• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 8
  • 8
  • 5
  • 1
  • 1
  • Tagged with
  • 27
  • 27
  • 8
  • 5
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

A model driven methodology to measure the Level of Application of Management Process (LAMP) in manufacturing enterprise

Shamim, Khalid January 2013 (has links)
Increasingly Manufacturing Enterprises (MEs) need to perform competitively to survive in today s global markets. This thesis investigates the notion that competitive product realisation is not simply dependent on deploying state of the art operational and infrastructural support processes but also depends upon the adoption of management processes that ensure efficient and effective use of human and non human resources. Having an experience of more than two decades working in a public sector ME located in Pakistan the author has observed that improvements in timelines, quality and profit begins from measurement; followed by goal, problem & solution understanding, then planning and control of needed change. Therefore, a desire to enhance best practice qualitative and quantitative measurement of management processes triggered and focussed this research. Consequently the aim of this research has been to contribute to knowledge by using state of the art modelling techniques to structure and enable quantitative measurement of management processes within MEs. Subsequent research of the author has conceived, implemented and case tested a modelling methodology that is designed to measure the Level of Application of Management Process (LAMP) in pursuit of ME productivity improvement. In order to achieve the aim of this research, a semi generic model of management processes deployed in MEs was defined and explicitly modelled by using an ISO Enterprise Modelling technique. The definition of this semi-generic model was realised consequent upon (1) a literature review and (2) conducting semi-structured interviews with experts (n=42) in three public sector MEs located in Pakistan. Use of the Enterprise Modelling technique enabled decomposition and classification of management processes into so called Domain Processes, which subsequently were explicitly defined as Business Processes at a more detailed level of modelling abstraction. Then during subsequent research the author conceived and developed the use of a methodology to apply a LAMP scorecard the use of which was tested whilst conducting structured interviews with project managers (n=25) in three public sector MEs located in Pakistan that operate on project oriented management structures. The case study results partially validated the fitness for purpose of the model driven measurement methodology, identified opportunities for future methodological research and illustrated how LAMP identified and enabled measurements can help to define, quantify and direct potential opportunities for ME enhancement.
12

Implementation of six sigma at Company XYZ to eliminate finished good nonconformance

Poirier, Debra. January 2009 (has links) (PDF)
Thesis PlanB (M.S.)--University of Wisconsin--Stout, 2009. / Includes bibliographical references.
13

Just-in-time (JIT) concept : a case study of its implementation in a computer peripheral manufacturer in Hong Kong /

Chaw, Chi-chuen. January 1991 (has links)
Thesis (M.B.A.)--University of Hong Kong, 1991.
14

Exploring structures and processes of medicines management in elderly hospitalised patients in the United Arab Emirates

Al Shemeili, Saeed Khamis January 2015 (has links)
Given the complexity of medicines use in elderly patients, structures and processes of medicines management are key to deriving best outcomes. This research was conducted in hospitals in the United Arab Emirates (UAE) and focused on the patient journey from admission to discharge. The overall aim was to explore the structures and processes of medicines management in elderly hospitalised patients in the UAE, conducted in three phases. Phase 1. Following a review of systematic reviews of aspects of medicines management (e.g. reconciliation), this phase focused on a specific, emerging tool (the Drug Burden Index (DBI)) relating to anticholinergic/sedative agents, which are problematic in the elderly. The aim was to critically appraise, synthesize and present evidence of DBI use. The review protocol was registered with the Joanna Briggs Institute and conducted according to best accepted practice. The key finding was the lack of evidence of DBI use prospectively to identify potentially inappropriate prescribing. Phase 2. Phase 2 employed a qualitative phenomenological design to explore health professionals’ views and experiences of medicines management. Semi-structured interviews were conducted with 27 professionals and analysed using Normalization Process Theory (NPT) and the Theoretical Domains Framework (TDF). Findings revealed little evidence of coherence, cognitive participation, collective action and reflexive monitoring (NPT). TDF domains dominant were: professional role, identity; beliefs about capabilities; beliefs about consequences; environmental context, resources; and knowledge. Phase 3. The Delphi technique in phase 3 aimed to determine consensus around medicines management using an expert panel of policy makers, educators and lead health professionals. Phase 1 and 2 findings were used in construction of validated statements. A high level of consensus (≥70% strongly agree/agree) was obtained for statements other than those for targeting medicines management (rather than all elderly admissions) and tasks linked to professions (rather than trained staff). Overall, this research has generated original findings focused on the entire inpatient hospital journey, particularly the need to more clearly define, refine and agree on healthcare structures and processes across the entire patient journey from admission to discharge. The use of the NPT and TDF has highlighted those individual practitioners and organisational issues which require consideration.
15

Snižování nákladů s využitím procesní analýzy ve firmě PEGRES obuv s.r.o. / Cost reduction using process analysis in company PEGRES obuv s.r.o.

Gřeš, Jan January 2012 (has links)
Firma PEGRES obuv s.r.o. se již delší dobu potýká se stagnací v oblasti plánování a řízení výroby. Některé podnikové procesy jsou nyní značně zastaralé a v aktuálních podmínkách již neefektivní. Cíl práce je snížení nákladů s využitím procesní analýzy. Pro dosažení tohoto cíle bude provedena analýza současného stavu zastaralých procesů a budou popsány vybrané metody řízení výroby, které jsou svou povahou relevantní pro výrobu obuvi. Výstupem práce je sada doporučení a návrhů na změny v existujících procesech. Vybrané návrhy budou v prostředí firmy implementovány a práce zahrne zhodnocení výsledků po zavedení těchto změn.
16

Využití nástrojů projektového managementu pro zefektivnění firemních procesů / The Use of Project Management Tools for Improvement Processes of Company

