• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 51
  • 38
  • 26
  • 10
  • 5
  • 2
  • 2
  • 2
  • 2
  • 1
  • Tagged with
  • 143
  • 93
  • 83
  • 34
  • 30
  • 27
  • 26
  • 23
  • 22
  • 21
  • 20
  • 18
  • 16
  • 16
  • 16
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
41

Dirección de proyecto con aplicación de la Guía del PMBOK®, en un proyecto de construcción de puente

Serpa Chávez, Rocky Gustavo, Tineo Ramos, Carlos Antonio 01 October 2015 (has links)
El principal problema encontrado en la actualidad a nivel nacional en el rubro de construcción, es la carencia en la aplicación de una metodología que guíe de manera correcta a los directores de proyecto para hacer una buena gestión. Para atender esta necesidad se recurrió al desarrollo de un modelo práctico de gestión de proyecto adaptado al tipo de contrato con el estado peruano, ayudado de la Guía del PMBOK. Este modelo, materia de la presente tesis, servirá para guiarse de una experiencia real del desarrollo de un proyecto de construcción, desde su fase inicial de evaluación del caso de negocio hasta la fase de cierre de proyecto. Para la presente tesis se definió elegir un proyecto real denominado “Construcción del Puente Yanamonte Km 115” de longitud 20m, ubicado en la Provincia de La Mar del departamento de Ayacucho. El puente es financiado por el estado peruano a través de Provias Nacional del Ministerio de Transportes y Comunicaciones MTC. La guía del PMBOK – Quinta Edición 2013 al ser una guía de buenas prácticas con procesos estandarizados, brinda pautas permitiendo su aplicación a cualquier tipo de proyecto favoreciendo a las organizaciones en cuanto al desarrollo de una mejor gestión de proyectos. En principio la tesis explicará todo lo relacionado al caso de negocio en la fase inicial de evaluación del proyecto. Se estudiará la estructura organizacional actual de la empresa, se analizará los indicadores económicos financieros del entorno del mercado donde se desarrolla la oportunidad del negocio, se evaluará las alternativas estratégicas, se diagnosticará las ventajas competitivas, se diseñará una estrategia para el logro de los objetivos, concluyéndose con la aprobación de la viabilidad del proyecto que resulte rentable para decidir apostar. En el desarrollo del plan para la dirección del proyecto, aplicado a la Construcción del Puente Yanamonte Km 115, se recurrirá a la Guía del PMBOK – Quinta Edición 2013, a fin de utilizar todas las herramientas y técnicas adecuadas, y recomendadas para la elaboración de los documentos de salida de cada proceso. Se aplicará los 47 procesos en las diferentes 10 áreas de conocimiento, en todas las etapas desde: inicio, planificación, ejecución, seguimiento y control, y cierre del proyecto. Los principales entregables en esta fase son las líneas bases de costo, tiempo y alcance. En conclusión, el presente trabajo podrá ser utilizado por Directores de Proyecto, como una modelo guía, desarrollado y basado en las buenas prácticas de la Guía del PMBOK en sus proyectos futuros. / Tesis
42

Aplicación de la dirección de proyectos en el desarrollo de la ingeniería de detalle para la construcción de la carretera SMCV – estación de transferencia La Joya, según las buenas prácticas del PMI

Luna Laura, Abimael, Vicente Ortiz, Carlos, Rivera Medina, José Luis, Valdivia Reguerini, Evans Vladislav 19 September 2019 (has links)
En el presente trabajo, empleamos las buenas prácticas de dirección de proyectos que nos servirán como base para desarrollar futuros proyectos que nuestra organización requiera. Cabe mencionar que se ha innovado la práctica del trabajo de la empresa, aplicando los grupos de procesos de Inicio y Planificación de la Guía de los Fundamentos para la Dirección de Proyectos - sexta edición (PMBOK® guide, sixth edition), de acuerdo con la experiencia de la empresa para poder alcanzar los objetivos de la organización. Por lo tanto la dirección del proyecto de Desarrollo de la Ingeniería de Detalle para la Construcción de la Carretera SMCV – Estación de Transferencia La Joya, se analiza bajo dos enfoques: el primero muestra como CISA realiza la dirección de proyectos en la actualidad y el segundo muestra la situación ideal aplicando las buenas prácticas de la Guía de los Fundamentos para la Dirección de Proyectos - sexta edición (PMBOK® guide, sixth edition). / In this present research work, we use the best practices of project management that will serve as a basis for developing future projects that our organization requires. These best practices have innovated the way to run projects in our company, applying the start-up and planning process groups of the Fundamentals Guide for Project Management - sixth edition (PMBOK® guide, sixth edition), according to the experience of the company to achieve the goals of the organization. Therefore, the direction of the detailed engineering development project for the construction of the SMCV road - La Joya transfer station, is analyzed under two approaches: the first shows how CISA currently manages projects and the second shows the ideal situation by applying the good practices of the Guide to the Fundamentals for Project Management - sixth edition (PMBOK® guide, sixth edition). / Tesis
43

