1

Métodos heurísticos aplicados ao problema de programação da frota de navios PLVs. / Heuristics methods applied in a PLV fleet scheduling problem.

Queiroz, Maciel Manoel de 03 October 2011 (has links)
O presente trabalho abordou um problema de programação de embarcações que realizam o lançamento de dutos ou linhas de produção e a interligação destes à infra-estrutura submarina, em uma operação de exploração de petróleo offshore. As tarefas são realizadas por embarcações PLVs (pipe layer vessels), e possuem como atributos: duração, em dias; lista de embarcações compatíveis; instante de liberação; penalidade relacionada ao atraso na execução da tarefa. Este problema é uma variação da classe de problemas de programação de máquinas paralelas não-relacionadas, em que o objetivo é minimizar o atraso ponderado total. Este trabalho empregou como métodos de solução a meta-heurística GRASP com path relinking. Esta técnica foi implementada utilizando os recursos de processamento multi-threading, de forma a explorar múltiplas trajetórias simultaneamente. Testes foram feitos para comprovar o desempenho das heurísticas propostas, comparando-as com limitantes fornecidos pelo método geração de colunas. / This work addressed a fleet scheduling problem present in the offshore oil industry. Among the special purpose services one will find the pipe layer activities and its connection to the subsea infrastructure, accomplished by the Pipe Layer Vessels (PLV). The jobs are characterized by a release date, which reflects the expected arrival date of the necessary material at the port. There are compatibility constraints between job and vessel, so that some vessels may not be able to perform a certain job; the duration of the jobs can be differentiated by vessel and if a job is finished after its due date, a penalty is incurred. This is a variation of the unrelated parallel machine problem with total weighted tardiness objective function. This research employed a metaheuristic GRASP with Path Relinking, which have proved to be competitive and an effective solution strategy. This method was implemented in a multi-threading scheme allowing multiple paths to be explored simultaneously. Computational experiments were conducted, comparing solutions with bounds provided by linear column generation.
2

Métodos heurísticos aplicados ao problema de programação da frota de navios PLVs. / Heuristics methods applied in a PLV fleet scheduling problem.

Maciel Manoel de Queiroz 03 October 2011 (has links)
O presente trabalho abordou um problema de programação de embarcações que realizam o lançamento de dutos ou linhas de produção e a interligação destes à infra-estrutura submarina, em uma operação de exploração de petróleo offshore. As tarefas são realizadas por embarcações PLVs (pipe layer vessels), e possuem como atributos: duração, em dias; lista de embarcações compatíveis; instante de liberação; penalidade relacionada ao atraso na execução da tarefa. Este problema é uma variação da classe de problemas de programação de máquinas paralelas não-relacionadas, em que o objetivo é minimizar o atraso ponderado total. Este trabalho empregou como métodos de solução a meta-heurística GRASP com path relinking. Esta técnica foi implementada utilizando os recursos de processamento multi-threading, de forma a explorar múltiplas trajetórias simultaneamente. Testes foram feitos para comprovar o desempenho das heurísticas propostas, comparando-as com limitantes fornecidos pelo método geração de colunas. / This work addressed a fleet scheduling problem present in the offshore oil industry. Among the special purpose services one will find the pipe layer activities and its connection to the subsea infrastructure, accomplished by the Pipe Layer Vessels (PLV). The jobs are characterized by a release date, which reflects the expected arrival date of the necessary material at the port. There are compatibility constraints between job and vessel, so that some vessels may not be able to perform a certain job; the duration of the jobs can be differentiated by vessel and if a job is finished after its due date, a penalty is incurred. This is a variation of the unrelated parallel machine problem with total weighted tardiness objective function. This research employed a metaheuristic GRASP with Path Relinking, which have proved to be competitive and an effective solution strategy. This method was implemented in a multi-threading scheme allowing multiple paths to be explored simultaneously. Computational experiments were conducted, comparing solutions with bounds provided by linear column generation.
3

Programação de frota de embarcações de lançamento de dutos. / Fleet scheduling of pipe layer vessels.

Moura, Victor Cavinato 18 May 2012 (has links)
A presente pesquisa considera o problema de programação de uma frota de embarcações de lançamentos de dutos, conhecidas como Pipe Layer Support Vessel (PLSVs), as quais fazem parte da frota de apoio marítimo de uma operação offshore. As embarcações do tipo PLSVs são responsáveis pelas tarefas de lançamento de dutos submarinos, que escoam a produção dos poços de petróleo, e pela interligação destes dutos à infraestrutura submarina. A programação da frota deve atender uma demanda de serviço conhecida, em um horizonte de médio prazo, respeitando restrições operacionais, visando minimizar o atraso ponderado total das tarefas ou evitar que existam atrasos. Foi desenvolvido um método para estimar o valor da solução ótima do problema, baseado na técnica de relaxação Lagrangiana, e um conjunto de heurísticas para gerar soluções viáveis para o problema. / This research considers the problem of scheduling a fleet of specialized vessels used for launching pipes and connecting them to the subsea infrastructure, in an offshore oil production environment. The Pipe Layer Support Vessels (PLSV) must be scheduled such that the demand is fully attended within the planning horizon, observing other operational constraints, with the purpose of minimizing the total weighted tardiness. The solution method is based on constructive and local search heuristics. Bounds on the optimal solution were derived by a Lagrangean relaxation algorithm.
4

Programação de frota de embarcações de lançamento de dutos. / Fleet scheduling of pipe layer vessels.

Victor Cavinato Moura 18 May 2012 (has links)
A presente pesquisa considera o problema de programação de uma frota de embarcações de lançamentos de dutos, conhecidas como Pipe Layer Support Vessel (PLSVs), as quais fazem parte da frota de apoio marítimo de uma operação offshore. As embarcações do tipo PLSVs são responsáveis pelas tarefas de lançamento de dutos submarinos, que escoam a produção dos poços de petróleo, e pela interligação destes dutos à infraestrutura submarina. A programação da frota deve atender uma demanda de serviço conhecida, em um horizonte de médio prazo, respeitando restrições operacionais, visando minimizar o atraso ponderado total das tarefas ou evitar que existam atrasos. Foi desenvolvido um método para estimar o valor da solução ótima do problema, baseado na técnica de relaxação Lagrangiana, e um conjunto de heurísticas para gerar soluções viáveis para o problema. / This research considers the problem of scheduling a fleet of specialized vessels used for launching pipes and connecting them to the subsea infrastructure, in an offshore oil production environment. The Pipe Layer Support Vessels (PLSV) must be scheduled such that the demand is fully attended within the planning horizon, observing other operational constraints, with the purpose of minimizing the total weighted tardiness. The solution method is based on constructive and local search heuristics. Bounds on the optimal solution were derived by a Lagrangean relaxation algorithm.