Spelling suggestions: "subject:"1species"" "subject:"3species""
841 |
Evaluating recovery planning for threatened species in AustraliaAlejandro Ortega Argueta Unknown Date (has links)
Loss of biodiversity is a major environmental issue in Australia. In response the Commonwealth Government has developed a national list of threatened species and prepared recovery plans under the provisions of the Commonwealth Environmental Protection and Biodiversity Conservation Act 1999 (EPBCA). However, knowledge on the appropriateness and effectiveness of those conservation and management schemes is limited. The aim of the thesis was to conduct an evaluation of recovery planning to assess its appropriateness as a conservation and management instrument, and investigate how legislative, institutional and organisational factors influence its implementation. Four research questions were addressed: 1) How does recovery planning operate in regard to legislative, jurisdictional and institutional aspects? 2) Do recovery plans comply with legislative requirements and coherent conservation planning? 3) What management factors have most influence on implementation of recovery plans at state level? and 4) What modifications could be made to the management system to improve implementation of recovery plans? The major approaches considered in this study were policy evaluation and systems analysis. Both approaches were incorporated in a framework of the thesis to construct a conceptualisation of the threatened species management system as a model. This allowed examining its structure, key elements and dynamics, and evaluation of its performance and effectiveness. Methods comprised interviews, content analysis of program documentation, qualitative and quantitative analysis of recovery plans, experts’ workshops, and systems analysis and modelling. The major set of quantitative data came from a database which incorporated content attributes of 236 recovery plans. Taking into account the Australian legislative requirements for preparing recovery plans, key content attributes were selected for assessing the degree of compliance. Internal consistency of plans was also assessed as a complementary measure of coherent management planning. Measures of internal consistency were: consistency between gaps of scientific information versus prescribed actions calling for research; consistency between major threatening processes versus prescription of threat abatement actions; and consistency between recovery objectives versus performance criteria for measuring achievement of objectives. Another component of the thesis was the construction of a model of the management system of threatened species. This theoretical model was conceptualised from opinions of experts and stakeholders occupying key roles in threatened species management. The model incorporated social aspects of management such as institutional and organisational factors influencing planning and the implementation of recovery plans. The model was built using a Bayesian belief network to assess the most influential components (issues, recovery strategies, and management requirements) on the likely outcomes. Expert opinions also assisted to identify gaps in the management system and formulate new management strategies. Finally, modelling allowed assessing different management scenarios and identified the key components that would improve recovery planning. Major findings of the investigation revealed that: 1) Although the three levels of government in Australia (Commonwealth, state/territory and local) are involved in recovery planning, it is the states/territories that have the most active role in preparing and operating recovery plans. State and territory-based legislation, policy and conservation strategies shape the form in which recovery planning is performed nationwide, as they are responsible for implementing 89% of national plans; 2) Overall compliance of plans with legislative requirements was adequate; although improvement is required in establishing a monitoring and evaluation framework. Overall, internal consistency of plans was also adequate in addressing threats and formulating research for knowledge gaps; but consistency was poor regarding the response to some threatening processes and the establishment of recovery criteria; 3) According to experts/stakeholders, the most influential issues relevant to the implementation of recovery plans are: coordination across Commonwealth, state and territory agencies, inconsistency of strategies and programs across jurisdictions, addressing management of threatened species on private land, incorporation of science into recovery planning, prioritising schemes for conservation action, and funding for the implementation of plans; 4) The recovery planning strategy may be improved by establishing mandatory monitoring and review reports; creating a national forum on threatened species; designing an appropriate insurance regime for volunteers; and establishing a national management information system.
