessary skills and level of education to execute their duties.
Moreover, the Department of Housing and Local Government (DHLG) should
draft a policy on Quality Management Systems (QMS)/good practices in respect
of its project scope of works so that all stakeholders conform to the set
standards. The people who are due to benefit from this housing are left in a
state of despair, confusion and loss of hope from Government promises, with a
subsequent increase in informal settlements.
The aim of the study was to investigate factors influencing the success rate of
RDP housing in the Eastern Cape. This case study employed a quantitative
approach to collect data. Questionnaires were analysed using descriptive and
inferential statistics, namely, correlation t-test and Anova. The purposive
sampling technique was used to select a sample size of 50 respondents from
the Department of Housing and Local Government (DHLG) in the Eastern Cape
Province. The advantage of this sampling technique is to reduce data to an
intelligible and interpretable form so that the relationship between research
problems can be studied and tested and conclusions drawn.
The DHLG could significantly improve the quality management of low-cost
homes if it adopts the Project Alignment Model. / National Research Foundation
|
58 |
An evaluation of selected housing strategies with special reference to KhayelitshaNkwenkwezi, Thandabantu Sydney 12 1900 (has links)
Thesis (MAdmin)--Stellenbosch University, 2000. / ENGLISH ABSTRACT: This thesis attempts to provide alternative solutions to housing and developmental
problems faced by the government in South Africa's urban/metropolitan areas in
general and in Khayelitsha in particular. The root causes of the problems have been
identified and linked to urbanisation-related government policies of the past. The
Group Areas "urban model of development" influenced the planning, management and
development (spatial policies) in the urban/metropolitan areas.
The rural-urban migration process through the migrant labour system during the
industrialisation period was engineered by the "Corporate State" and consolidated by
the introduction of tax systems and laws regulating land ownership by the African
people (Natives). These have impoverished the African people both in rural and
urban/metropolitan areas. The existing gap in development between rural and
urban/metropolitan areas, in particular in the peri-urban areas, is evident in persistent
poverty and unemployment as effects of the conditions which generate increased
migration.
In this context, Khayelitsha is used as a case study to illustrate study variables (urban
policies and management, rapid urbanisation and their impact on housing and
development) at grassroots level. Comparison is made undertaken between South
African housing and developmental problems and those of other developing countries.
Tanzania and Zimbabwe as African countries and former British Colonies (African
connection) have been chosen for this purpose. Data were gathered through
questionnaires, interviews and participatory observation. This makes the study
objective, but also subjective. The research concludes that there is a need to devote more resources to rural
development programmes accompanied by decentralisation strategies. This will help to
reduce the gap between rural and urban development. It is hoped that the information
contained in this thesis will provide a basic background to meet the social and economic
challenges by addressing housing and developmental problems, in Khayelitsha in
particular and South Africa in general. / AFRIKAANSE OPSOMMING: In hierdie tesis word daar gepoog om moontlike oplossings te vind vir die behuisings en
ontwikkelingsprobleme wat deur die Suid-Afrikaanse regering en
stedelike/metropolitaanse gebiede oor die algemeen en Khayelitsha in die besonder
ondervind word. Die kernoorsake van die probleme word geïdentifiseer en verbind aan
die vorige regering se verstedelikingsbeleide. Beplanning, bestuur en ontwikkeling
(ruimtelike beleide) in die stedelike/metropolitaanse gebiede is beïnvloed deur die
Groepsgebiede-model vir stedelike ontwikkeling.
Die landelike-stedelike migrasieproses, geïnisieer deur die trekarbeidstelsel gedurende
die industrialiseringsera, is deur die "Korporatiewe Staat" bewerkstellig en
gekonsolideer deur die instelling van belastingstelsels en wette ter regulering van
grondbesit deur swart mense. Dit het gelei tot die verarming van swart mense in
landelike en stedelike/metropolitaanse gebiede. Die bestaande gaping in ontwikkeling
tussen landelike en stedelike gebiede, in die besonder in buitestedelike gebiede, blyk
duidelik uit gevestigde armoede en werkloosheid as uitvloeisels van die omstandighede
wat tot toenemende migrasie lei.