Guštafík, Martin January 2016 (has links)
This thesis deals with streamlining business processes using project management tools at VOLET, Ltd. The company sells components and services in the field of garden ponds and irrigation systems. The first part describes the theoretical background, these are concepts based on project management. The analytical part describes the company and its current situation, then the individual analyzes. On the basis of these analyzes will be presented in the last part of the proposals on which to base the proposed project to streamline business processes.
17

Optimal portfolios with stochastic interest rates and defaultable assets /

Kraft, Holger. January 2004 (has links)
Univ., Diss.--Mainz, 2003. / Literaturverz. S. [165] - 170.
18

Proposta de um ambiente multiagente para a monitoração analítica de indicadores gerenciais e de apoio à decisão para uma empresa do setor elétrico / Proposal of a multiagent environment for the analytical monitoring of management and decision support indicators for an eletric utilitye

Reis, Vinícius Ataídes 01 March 2018 (has links)
Submitted by JÚLIO HEBER SILVA (julioheber@yahoo.com.br) on 2018-06-04T17:10:23Z No. of bitstreams: 2 Dissertação - Vinicius Ataides Reis - 2018.pdf: 3826829 bytes, checksum: 35e95213b298b470d75cdc0257b3b424 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) / Approved for entry into archive by Luciana Ferreira (lucgeral@gmail.com) on 2018-06-05T10:42:22Z (GMT) No. of bitstreams: 2 Dissertação - Vinicius Ataides Reis - 2018.pdf: 3826829 bytes, checksum: 35e95213b298b470d75cdc0257b3b424 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) / Made available in DSpace on 2018-06-05T10:42:22Z (GMT). No. of bitstreams: 2 Dissertação - Vinicius Ataides Reis - 2018.pdf: 3826829 bytes, checksum: 35e95213b298b470d75cdc0257b3b424 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Previous issue date: 2018-03-01 / Decision support and management indicator are fundamental inputs to make good planning and, for consequence, a good management of the operational processes in a company. Nowadays, the electrical sector companies in the Brazil have almost all the operational activities automated. However, the monitoring of all these activities is manual and requires a lot of time for manipulation and preparation by the managers of the information. This work proposes a solution based in a multiagent environment to create an analytical monitoring system. The solution aims to verify the performance of an organizational process from automatic analyzes of its indicators. The monitoring permits identify problems and apply corrective actions as soon as possible. To implement the proposed solution, this work proposes a customization of the management indicator system of the company. The paper shows the proposed multiagent architecture to execute the performance analyzes of the processes. Beside this, the paper shows the computational implementation as from evolutionary maintenances in the management indicator system. To show the effectiveness of the created solution, this paper presents some examples of how to create an analytical monitoring in it. Two case studies are carried out, detailing the construction of the solution and the monitoring process in the environment, allowing the reader to evaluate how much the proposed approach is efficient. The practical results obtained demonstrate the success of the work. Finally, work concludes that proposed approach reaches the project objectives. / Os indicadores de gestão e de suporte à decisão são insumos fundamentais para o bom planejamento e, consequentemente, para uma boa gestão dos processos de trabalho de uma organização. As empresas do setor elétrico no Brasil têm quase todas as suas atividades operacionais automatizadas. No entanto, o acompanhamento de grande parte dessas atividades é realizado de forma manual e demanda muito tempo de manipulação e preparação pelos gestores das informações. Este trabalho provê uma solução baseada em um ambiente multiagente para criar um sistema de monitoramento analítico. A solução visa verificar o desempenho de um processo organizacional a partir de análises automáticas de seus indicadores. O monitoramento permite identificar problemas, propiciando a oportunidade de aplicar ações corretivas o mais rápido possível. Para implementar a solução proposta, este trabalho propõe uma personalização do sistema de indicadores de gestão da empresa. O documento mostra a arquitetura multiagente proposta para executar as análises de desempenho dos processos. Além disso, mostra a implementação computacional a partir de manutenções evolutivas no sistema de indicadores de gerenciamento. Para mostrar a eficácia da solução criada, este trabalho apresenta exemplos de como criar um monitoramento analítico na solução criada. Dois estudos de caso são realizados, detalhando a construção da solução e o monitoramento das mesmas no ambiente, permitindo ao leitor avaliar o quanto a abordagem proposta é eficiente. Os resultados práticos obtidos demonstram o sucesso do trabalho. Finalmente, o trabalho conclui que a abordagem proposta atende aos objetivos do projeto.
19

Struktura logistických procesů ve výrobním podniku / The logistic processes structure in a manufacturing company

KOUTNÝ, Stanislav January 2015 (has links)
The dissertation deals with parameters of logistic processes structure in a manufacturing company. The logistic processes structure in a manufacturing company means the logistic processes and their relationships in a manufacturing company. The main objective of the thesis is to create an overview of parameters of the logistic processes structure in manufacturing companies. Cognition and formation of the logistic processes structure is important for planning, control and management of elements of the logistic chain. The thesis focuses on the logistic processes structure in a manufacturing company and the examination of their instantiations. To achieve the objective, in the thesis it was necessary to propose a unifying classification of logistic processes, as well as the general classification for the integration of logistic functions in the organization of a manufacturing company. The proposed classifications and proposed parameters allowed to compare the results of research concerning the comparison of different logistic processes (or operations) in companies.
20

Uplatnění principů procesního managementu v současné praxi podniků / Application of processing management principles in current practice of companies

KNOROVÁ, Petra January 2007 (has links)
The work deals with Process Management and its influence on efficiency and productivity of companies. By remodeling of processes, it is possible to ensure more fluent and easier production. An essential tool for labour analysis was Structured Process Analysis.

Page generated in 0.1093 seconds