|
842 |
Evaluating recovery planning for threatened species in AustraliaAlejandro Ortega Argueta Unknown Date (has links)
Loss of biodiversity is a major environmental issue in Australia. In response the Commonwealth Government has developed a national list of threatened species and prepared recovery plans under the provisions of the Commonwealth Environmental Protection and Biodiversity Conservation Act 1999 (EPBCA). However, knowledge on the appropriateness and effectiveness of those conservation and management schemes is limited. The aim of the thesis was to conduct an evaluation of recovery planning to assess its appropriateness as a conservation and management instrument, and investigate how legislative, institutional and organisational factors influence its implementation. Four research questions were addressed: 1) How does recovery planning operate in regard to legislative, jurisdictional and institutional aspects? 2) Do recovery plans comply with legislative requirements and coherent conservation planning? 3) What management factors have most influence on implementation of recovery plans at state level? and 4) What modifications could be made to the management system to improve implementation of recovery plans? The major approaches considered in this study were policy evaluation and systems analysis. Both approaches were incorporated in a framework of the thesis to construct a conceptualisation of the threatened species management system as a model. This allowed examining its structure, key elements and dynamics, and evaluation of its performance and effectiveness. Methods comprised interviews, content analysis of program documentation, qualitative and quantitative analysis of recovery plans, experts’ workshops, and systems analysis and modelling. The major set of quantitative data came from a database which incorporated content attributes of 236 recovery plans. Taking into account the Australian legislative requirements for preparing recovery plans, key content attributes were selected for assessing the degree of compliance. Internal consistency of plans was also assessed as a complementary measure of coherent management planning. Measures of internal consistency were: consistency between gaps of scientific information versus prescribed actions calling for research; consistency between major threatening processes versus prescription of threat abatement actions; and consistency between recovery objectives versus performance criteria for measuring achievement of objectives. Another component of the thesis was the construction of a model of the management system of threatened species. This theoretical model was conceptualised from opinions of experts and stakeholders occupying key roles in threatened species management. The model incorporated social aspects of management such as institutional and organisational factors influencing planning and the implementation of recovery plans. The model was built using a Bayesian belief network to assess the most influential components (issues, recovery strategies, and management requirements) on the likely outcomes. Expert opinions also assisted to identify gaps in the management system and formulate new management strategies. Finally, modelling allowed assessing different management scenarios and identified the key components that would improve recovery planning. Major findings of the investigation revealed that: 1) Although the three levels of government in Australia (Commonwealth, state/territory and local) are involved in recovery planning, it is the states/territories that have the most active role in preparing and operating recovery plans. State and territory-based legislation, policy and conservation strategies shape the form in which recovery planning is performed nationwide, as they are responsible for implementing 89% of national plans; 2) Overall compliance of plans with legislative requirements was adequate; although improvement is required in establishing a monitoring and evaluation framework. Overall, internal consistency of plans was also adequate in addressing threats and formulating research for knowledge gaps; but consistency was poor regarding the response to some threatening processes and the establishment of recovery criteria; 3) According to experts/stakeholders, the most influential issues relevant to the implementation of recovery plans are: coordination across Commonwealth, state and territory agencies, inconsistency of strategies and programs across jurisdictions, addressing management of threatened species on private land, incorporation of science into recovery planning, prioritising schemes for conservation action, and funding for the implementation of plans; 4) The recovery planning strategy may be improved by establishing mandatory monitoring and review reports; creating a national forum on threatened species; designing an appropriate insurance regime for volunteers; and establishing a national management information system.
|
843 |
Fruit Fly Pests of Northwestern AustraliaCameron, Emilie C January 2007 (has links)
Doctor of Philosophy(PhD), / Until recently, Northwestern Australia was thought to be relatively free of serious fruit fly pests. Although a noxious strain, present in Darwin since 1985, was widely believed to be an infestation of the Queensland fruit fly, Bactrocera tryoni, from the East coast, the fruit flies present outside this area were believed to be the benign endemic species, B. aquilonis. However, during the year 2000, infestations of fruit flies were discovered on major commercial crops in both Western Australia and the Northern Territory. It was not known whether these outbreaks were due to an invasion of the major pest species, Bactrocera tryoni, a change in the behaviour of B. aquilonis, or a hybridisation event between the two species. Finding the source of these outbreaks has been complicated by the fact that, since B. tryoni and B. aquilonis are virtually indistinguishable morphologically, it was not known which species are present in the region. Traditionally any tryoni complex fly caught in the Northwest was called B. aquilonis based solely on location. In order to get a good population profile of the region, an extensive trapping program was set up to include flies from urban areas, commercial crops and natural areas where the benign strain is thought to remain. Tests of genetic differentiation and clustering analyses revealed a high degree of homogeneity in the Northwest samples, suggesting that just one species is present in the region. The Northwest samples were genetically differentiated from the Queensland samples but only to a small degree (FST =0.0153). MtDNA sequencing results also showed a small degree of differentiation between these regions. A morphological study of wing shape indicated that there are some minor identifiable morphological differences between East coast and Northwest laboratory reared flies. This difference was greater than that seen between B. jarvisi populations across the same geographic range. The results suggest that the flies caught in the Northwest are a separate population of B. tryoni. Soon after pest flies were discovered in Darwin, a population became established in Alice Springs. This population had a low genetic diversity compared with Queensland and Darwin