Plan para la dirección del Proyecto para implementación de una cadena de librerías, basado en los estándares globales de la guía del PMBOK®

Cóndor Castillo, Juan Harry, Ricapa Solís, Jonathan Frank, Santander Cárdenas, Martha Alicia, Sotelo Quispe, Alan 05 February 2020 (has links)
El presente trabajo de investigación es un plan para la dirección del proyecto de implementación de una cadena de librerías, que será llevado a cabo por una editorial de libros para la etapa escolar. El desarrollo se basa en la Guía de los Fundamentos para la Dirección de Proyectos (PMBOK®) (Project Management Institute [PMI®] 2017), y en el modelo de Schmidt (2003) para el caso de negocio. El trabajo de investigación está distribuido de la siguiente manera, inicia con un marco teórico, presentación de la organización, la situación actual del rubro de la edición en el país, los grupos de interés, problemática de la organización, caso de negocio donde se emplearon como indicadores de rentabilidad financiera la tasa interna de retorno (TIR) y el valor actual neto (VAN), también se analizaron los beneficios (Netos e intangibles); desarrollo del plan para la dirección del proyecto, y culmina con conclusiones siendo la principal que el proyecto es económicamente viable y a su vez aporta valor a la organización, una de las recomendaciones resaltantes es considerar al caso de negocio como el documento base para desarrollar el proyecto. El proyecto cuenta con un presupuesto de S/ 400.000 y un plazo de seis meses de ciclo de vida. El caso de negocio determina que el proyecto es viable; de demostrarse que este cumple con los beneficios de la organización en el Perú servirá de base para que el resto de las sedes de la editorial puedan implementar una cadena de librerías debido a que el trabajo de investigación se convertirá en un activo de los procesos de la organización. / The present research work is a project management plan of implementation of bookstore chain, which will be carried out by a book publishing house for the school stage. The development is based on a Guide to the Project Management Body of Knowledge (PMBOK®) (Project Management Institute [PMI®] 2017) and the Schmidt model (2003) for the business case. The research work is distributed as follows, begins with a theoretical framework, the presentation of the organization, the current situation of the issue in the country, interest groups, organizational problems, the business case where they were used as indicators of financial profitability. The internal rate of return (IRR) and the current net value (NPV), the benefits (net and intangible) were also analyzed; development of the project management plan, and culminates with conclusions being the main one that the project is economically viable and, in turn, brings value to the organization, one of the pending recommendations is to consider the business case as the base document for develop the project The project has a budget of S / 400,000 and a period of six months of life cycle. The business case determines that the project is viable; If it is shown that this meets the benefits of the organization in Peru, it will serve as the basis for the rest of the headquarters of the publishing house to implement a chain of libraries because the research work will become an asset of the organization processes. / Trabajo de investigación
44

Application of PMBOK to improve the deadline of projects in SMEs engineering consultancies

Hinostroza, Maricielo, Chavez, Pedro, Nuñez, Victor, Raymundo, Carlos 01 January 2019 (has links)
El texto completo de este trabajo no está disponible en el Repositorio Académico UPC por restricciones de la casa editorial donde ha sido publicado. / In recent years, project management in consulting firms has grown due to greater demands for goods and services. However, this growth has meant that due to inefficiencies in the management, delays in project delivery times are generated. In addition, the same situation occurs for performance of personnel’s competences, as well as in defining the scope of the project. Therefore, this article proposes a model for the application of Project Management Body of Knowledge (PMBOK) based on knowledge management, which consists of the following areas: stakeholder management, risk management, cost management, time management, human resources management, quality management, integration management, and scope management. To show the ease of use of this model, a case study was conducted in an engineering consulting firm. The results of the application of the model were successful: the delay in project delivery times was reduced by 70% and the risks that may exist during execution were reduced by 67%. In addition, the company highlighted the success of the application of knowledge management because it improved the interaction and skills of staff by facilitating the implementation of the model.
45