In hierdie konteks is Khayelitsha gebruik as 'n gevallestudie om die studieveranderlikes
(stedelike beleide, stedelike bestuur, snelle verstedeliking en die impak daarvan op
behuising en ontwikkeling) op voetsoolvlak te illustreer. Vergelykings is getref ten
einde Suid-Afrikaanse behuisings- en ontwikkelingsprobleme met ander ontwikkelende
lande te vergelyk. Vir die doel is Tanzanië en Zimbabwe as Afrikalande en eertydse
Britse kolonies (Afrika-konneksie) gekies. Data is ingesamel deur middel van vraelyste, onderhoude en deelnemende waarneming. Dit het daartoe gelei dat die studie
nie alleen objektief nie, maar ook subjektief is.
Die studie kom tot die gevolgtrekking dat meer hulpbronne tesame met
desentraliseringstrategieë gerig op landelike ontwikkelingsprogramme benodig word.
Dit sal bydra tot vernouing van die gaping tussen landelike en stedelike ontwikkeling.
Daar word derhalwe gehoop dat die inligting vervat in hierdie tesis basiese agtergrond
sal verskaf om die sosiale en ekonomiese uitdagings die hoof te bied deur die bestaande
behuisings - en ontwikkelingsprobleme in Khayelitsha in die besonder en Suid-Afrika
oor die algemeen aan te spreek.
|
59 |
“Nothing about us, without us” : an assessment of public participation in the delivery of RDP houses in the Elias Motswaledi Local MunicipalityMphahlele, Elias 03 1900 (has links)
Thesis (MPA)--Stellenbosch University, 2013. / ENGLISH ABSTRACT: The pivotal role played by public participation in a social context is often undermined by change agents or administrators of government projects. The role of public participation is documented in Chapter 10 of the Constitution (South Africa, 1996). It states that “… people`s needs must be responded to, and the public must be encouraged to participate in policy making”.
Besides the Constitution (South Africa, 1996) there are also other legislative frameworks that enshrine the right to public participation. Some of these provisions are included in the White Paper on Local Government (South Africa, 1998c), the White Paper on Transforming Public Service Delivery (South Africa, 1997b), the Integrated Development Plans, and others. It has to be acknowledged that public participation is the fundamental element for the success of development projects geared towards the social upliftment of poor communities.
Poor communities, by omission or commission, are often excluded from direct participation in social projects. This study was prompted by the lack of effective public participation in the RDP housing project in the Elias Motswaledi Local Municipality, where the project was used as a case study. Qualitative research methods, well-founded theories and a literature study were used to inform the study. Forty-nine (49) respondents were interviewed.
By collecting and interpreting relevant data, the study was able to assess the extent of public participation that had taken place. The study then proceeded to make recommendations as to how the situation could have been handled and to formulate public participation model that would be context relevant to the area. Unfortunately, the Elias Motswaledi Local Municipality housing project is now a thing of the past and cannot be revisited. Fortunately, however, similar projects will be able to learn valuable lessons from this study in the future. Ultimately, the research illustrated that a strategy of comprehensive public participation that includes all project beneficiaries has to be well planned and well managed to promote and ensure the successful implementation of the project. / AFRIKAANSE OPSOMMING: Die rol wat deur publieke deelname gespeel moet word in die administrasie van regeringsprojekte word uit eengesit in Hoofstuk 10 van die Grondwet (Suid Afrika, 1996). Dit stipuleer da tdaar op mense se behoeftes gereageer moet word en dat die publiek aangemoedig moet word om deel te neem aan beleidsformulering.
Behalwe die Grondwet (Suid Afrika, 1996) is daar ook ander wetgewende raamwerke wat die reg op publieke deelname bevestig. Sommige van hierdie bepalings is ingesluit in die Witskrif op Plaaslike Regering (Suid Afrika, 1998c), die Witskrif op Transformasie van Openbare Dienslewering (Suid Afrika, 1997b), die Geїntegreerde Ontwikkelings planne, ensovoorts. Dit moet ook erken word dat publieke deelname die basis vorm vir die sukses van ontwikkelings projekte wat gerig is op die sosiale bemagtiging van ons gemeenskappe.
Openbare amptenare neem doelbewus nie altyd die belangrikheid van direkte deelname aan sosiale projekte in ag nie. Hierdie studie is juis aangespoor deur die afwesigheid van effektiewe publieke deelname in die HOP behuisings projekte in die Elias Motswaledi Munisipaliteit waar die Monsterlus HOP projek as `n gevalle studie gebruik is. Die studie maak gebruik van ‘n kwalitatiewe metode, gegronde teorie so wel as `n literatuur studie. Onderhoude is onderneem en nege-en-veertig (49) onderhoude is gevoer.