populations, and showed evidence of being heavily founded. In 2000, an outbreak was discovered in the nearby town of Ti Tree. Due to the geographic and genetic similarity of these populations, Alice Springs was determined to be the source of the Ti Tree outbreak. To investigate the founding of these populations, a program was developed to estimate the propagule size. Using a simulation method seven different statistics were tested for estimating the propagule size of an outbreak population. For outbreaks originating from populations with high genetic diversity, the number of alleles was a good estimator of propagule size. When, however, the genetic diversity of the source population was already reduced, allele frequency measures, particularly the likelihood of obtaining the outbreak population from the source population, gave more accurate estimates. Applying this information to the Alice Springs samples, it was estimated that just five flies were needed to found the major population in and around Alice Springs. For Ti Tree, the propagule size was estimated to be 27 flies (minimum 10). In 2000, a much larger outbreak occurred in the developing horticultural region of Kununurra in northern Western Australia. An important question for the management of the problem is whether there is an established fly population or the flies are reinvading each year. This population was found to have a large amount of gene flow from the Northern Territory. Within the Kununurra samples, one group of flies was genetically differentiated from all the other samples. This group came from a small geographic area on the periphery of Kununurra and appeared to be the result of an invasion into this area at the time when the population was building up following the dry season. A further threat to the Northwest horticultural regions comes from B. jarvisi. A recent increase in the host range of this species has lead to speculation that it may become a greater pest in Northwestern Australia. At the present time, protocols for the population monitoring and disinfestation of this species are not in place. Here it is shown that B. jarvisi eggs are more heat tolerant than B. tryoni eggs and that monitoring of B. jarvisi populations is possible using cue lure traps placed according to fruiting time and location of their favoured host, Planchonia careya.
|
844 |
Evaluating recovery planning for threatened species in AustraliaAlejandro Ortega Argueta Unknown Date (has links)
Loss of biodiversity is a major environmental issue in Australia. In response the Commonwealth Government has developed a national list of threatened species and prepared recovery plans under the provisions of the Commonwealth Environmental Protection and Biodiversity Conservation Act 1999 (EPBCA). However, knowledge on the appropriateness and effectiveness of those conservation and management schemes is limited. The aim of the thesis was to conduct an evaluation of recovery planning to assess its appropriateness as a conservation and management instrument, and investigate how legislative, institutional and organisational factors influence its implementation. Four research questions were addressed: 1) How does recovery planning operate in regard to legislative, jurisdictional and institutional aspects? 2) Do recovery plans comply with legislative requirements and coherent conservation planning? 3) What management factors have most influence on implementation of recovery plans at state level? and 4) What modifications could be made to the management system to improve implementation of recovery plans? The major approaches considered in this study were policy evaluation and systems analysis. Both approaches were incorporated in a framework of the thesis to construct a conceptualisation of the threatened species management system as a model. This allowed examining its structure, key elements and dynamics, and evaluation of its performance and effectiveness. Methods comprised interviews, content analysis of program documentation, qualitative and quantitative analysis of recovery plans, experts’ workshops, and systems analysis and modelling. The major set of quantitative data came from a database which incorporated content attributes of 236 recovery plans. Taking into account the Australian legislative requirements for preparing recovery plans, key content attributes were selected for assessing the degree of compliance. Internal consistency of plans was also assessed as a complementary measure of coherent management planning. Measures of internal consistency were: consistency between gaps of scientific information versus prescribed actions calling for research; consistency between major threatening processes versus prescription of threat abatement actions; and consistency between recovery objectives versus performance criteria for measuring achievement of objectives. Another component of the thesis was the construction of a model of the management system of threatened species. This theoretical model was conceptualised from opinions of experts and stakeholders occupying key roles in threatened species management. The model incorporated social aspects of management such as institutional and organisational factors influencing planning and the implementation of recovery plans. The model was built using a Bayesian belief network to assess the most influential components (issues, recovery strategies, and management requirements) on the likely outcomes. Expert opinions also assisted to identify gaps in the management system and formulate new management strategies. Finally, modelling allowed assessing different management scenarios and identified the key components that would improve recovery planning. Major findings of the investigation revealed that: 1) Although the three levels of government in Australia (Commonwealth, state/territory and local) are involved in recovery planning, it is the states/territories that have the most active role in preparing and operating recovery plans. State and territory-based legislation, policy and conservation strategies shape the form in which recovery planning is performed nationwide, as they are responsible for implementing 89% of national plans; 2) Overall compliance of plans with legislative requirements was adequate; although improvement is required in establishing a monitoring and evaluation framework. Overall, internal consistency of plans was also adequate in addressing threats and formulating research for knowledge gaps; but consistency was poor regarding the response to some threatening processes and the establishment of recovery criteria; 3) According to experts/stakeholders, the most influential issues relevant to the implementation of recovery plans are: coordination across Commonwealth, state and territory agencies, inconsistency of strategies and programs across jurisdictions, addressing management of threatened species on private land, incorporation of science into recovery planning, prioritising schemes for conservation action, and funding for the implementation of plans; 4) The recovery planning strategy may be improved by establishing mandatory monitoring and review reports; creating a national forum on threatened species; designing an appropriate insurance regime for volunteers; and establishing a national management information system.