Zavedení agilního přístupu projektového managementu ve vybrané firmě / Implementation of Agile Project Management Approach in Selected Company

Bartovičová, Slavomíra January 2014 (has links)
The diploma thesis deals with implementation of Agile Project Management Approach for smaller software projects of the department ATS of the office HTS CZ of the corporation Honeywell. The ATS department is a part of the Aerospace division, focused at aviation. For implementation of new approach there was used the agile methodology Scrum and the project management standard PMBoK.
46

Aplicación de los lineamientos del PMBOK en la gestión de proyecto Centro Comercial Sur Sector Cuatro, San Juan de Miraflores – Lima

Angulo Félix, Roberto Raúl, Ludeña Martínez, Melisa Marlene January 2015 (has links)
El estudio, de tipo correlacional, se realizó al proyecto Centro Comercial Sur Sector Cuatro, de la empresa JE Construcciones SA; ubicada en la ciudad de Lima y parte de aplicar los lineamientos de la guía del PMBOK en la gestión del tiempo, costo y calidad; analizando y evaluando, la problemática generada en la obra durante la etapa de ejecución del periodo 15-03-15 al 15-05-15, hito importante en el proyecto. El análisis parte de dos escenarios: “Primer escenario”, representa el avance real en obra y “Segundo escenario”, representa el avance con el cronograma propuesto, calculándose el valor ganado del primer escenario que fue de S./115,342,840.09 y del segundo escenario que fue de S./153,008,434.03; que refleja la ejecución de obra sin retrasos y pérdidas económicas respecto al tiempo. La gestión de los costos, analiza las valorizaciones quincenales en la curva S para ambos escenarios, obteniéndose los indicadores que determinan el desempeño global de la obra. Para el primer escenario, la estimación a la conclusión (EAC) es S/. 216, 393,289.13 respecto al costo directo (BAC). La gestión de la calidad, implicó la aplicación del diagrama de Ishikawa y el diagrama de Pareto, evaluándose el impacto en el tiempo por los reprocesos del periodo en estudio, denotando una duración total de 76 días y el costo de S. / 86,067.90 que representa el 1.11% del periodo en estudio, conllevando a proponer el plan de calidad, protocolos para mejorar la calidad en los procesos. The study, of type correlational, was realized to the project “Centro Comercial Sur” sector four, of the company JE Constructions SA; located in the city of Lima and part of applying the alignments of guide of the PMBOK in the management of the time, cost and quality; analyzing and evaluating, the problematics generated in the work during the stage of execution of the period 15-03-15 to 15-05-15, important event in the project. The analysis departs from two scenarios: "The First scene", represents the real advance in work and "The Second scene", represents the advance with the proposed chronogram, there being calculated the earned value of the first scene that was S./115,342,840.09 and the second scene that was S./153,008,434.03; that reflects the execution of work without delays and economic losses with regard to the time. The management costs, analyzes the fortnightly valuations in the S curve for both scenarios, obtaining the indicators that determine the overall performance of the work. For the first scenario, the estimate at completion (EAC) is S /. 216, 393,289.13 regarding the direct cost (BAC). The quality management, involved the application of Ishikawa diagram and Pareto chart, evaluating the impact in time to rework the study period, implying a total duration of 76 days and the cost of S / 86,067.90 representing 1.11% of the study period, leading to propose the quality plan, protocols to improve process quality.
47

A gest?o ambiental nas ?reas de conhecimento e ciclo de vida em projetos como proposta para o PMBOK: uma revis?o