Nadat die data versamel en geїnterpreteer is, het die studie die omvang van publieke deelname wat plaasgevind het geassesseer. Aanbevelings is gemaak oor hoe die oewerhede die situasie beter kon hanteer het, en ‘n publieke deelname model is geformuleer wat relevant tot die area is.
Die nadeel is dat die Elias Motswaledi behuisings projek afgehandel is en uiteraard nie teruggedraai kan word nie. Die voordeel is egter dat toekomstige projekte deur die studie bevoordeel kan word. Die navorsing wys daarop dat publieke deelname strategieё wat alle rolspelers insluit, deeglik beplan en bestuur moet word, voor die aanvang van die projek sowel as gedurende die projek se implementering.
|
60 |
The Witsand Human Settlement Project : a participatory process to establish a sustainable human settlementMagida, Litha Lincoln 03 1900 (has links)
Thesis (MPhil)--Stellenbosch University, 2013. / ENGLISH ABSTRACT: South Africa is experiencing a number of challenges, which have led to developmental backlogs, housing shortages and growing informal areas. At the same time, the country is also experiencing sustainability problems, such as climate change, biodiversity loss and resource shortages. Strategies to address these challenges do not always provide adequate space for participatory structures as suggested by Local Agenda 21. Social sustainability (the ability of communities to collaborate in order to promote sustainability) is a fundamental component of sustainable development. An essential ingredient of social sustainability is to maintain and develop the stock of social capital (social bonds, relationships of trust, and connectedness in groups and networks). The existence of conflict and distrust in communities therefore makes cooperation for development and sustainability very difficult.
The purpose of this study was to examine and evaluate a specific case study, namely the Witsand Integrated Energy Environment Empowerment Cost Optimisation (iEEECO) Human Settlement Project, situated near Atlantis within the City of Cape Town, with regard to lessons about the process towards sustainable human settlements and sustainability. This case study was chosen because it is a so-called People’s Housing Project that has also been developed as an ecological sustainable project. The study specifically aimed to establish whether and how participation was implemented as part of this project and how effective this had been in promoting social sustainability, since it had also been a conflict-ridden project. The case study methodology was used where interviews, direct observation and focus groups sessions were conducted. Finally, the study reports on the findings and formulates recommendations based on the case study on some of the ways to improve sustainability. The process of learning about this community was like unpeeling an onion, that started with the impression of a successful sustainable human settlement, but ended up with the knowledge that it is a project, which despite more than usual efforts made to implement sustainability principles and participation, remains conflict ridden and fragmented. The community is presently represented by two community organisations (of which one does not support sustainability principles). It also seems as if few community members felt that they had really been involved in the participation process, with many relegated to make up numbers in meetings, with no real involvement in the process.
The level of illiteracy within the community is high and rumours abound, which at one stage led to houses of community leaders, as well as field workers employed by the municipality to monitor extension of shacks, being stoned and burnt. Municipal policies to use local people as gate-keepers to keep informal areas from growing are contributing to these problems. Changes in housing policies regarding contributory payments are also adding to conflict within the community, which adds fuel to rumours of corruption.
In the context of a shortage of space where people can legally build their own shacks, a shortage of public facilities like schools and clinics, as well as employment opportunities, this project cannot yet be regarded as an integrated sustainable human settlement.The lessons that this case study teaches us is about the path towards sustainability, is that it is a complex process, which requires a bigger focus on social sustainability and on conflict transformation. Social sustainability requires more and better participation and transparency in policy-making, as well as changes in policies to promote more fairness, justice, and the building of social capital. Co-production, where state and citizens work together to provide basic services, has much to offer as a method of participation, especially if initiated and run by grassroots organisations. / AFRIKAANSE OPSOMMING: Suid-Afrika beleef 'n aantal uitdagings, wat gelei het tot ontwikkelingsagterstande, behuisingstekorte en groeiende informele gebiede. Terselfdertyd ondervind die land ook volhoubaarheidsprobleme, soos klimaatverandering, die verlies aan biodiversiteit en hulpbron-tekorte. Strategieë om hierdie uitdagings aan te spreek, laat nie altyd voldoende ruimte vir deelnemende strukture soos voorgestel deur Plaaslike Agenda 21 nie. Sosiale volhoubaarheid (die vermoeë van gemeenskappe om saam te werk ten einde volhoubaarheid te bevorder) is 'n fundamentele komponent van volhoubare ontwikkeling. 'n Noodsaaklike bestanddeel van sosiale volhoubaarheid is om die voorraad van sosiale kapitaal (sosiale gom, verhoudings van vertroue, en verbondenheid in groepe en netwerke) in stand te hou en te ontwikkel. Die bestaan van konflik en wantroue in gemeenskappe maak dus samewerking vir ontwikkeling en volhoubaarheid baie moeilik.