|
845 |
Evaluating recovery planning for threatened species in AustraliaAlejandro Ortega Argueta Unknown Date (has links)
Loss of biodiversity is a major environmental issue in Australia. In response the Commonwealth Government has developed a national list of threatened species and prepared recovery plans under the provisions of the Commonwealth Environmental Protection and Biodiversity Conservation Act 1999 (EPBCA). However, knowledge on the appropriateness and effectiveness of those conservation and management schemes is limited. The aim of the thesis was to conduct an evaluation of recovery planning to assess its appropriateness as a conservation and management instrument, and investigate how legislative, institutional and organisational factors influence its implementation. Four research questions were addressed: 1) How does recovery planning operate in regard to legislative, jurisdictional and institutional aspects? 2) Do recovery plans comply with legislative requirements and coherent conservation planning? 3) What management factors have most influence on implementation of recovery plans at state level? and 4) What modifications could be made to the management system to improve implementation of recovery plans? The major approaches considered in this study were policy evaluation and systems analysis. Both approaches were incorporated in a framework of the thesis to construct a conceptualisation of the threatened species management system as a model. This allowed examining its structure, key elements and dynamics, and evaluation of its performance and effectiveness. Methods comprised interviews, content analysis of program documentation, qualitative and quantitative analysis of recovery plans, experts’ workshops, and systems analysis and modelling. The major set of quantitative data came from a database which incorporated content attributes of 236 recovery plans. Taking into account the Australian legislative requirements for preparing recovery plans, key content attributes were selected for assessing the degree of compliance. Internal consistency of plans was also assessed as a complementary measure of coherent management planning. Measures of internal consistency were: consistency between gaps of scientific information versus prescribed actions calling for research; consistency between major threatening processes versus prescription of threat abatement actions; and consistency between recovery objectives versus performance criteria for measuring achievement of objectives. Another component of the thesis was the construction of a model of the management system of threatened species. This theoretical model was conceptualised from opinions of experts and stakeholders occupying key roles in threatened species management. The model incorporated social aspects of management such as institutional and organisational factors influencing planning and the implementation of recovery plans. The model was built using a Bayesian belief network to assess the most influential components (issues, recovery strategies, and management requirements) on the likely outcomes. Expert opinions also assisted to identify gaps in the management system and formulate new management strategies. Finally, modelling allowed assessing different management scenarios and identified the key components that would improve recovery planning. Major findings of the investigation revealed that: 1) Although the three levels of government in Australia (Commonwealth, state/territory and local) are involved in recovery planning, it is the states/territories that have the most active role in preparing and operating recovery plans. State and territory-based legislation, policy and conservation strategies shape the form in which recovery planning is performed nationwide, as they are responsible for implementing 89% of national plans; 2) Overall compliance of plans with legislative requirements was adequate; although improvement is required in establishing a monitoring and evaluation framework. Overall, internal consistency of plans was also adequate in addressing threats and formulating research for knowledge gaps; but consistency was poor regarding the response to some threatening processes and the establishment of recovery criteria; 3) According to experts/stakeholders, the most influential issues relevant to the implementation of recovery plans are: coordination across Commonwealth, state and territory agencies, inconsistency of strategies and programs across jurisdictions, addressing management of threatened species on private land, incorporation of science into recovery planning, prioritising schemes for conservation action, and funding for the implementation of plans; 4) The recovery planning strategy may be improved by establishing mandatory monitoring and review reports; creating a national forum on threatened species; designing an appropriate insurance regime for volunteers; and establishing a national management information system.
