• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 86
  • Tagged with
  • 86
  • 86
  • 43
  • 34
  • 34
  • 34
  • 34
  • 34
  • 34
  • 34
  • 32
  • 29
  • 27
  • 23
  • 20
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
81

Informe jurídico sobre la Sentencia de Casación No. 34303- 2019-Lima: REPEXSA vs. Osinergmin, controversia en torno al Aporte por Regulación al Osinergmin

Tovar Vera, Andrea 30 July 2024 (has links)
El presente trabajo tiene como objetivo analizar la argumentación plasmada en las sentencias emitidas por las diversas instancias administrativas y judiciales, con especial énfasis en la emtiida por la Corte Suprema, a la luz de los principios constitucionales y que nos encontramos adscritos a un marco de un Estado Constitucional de Derecho. La controversia del caso se centra en el análisis del Aporte por Regulación al Osinergmin, cobrado a las empresas importadoras y/o productoras de gas natural. Para ello se abordará un desarrollo histórico de las normas, una interpretación teleológica de las mismas, como también se propondra una resolución alternativa que hubiera sido deseable por parte de la Corte Suprema. / The present work aims to analyze the argumentation presented in the judgments issued by various administrative and judicial bodies, with particular emphasis on that issued by the Supreme Court, considering constitutional principles within the framework of a Constitutional State of Law. The case controversy revolves around the analysis of the Regulatory Contribution to Osinergmin, levied on importers and/or producers of natural gas. To this end, a historical development of the norms will be addressed, along with a teleological interpretation thereof, as well as a proposal for an alternative resolution that would have been desirable on the part of the Supreme Court.
82

Informe Jurídico sobre el Laudo Arbitral de fecha 1 de diciembre de 2015 recaído en el Caso Arbitral N° 2728- 2013-CCL

Castillo Santillana, Nicol Brigith 31 July 2024 (has links)
El presente trabajo versa sobre las consecuencias de la entrega tardía de terrenos a favor del Contratista en el marco de la Obra Pública para el Mejoramiento de la Av. Néstor Gambetta en el Callao y cómo dicha situación puede causar la ruptura del equilibrio económico financiero del Contrato (EEC). El referido escenario, comúnmente recurrente en la contratación pública, fue el caso del Gobierno Regional del Callao y el Consorcio Nueva Gambetta, razón por la cual este último acudió a la vía arbitral para reclamar las distintas ampliaciones de plazo negadas por la Entidad, costos directos y mayores gastos generales variables. Ante ello, el Tribunal Arbitral mediante Laudo recaído en el Caso Arbitral N° 2728-2013-CCL resolvió a favor de las pretensiones planteadas por el Contratista, a excepción de los Costos Directos, sobre los cuales realizó descuentos. Sobre la base de lo anterior, se analizará qué tipo de obligación constituye la entrega de terrenos que permita asumir una postura sobre dichos reclamos y determinar si efectivamente, el Contratista sufrió una ruptura de la ecuación financiera del Contrato que no se reestableció en la vía arbitral. Se verificarán también las condiciones que deben concurrir en el EEC. Finalmente, se brindarán unas breves conclusiones a los problemas jurídicos planteados. / This paper deals with the consequences of the late delivery of land in favor of the contractor in the framework of the public works for the improvement of Néstor Gambetta Avenue in Callao, and how such a situation can cause the breach of the economic and financial equilibrium of the contract (EEC). The aforementioned scenario, common in public contracts, was the case of the Regional Government of Callao and the Nueva Gambetta Consortium, which is why the latter resorted to arbitration to claim the various extensions of time, direct costs and higher variable overheads denied by the entity. Against this background, the Arbitral Tribunal, by means of the Award in Arbitration Case No. 2728-2013-CCL, ruled in favor of the claims raised by the Contractor, with the exception of the direct costs, to which it applied discounts. Based on the above, it will be analyzed what kind of obligation constitutes the delivery of land that allows to take a position on such claims and to determine whether the Contractor has indeed suffered a breach of the financial equilibrium of the contract that has not been restored in the arbitration proceedings. The conditions to be met in the EEC are also examined.
83

Incumplimiento del deber de cooperación al cumplimiento por parte del acreedor como causal de resolución del contrato

Casaverde Cotos, Fiorella Vanessa 27 February 2020 (has links)
La presente investigación se ubica en el ámbito del derecho de obligaciones y contratos, específicamente en la figura de resolución extrajudicial por incumplimiento de obligaciones y en el análisis de la naturaleza jurídica del deber de cooperación al cumplimiento como su sustento. Dentro del concepto tradicional de obligación, se tiene que existen dos situaciones jurídicas bien definidas, la primera es el derecho de crédito que es propio del acreedor y la segunda el deber de débito a cargo del deudor. La definición tradicional de obligación incide directamente en la teoría del cumplimiento de las obligaciones y por ende en los remedios que se proporcionan a las partes ante el incumplimiento. Partiendo de dicha premisa, la falta de cooperación por parte del acreedor o cooperación en sentido técnico, es actualmente entendida como una carga y por tanto, otorga al deudor los remedios de mora del acreedor y el pago en consignación, remedios que atenúan las consecuencias de la falta de cooperación del acreedor al cumplimiento pero no liberan al deudor de la relación jurídico contractual en todos los casos, lo que le ocasiona un grave perjuicio al mantenerle vinculado a una relación contractual que no puede ejecutar. No obstante lo señalado, sostenemos que la cooperación al cumplimiento es un deber que se encuentra dentro de la relación obligatoria como estructura compleja, este deber se ubica dentro del derecho de crédito, porque es exigible al titular de la situación activa de la relación obligatoria, en atención a los deberes que impone la cláusula normativa general de buena fe contemplada en el artículo 1362 del Código Civil Peruano, considerando ello, en el desarrollo de esta investigación probamos que sí es posible que el deudor resuelva un contrato sustentado en el incumplimiento del deber de cooperación para el cumplimiento, siendo la vía idónea la resolución extrajudicial a través de la intimación.
84

Análisis crítico del anatocismo en el derecho civil chileno

Sánchez Maggio, Fabrizio Manuel January 2016 (has links)
Memoria (licenciado en ciencias jurídicas y sociales)
85

Algunos problemas de la resolución por incumplimiento en la contratación contemporánea

González Lagos, Felipe, Novani Correa, Stephano January 2016 (has links)
Memoria (licenciado en ciencias jurídicas y sociales) / Una corriente importante de autores nacionales ─que denominamos Nuevo Derecho de los Contratos chileno─ influenciados por el Derecho Uniforme y lo que se ha denominado Modernización del Derecho de las Obligaciones de España, ha evidenciado una serie de problemas en la resolución por incumplimiento. El Nuevo Derecho de los Contratos chileno propone una reinterpretación de la institución, tomando como punto de partida el concepto del “interés del acreedor”. A través del presente trabajo se analizará la propuesta del Nuevo Derecho de los Contratos, la que parece ser interesante en el contexto del Derecho Uniforme. Se estudiarán los regímenes jurídicos de la resolución por incumplimiento y sus problemas, entre los que se encuentra el concepto de incumplimiento, los requisitos de la acción, la exceptio non adimpleti contractus en relación a la resolución por incumplimiento, la facultad de enervar la acción resolutoria pagando la deuda y nuevas instituciones ofrecidas por el Derecho Uniforme.
86

Estado actual de los remedios contractuales frente al incumplimiento de obligaciones de hacer y no hacer

Petersen Jaramillo, Karen Natalia January 2017 (has links)
Memoria (licenciado en ciencias jurídicas y sociales)

Page generated in 0.0931 seconds