Freitas, Vit?ria Irma Gon?alves Lopes de Faria 25 July 2017 (has links)
Submitted by Raniere Barreto (raniere.barros@ufvjm.edu.br) on 2018-05-09T19:35:42Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) vitoria_irma_gon?alves_lopes_farias_freitas.pdf: 3591111 bytes, checksum: e72c7b4b4c2c3ecec4f40e7cebef61df (MD5) / Approved for entry into archive by Rodrigo Martins Cruz (rodrigo.cruz@ufvjm.edu.br) on 2018-05-14T14:33:56Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) vitoria_irma_gon?alves_lopes_farias_freitas.pdf: 3591111 bytes, checksum: e72c7b4b4c2c3ecec4f40e7cebef61df (MD5) / Made available in DSpace on 2018-05-14T14:33:56Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) vitoria_irma_gon?alves_lopes_farias_freitas.pdf: 3591111 bytes, checksum: e72c7b4b4c2c3ecec4f40e7cebef61df (MD5) Previous issue date: 2017 / Essa pesquisa tem como objetivo formular uma proposta de ?rea de conhecimento norteadora de gerenciamento ambiental para projetos. Discute a Gest?o Ambiental e o sistema de gest?o e aborda sobre os aspectos legais na Gest?o Ambiental, refletindo sobre a legisla??o brasileira que a norteia. ? descrito a metodologia aplicada pelo Guia PMBOK, e as funcionalidades das dez ?reas do conhecimento hoje explicitadas no Guia, a saber: integra??o, escopo, tempo, custos, qualidade, recursos humanos, comunica??es, riscos, aquisi??es e partes interessadas. Utiliza a pesquisa explorat?ria e bibliogr?fica para dar suporte a proposta desenvolvida. Na expectativa de formular a ?rea de conhecimento em Gest?o Ambiental, opta-se por descrever essa ?rea em forma de diagrama de fluxos de dados do processo em fun??o do ciclo de vida do projeto. Conclui-se que: existe uma necessidade de identifica??o de ferramentas e t?cnicas espec?ficas para a Gest?o Ambiental em projeto; necessidade de opini?es especializadas e conhecimento dos ?rg?os reguladores, tais como: engenheiros ambientais e Conselho Nacional do Meio Ambiente (CONAMA); necessidade do licenciamento ambiental e de suas modalidades, quando for o caso, bem como do acompanhamento da validade da mesma; ? imprescind?vel a cria??o de um plano de gerenciamento ambiental do projeto, que esteja de acordo com os v?rios outros planos j? existentes em projetos. / Disserta??o (Mestrado Profissional) ? Programa de P?s-Gradua??o em Tecnologia, Sa?de e Sociedade, Universidade Federal dos Vales do Jequitinhonha e Mucuri, 2017. / This research aims to formulate a proposal of knowledge area guiding environmental management for projects. It discusses environmental management and the management system and discusses the legal aspects in environmental management, reflecting on the Brazilian legislation that guides it. It describes the methodology applied by the PMBOK Guide, and the functionalities of the ten areas of knowledge that are explained in the Guide, namely: integration, scope, time, costs, quality, human resources, communications, risks, acquisitions and stakeholders. It uses the exploratory and bibliographic research to support the developed proposal. In the expectation of formulating the area of knowledge in environmental management, it is chosen to describe this area as a diagram of data flows of the process in function of the life cycle of the project. It is concluded that: there is a need to identify specific tools and techniques for environmental management in design; Need for specialized opinions and knowledge of regulators, such as: environmental engineers and the National Environmental Council (CONAMA); The need for environmental licensing and its modalities, when applicable, as well as the monitoring of the validity of the same; It is imperative to create an environmental project management plan that is in line with the various other existing project plans.
48

Apoio mútuo, coletivismo e autogerstão no processo de gerenciamento de projetos em organizações de software e serviços de tecnologia da informação