|
846 |
Habitat requirements and habitat use of the red-crowned toadlet Pseudophryne Australis and the giant burrowing frog Heleioporus Australiacus in the Sydney basin.Stauber, Andrew G. January 2006 (has links)
Habitat requirements and habitat use for Pseudophryne australis and Heleioporus australiacus were investigated to aid management of these threatened frogs around Sydney, Australia. Much of the work focussed on roads, commonly encountered features in the habitat of both species. The habitat requirements based on locality records of both frogs in the Sydney Basin were investigated at four spatial scales. Both species are habitat specialists. They showed a strong geological association with Hawkesbury Sandstone and occupy upper topographic areas with ephemeral watercourses of gentle gradients. Both frogs occur predominantly in areas of higher precipitation and milder temperature regimes compared to averages representative of the region. Leaf litter is an important feature of P. australis breeding sites, whereas H australiacus generally associate with crayfish burrows. Both species are dependent on natural vegetation with a complex structure. H australiacus have a relatively long larval period (3 - 12 months) and breed in ephemeral pools, exposing their tadpoles to the risk of dying due to early pond drying. In the laboratory, tadpoles responded to decreasing water levels by shortening their larval periods and metamorphosing earlier than siblings held at constant water level. Despite this plastic response, a number of pools in the field failed to produce metamorphs due to early drying, an observation also made on P. australis. Regular monitoring of breeding sites revealed increased reproductive success away from roads for both species probably because of relatively longer hydroperiods. Spatial distributions and associations with habitat features, and movement patterns of both frogs were further investigated using mark-recapture methods. Both species showed strong site fidelity. P. australis formed small aggregations and predominantly selected leaf litter piles despite their relatively low availability. Leaf litter piles in creeks moved over time and the animals moved with these piles. In contrast, H australiacus individuals formed no aggregations and showed no preference for any available structural vegetation type. Locations of individuals were independent of relative distances to creeks and artificial drains, but males appeared to be more common near culverts. However, individuals were randomly distributed in space and nearest-neighbour distances were high relative to individual movement distances, suggesting minimal overlap between relatively large home ranges. Radio-telemetry demonstrated that some H australiacus individuals burrow in the road environment. There they would be at risk of being dug up and possibly injured during road works. The results are discussed in relation to the spatial requirements of both species and the protection of utilised habitat features. Management options are suggested to mitigate the impacts of road works. Differences in spatial dynamics of both frogs with overlapping habitats highlighted in this study require species-specific management approaches.
|
847 |
Evaluating recovery planning for threatened species in AustraliaAlejandro Ortega Argueta Unknown Date (has links)
Loss of biodiversity is a major environmental issue in Australia. In response the Commonwealth Government has developed a national list of threatened species and prepared recovery plans under the provisions of the Commonwealth Environmental Protection and Biodiversity Conservation Act 1999 (EPBCA). However, knowledge on the appropriateness and effectiveness of those conservation and management schemes is limited. The aim of the thesis was to conduct an evaluation of recovery planning to assess its appropriateness as a conservation and management instrument, and investigate how legislative, institutional and organisational factors influence its implementation. Four research questions were addressed: 1) How does recovery planning operate in regard to legislative, jurisdictional and institutional aspects? 2) Do recovery plans comply with legislative requirements and coherent conservation planning? 3) What management factors have most influence on implementation of recovery plans at state level? and 4) What modifications could be made to the management system to improve implementation of recovery plans? The major approaches considered in this study were policy evaluation and systems analysis. Both approaches were incorporated in a framework of the thesis to construct a conceptualisation of the threatened species management system as a model. This allowed examining its structure, key elements and dynamics, and evaluation of its performance and effectiveness. Methods comprised interviews, content analysis of program documentation, qualitative and quantitative analysis of recovery plans, experts’ workshops, and systems analysis and modelling. The major set of quantitative data came from a database which incorporated content attributes of 236 recovery plans. Taking into account the Australian legislative requirements for preparing recovery plans, key content attributes were selected for assessing the degree of compliance. Internal consistency of plans was also assessed as a complementary measure of coherent management planning. Measures of internal consistency were: consistency between gaps of scientific information versus prescribed actions calling for research; consistency between major threatening processes versus prescription of threat abatement actions; and consistency between recovery objectives versus performance criteria for measuring achievement of objectives. Another component of the thesis was the construction of a model of the management system of threatened species. This theoretical model was conceptualised from opinions of experts and stakeholders occupying key roles in threatened species management. The model incorporated social aspects of management such as institutional and organisational factors influencing planning and the implementation of recovery plans. The model was built using a Bayesian belief network to assess the most influential components (issues, recovery strategies, and management requirements) on the likely outcomes. Expert opinions also assisted to identify gaps in the management system and formulate new management strategies. Finally, modelling allowed assessing different management scenarios and identified the key components that would improve recovery