Die doel van hierdie studie was om 'n spesifieke gevallestudie te ondersoek en te evalueer, naamlik die Witsand Geïntegreerde Energie en Omgewing Bemagtiging Koste Optimisering (iEEECO) Menslike Nedersetting Projek, naby Atlantis binne die Stad Kaapstad, met betrekking tot lesse oor die proses na volhoubare menslike nedersettings en volhoubaarheid. Hierdie gevallestudie is gekies omdat dit is 'n sogenaamde gemeenskapsbehuisingprojek (People's Housing Project) is, wat ook as 'n ekologiese volhoubare projek ontwikkel is. Die studie is spesifiek daarop gemik om vas te stel of en hoe deelname as deel van hierdie projek geïmplementeer is en hoe effektief dit was om sosiale volhoubaarheid te bevorder of nie, aangesien dit ook 'n konflik-geteisterde projek was. Die gevallestudie metodologie is gebruik, waar onderhoude, direkte waarneming en fokusgroep sessies onderneem is. Ten slotte doen die studie verslag oor die bevindings en formuleer aanbevelings oor hierdie gevalle studie ten opsigte van metodes hoe om deelname te verbeter om volhoubaarheid te bevorder.
Die proses van leer oor hierdie gemeenskap was soos om 'n ui af te skil, wat begin het met die indruk van 'n suksesvolle volhoubare menslike nedersetting, maar geëindig het met die wete dat dit 'n projek is, wat ten spyte van meer as die gewone pogings om volhoubaarheidsbeginsels en deelname te implementeer, deur konflik en fragmentasie gepla is. Dit word verteenwoordig deur twee gemeenskapsorganisasies (waarvan een nie volhoubaarheid beginsels ondersteun nie). Dit blyk ook asof min gemeenskapslede regtig voel dat hulle in die deelname proses betrokke was, met baie wat voel dat hulle gerelegeer was tot getalle by vergaderings, sonder regtige betrokkenheid in die proses
Die vlak van ongeletterdheid in die gemeenskap is hoog en gerugte doen die ronde, wat op een stadium gelei het tot die steniging en verbrand van huise van gemeenskap leiers, sowel as veldwerkers wat deur die munisipaliteit aangestel is om die uitbreiding van plakkershutte te monitor. Dit blyk dat die munisipale beleid om plaaslike mense te gebruik as poort-wagte om die groei van informele gebiede te keer, bydra tot hierdie probleme. Veranderinge in behuising beleid ten opsigte van bydraende betalings dra ook by tot konflik binne die gemeenskap, wat gerugte van korrupsie aanvuur.
In die konteks van 'n tekort aan ruimte waar mense wettiglik hul eie informele huise kan bou, 'n tekort aan openbare fasiliteite soos skole en klinieke, asook werksgeleenthede, kan hierdie projek nog nie beskou word as 'n geïntegreerde volhoubare menslike nedersetting nie. Die lesse wat hierdie gevallestudie ons kan leer oor die roete na volhoubaarheid, is dat dit 'n komplekse proses is, wat 'n groter fokus op sosiale volhoubaarheid en konflik transformasie vereis. Sosiale volhoubaarheid vereis meer en beter deelname en deursigtigheid in die maak van beleid, sowel as veranderinge in beleide om meer regverdigheid en geregtigheid te bevorder, asook die uitbou van sosiale kapitaal. Ko-produksie, waar staat en burgers saam werk om basiese dienste te lewer, het baie om te bied as 'n metode van deelname, veral as dit geïnisieer en gelei word deur voetsoolvlak organisasies.
|
Page generated in 0.0986 seconds