FERNANDES, Carla Patricia Pereira Goncalves 15 February 2016 (has links)
Submitted by Fabio Sobreira Campos da Costa (fabio.sobreira@ufpe.br) on 2017-03-28T12:58:59Z No. of bitstreams: 2 license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5) Carla Patrícia Pereira Gonçalves Fernandes_Dissertação_050820162301.pdf: 1508954 bytes, checksum: 9136bb28456e805922c2017ddd6b54f3 (MD5) / Made available in DSpace on 2017-03-28T12:58:59Z (GMT). No. of bitstreams: 2 license_rdf: 1232 bytes, checksum: 66e71c371cc565284e70f40736c94386 (MD5) Carla Patrícia Pereira Gonçalves Fernandes_Dissertação_050820162301.pdf: 1508954 bytes, checksum: 9136bb28456e805922c2017ddd6b54f3 (MD5) Previous issue date: 2016-02-15 / Percebeu-se através da literatura a necessidade e carência de estudos sobre anarquia e gerenciamento de projetos. Esta dissertação de mestrado tem por objetivo investigar como os conceitos da anarquia - apoio mútuo, coletivismo e autogestão - relacionam-se com os processos de gerenciamento de projetos, baseados no Guia Project Management Body of Knowledge (PMBOK), presentes no dia-a-dia dos profissionais da área de projetos. Portanto, foi conduzida uma revisão bibliográfica e um survey para atingir esse objetivo. A pesquisa inquiriu profissionais atuantes na área de gestão de projetos, em organizações de software e serviços de tecnologia da informação. Para tanto, o estudo foi desenvolvido de forma exploratória, dado que existia pouco conhecimento acumulado e sistematizado a respeito deste tema. A análise dos dados recolhidos na pesquisa conclui que tanto a pesquisa bibliográfica quanto o survey confirmam que há uma relação positiva significativa entre a anarquia e os processos de gerenciamento de projetos estudados. Almeja-se que o presente estudo possa servir de elemento prospectivo para outras pesquisas na área de gerenciamento de projetos, fomentando a realização de trabalhos e publicações científicas. Por fim, o trabalho propõe contribuir com a academia, gerando nova literatura com informações relacionadas ao tema. / It was realized through literature the need and the lack of studies on anarchy and project management. This master thesis aims to investigate how the concepts of anarchy - mutual support, collectivism and self-management - are related to the project management processes, based on Project Management Body of Knowledge (PMBOK), present in the day-to-day professional project. Thus, we conducted a literature review and a survey to achieve this goal. The survey asked professionals working in project management area, in software organizations and information technology services. Therefore, the study was developed in an exploratory way, since there was little accumulated and systematized knowledge about this topic. The analysis of the data collected in the survey concludes that both the literature and the survey confirm that there is a significant relationship between anarchy and the studied processes for project management. One hopes that this study can serve as a prospective element to further research in the project management area, fostering the realization of scientific works and publications. Finally, the work proposes to contribute to the area, creating new literature with information related to the topic.
49

Sistema de gestão em projetos com aplicação do guia PMBOK para processos intralogísticos em indústrias de grande porte : pesquisa exploratória

Marcelo Tadeu dos Santos 20 March 2009 (has links)
Este trabalho tem como finalidade desenvolver uma proposta de gestão de processos em projetos de serviços de intralogística, com base nas práticas de gerenciamento da metodologia do Project Management Institute (PMI), por meio do Guia PMBoK. Para tanto, desenvolveu-se um Plano de Gestão para Projetos Intralogísticos (PGPI), para integração de todas as áreas e processos dos projetos operacionais, de acordo com seus ciclos de vida, associado às características da prestação de serviço industrial. Trata-se de uma pesquisa exploratória, delimitada a empresas de grande porte. A metodologia aplicada à pesquisa foi quaseexperimental, devido ao seu caráter não-probabilístico; a coleta de dados foi feita por meio de entrevistas com executivos de seis indústrias, contratantes de serviços em logística; os entrevistados foram organizados em dois grupos, sendo três de empresas do segmento automobilístico em que o plano não havia sido aplicado, e três de empresas de segmentos diversos que tiveram sua aplicação. A partir do roteiro de entrevista, com base no sistema proposto, foram verificados os fatores relativos ao planejamento, implantação e execução das atividades de cada organização, bem como as possibilidades de aperfeiçoamentos e melhorias contínuas. Os resultados da pesquisa demonstraram a utilidade da aplicação de um processo sistêmico de gerenciamento de projeto voltado para o ambiente de serviços de logística industrial, permitindo o controle funcional e integração das atividades. / This study purpose the application of PMBok Guide as a structural tool in the management of intralogistic projects in great industries. A Plan of Management for Intralogistic Projects was developed (Plano de Gestão de Projetos Intralogísticos - PGPI), for integration of all the areas and processes of the operational projects, in accordance with its cycles of life, associate to the characteristics of the PLs. This is a investigative research, delimited by great companies. The methodology applied to the research was quasi-experimental, with not-probabilist character; the collection of data was made by interviews with executives of six great industries, contractors of services in logistic; the interviews had been organized in two group, being three were companies where the Plan had not been applied and three were companies where the Plan had been applied. From the interview script, it had been verified the relative factors to the planning, implantation and execution of the activities of each organization. The research results had demonstrated the utility of the process of management of project directed application toward the environment of services of logistic industrial, allowing the functional control and the integration of the activities.
50