planning. Major findings of the investigation revealed that: 1) Although the three levels of government in Australia (Commonwealth, state/territory and local) are involved in recovery planning, it is the states/territories that have the most active role in preparing and operating recovery plans. State and territory-based legislation, policy and conservation strategies shape the form in which recovery planning is performed nationwide, as they are responsible for implementing 89% of national plans; 2) Overall compliance of plans with legislative requirements was adequate; although improvement is required in establishing a monitoring and evaluation framework. Overall, internal consistency of plans was also adequate in addressing threats and formulating research for knowledge gaps; but consistency was poor regarding the response to some threatening processes and the establishment of recovery criteria; 3) According to experts/stakeholders, the most influential issues relevant to the implementation of recovery plans are: coordination across Commonwealth, state and territory agencies, inconsistency of strategies and programs across jurisdictions, addressing management of threatened species on private land, incorporation of science into recovery planning, prioritising schemes for conservation action, and funding for the implementation of plans; 4) The recovery planning strategy may be improved by establishing mandatory monitoring and review reports; creating a national forum on threatened species; designing an appropriate insurance regime for volunteers; and establishing a national management information system.
|
848 |
Evaluating recovery planning for threatened species in AustraliaAlejandro Ortega Argueta Unknown Date (has links)
Loss of biodiversity is a major environmental issue in Australia. In response the Commonwealth Government has developed a national list of threatened species and prepared recovery plans under the provisions of the Commonwealth Environmental Protection and Biodiversity Conservation Act 1999 (EPBCA). However, knowledge on the appropriateness and effectiveness of those conservation and management schemes is limited. The aim of the thesis was to conduct an evaluation of recovery planning to assess its appropriateness as a conservation and management instrument, and investigate how legislative, institutional and organisational factors influence its implementation. Four research questions were addressed: 1) How does recovery planning operate in regard to legislative, jurisdictional and institutional aspects? 2) Do recovery plans comply with legislative requirements and coherent conservation planning? 3) What management factors have most influence on implementation of recovery plans at state level? and 4) What modifications could be made to the management system to improve implementation of recovery plans? The major approaches considered in this study were policy evaluation and systems analysis. Both approaches were incorporated in a framework of the thesis to construct a conceptualisation of the threatened species management system as a model. This allowed examining its structure, key elements and dynamics, and evaluation of its performance and effectiveness. Methods comprised interviews, content analysis of program documentation, qualitative and quantitative analysis of recovery plans, experts’ workshops, and systems analysis and modelling. The major set of quantitative data came from a database which incorporated content attributes of 236 recovery plans. Taking into account the Australian legislative requirements for preparing recovery plans, key content attributes were selected for assessing the degree of compliance. Internal consistency of plans was also assessed as a complementary measure of coherent management planning. Measures of internal consistency were: consistency between gaps of scientific information versus prescribed actions calling for research; consistency between major threatening processes versus prescription of threat abatement actions; and consistency between recovery objectives versus performance criteria for measuring achievement of objectives. Another component of the thesis was the construction of a model of the management system of threatened species. This theoretical model was conceptualised from opinions of experts and stakeholders occupying key roles in threatened species management. The model incorporated social aspects of management such as institutional and organisational factors influencing planning and the implementation of recovery plans. The model was built using a Bayesian belief network to assess the most influential components (issues, recovery strategies, and management requirements) on the likely outcomes. Expert opinions also assisted to identify gaps in the management system and formulate new management strategies. Finally, modelling allowed assessing different management scenarios and identified the key components that would improve recovery planning. Major findings of the investigation revealed that: 1) Although the three levels of government in Australia (Commonwealth, state/territory and local) are involved in recovery planning, it is the states/territories that have the most active role in preparing and operating recovery plans. State and territory-based legislation, policy and conservation strategies shape the form in which recovery planning is performed nationwide, as they are responsible for implementing 89% of national plans; 2) Overall compliance of plans with legislative requirements was adequate; although improvement is required in establishing a monitoring and evaluation framework. Overall, internal consistency of plans was also adequate in addressing threats and formulating research for knowledge gaps; but consistency was poor regarding the response to some threatening processes and the establishment of recovery criteria; 3) According to experts/stakeholders, the most influential issues relevant to the implementation of recovery plans are: coordination across Commonwealth, state and territory agencies, inconsistency of strategies and programs across jurisdictions, addressing management of threatened species on private land, incorporation of science into recovery planning, prioritising schemes for conservation action, and funding for the implementation of plans; 4) The recovery planning strategy may be improved by establishing mandatory monitoring and review reports; creating a national forum on threatened species; designing an appropriate insurance regime for volunteers; and establishing a national management information system.