Diagnóstico de pontos críticos e aplicação de metodologia de gerenciamento do tempo de projetos: um estudo de caso do Departamento de Estudos Clínicos de empresa de saúde animal / Diagnosis of critical points and application of project schedule management methodology: a case study of the Clinical Studies Department of animal health company

Gabrielle Nellis Bragaglia 16 February 2017 (has links)
O objetivo deste trabalho foi realizar diagnóstico para solução de problemas de atraso na entrega das atividades e relatórios de pesquisa, bem como de dificuldade de se definir o objetivo e escopo do projeto, encontrados no departamento de estudos pré-clínicos e clínicos de empresa de saúde animal. Isso porque, antes dos novos produtos veterinários entrarem no mercado, estes devem passar por testes que comprovem sua eficácia e segurança, conforme exigido pelo órgão regulatório. Neste contexto, verifica-se a importância da realização de estudos clínicos conforme planejamento e prazos previamente estabelecidos, pois estes impactam diretamente nos resultados e planejamento estratégico da empresa. Para tanto, foi realizado diagnóstico dos atrasos através de avaliação de cronogramas de projetos finalizados. Como proposta de solução foi elaborado um formulário de planejamento de projetos a partir dos conceitos do PMBOK®. Este foi aplicado no início de cada novo projeto e inserido no fluxograma de processos do departamento. Para avaliação dos resultados da inserção deste formulário foram aplicados aos colaboradores do departamento questionários fechados juntamente a cada preenchimento do formulário. Os dados obtidos destes questionários foram avaliados através da análise de componentes principais. Além disso, foi realizada entrevista semiestruturada com os colaboradores para verificar efetivamente a mudança no cenário do departamento pós-formulário, sendo os dados avaliados conforme método de análise de discurso. Como resultados foi verificado que ocorreram atrasos em pelo menos 50% das atividades presentes nos 22 cronogramas de projetos avaliados, isso devido principalmente ao planejamento inadequado, de acordo com os relatos dos colaboradores. Com a aplicação do formulário e análise dos dados dos questionários e das entrevistas foi possível verificar que a utilização do formulário tem grande importância na definição dos objetivos do projeto, definição de escopo, e consequente definição das atividades indicadas para cada estudo, ou seja, auxilia no planejamento do estudo. Além disso, proporciona aos colaboradores a reflexão e visão crítica dos projetos, assim como deixa documentado tudo aquilo que foi pensado evitando retrabalhos posteriores. / The objective of this study was to perform a diagnosis to solve problems of delay in activities and research reports\' delivery, as well as the difficulty to define project\'s objective and scope, found in the pre-clinical and clinical studies department of animal health company. This happens because new veterinary products must undergo tests that prove their efficacy and safety, as required by the regulatory agencies before being marketed. In this context, it is important to carry out clinical studies according to the planning and deadlines previously established, as these have a direct impact on the results and strategic planning of the company. For this purpose, the delays were diagnosed through the evaluation of completed project schedules. As a proposal for solution, a project planning form was developed based on PMBOK® concepts. This was applied at the beginning of each new project and inserted into the department\'s process flowchart. To evaluate insertions\' results of this form a closed questionnaire was applied to employees of the department with each filling out form. The data obtained from these questionnaires were analyzed through principal components analysis. In addition, a semi-structured interview was conducted with the employees to effectively verify the change in the post-form department scenario and the data were evaluated according to the discourse analysis method. As results it was verified that there were delays in at least 50% of the activities present in the 22 schedules of evaluated projects, mainly due to inadequate planning, according to the collaborators reports. With form\'s application and data\'s analysis of questionnaires and interviews it was possible to verify that the use of the form has great importance in the definition of project\'s objectives, definition of scope and consequent activities\' definition indicated for each study. In other words, it assists in the planning of the study. In addition, it provides the employees with the reflection and critical vision of projects, as well as documenting everything that was thought avoiding subsequent rework.

Page generated in 0.0924 seconds