|
849 |
Evaluating recovery planning for threatened species in AustraliaAlejandro Ortega Argueta Unknown Date (has links)
Loss of biodiversity is a major environmental issue in Australia. In response the Commonwealth Government has developed a national list of threatened species and prepared recovery plans under the provisions of the Commonwealth Environmental Protection and Biodiversity Conservation Act 1999 (EPBCA). However, knowledge on the appropriateness and effectiveness of those conservation and management schemes is limited. The aim of the thesis was to conduct an evaluation of recovery planning to assess its appropriateness as a conservation and management instrument, and investigate how legislative, institutional and organisational factors influence its implementation. Four research questions were addressed: 1) How does recovery planning operate in regard to legislative, jurisdictional and institutional aspects? 2) Do recovery plans comply with legislative requirements and coherent conservation planning? 3) What management factors have most influence on implementation of recovery plans at state level? and 4) What modifications could be made to the management system to improve implementation of recovery plans? The major approaches considered in this study were policy evaluation and systems analysis. Both approaches were incorporated in a framework of the thesis to construct a conceptualisation of the threatened species management system as a model. This allowed examining its structure, key elements and dynamics, and evaluation of its performance and effectiveness. Methods comprised interviews, content analysis of program documentation, qualitative and quantitative analysis of recovery plans, experts’ workshops, and systems analysis and modelling. The major set of quantitative data came from a database which incorporated content attributes of 236 recovery plans. Taking into account the Australian legislative requirements for preparing recovery plans, key content attributes were selected for assessing the degree of compliance. Internal consistency of plans was also assessed as a complementary measure of coherent management planning. Measures of internal consistency were: consistency between gaps of scientific information versus prescribed actions calling for research; consistency between major threatening processes versus prescription of threat abatement actions; and consistency between recovery objectives versus performance criteria for measuring achievement of objectives. Another component of the thesis was the construction of a model of the management system of threatened species. This theoretical model was conceptualised from opinions of experts and stakeholders occupying key roles in threatened species management. The model incorporated social aspects of management such as institutional and organisational factors influencing planning and the implementation of recovery plans. The model was built using a Bayesian belief network to assess the most influential components (issues, recovery strategies, and management requirements) on the likely outcomes. Expert opinions also assisted to identify gaps in the management system and formulate new management strategies. Finally, modelling allowed assessing different management scenarios and identified the key components that would improve recovery planning. Major findings of the investigation revealed that: 1) Although the three levels of government in Australia (Commonwealth, state/territory and local) are involved in recovery planning, it is the states/territories that have the most active role in preparing and operating recovery plans. State and territory-based legislation, policy and conservation strategies shape the form in which recovery planning is performed nationwide, as they are responsible for implementing 89% of national plans; 2) Overall compliance of plans with legislative requirements was adequate; although improvement is required in establishing a monitoring and evaluation framework. Overall, internal consistency of plans was also adequate in addressing threats and formulating research for knowledge gaps; but consistency was poor regarding the response to some threatening processes and the establishment of recovery criteria; 3) According to experts/stakeholders, the most influential issues relevant to the implementation of recovery plans are: coordination across Commonwealth, state and territory agencies, inconsistency of strategies and programs across jurisdictions, addressing management of threatened species on private land, incorporation of science into recovery planning, prioritising schemes for conservation action, and funding for the implementation of plans; 4) The recovery planning strategy may be improved by establishing mandatory monitoring and review reports; creating a national forum on threatened species; designing an appropriate insurance regime for volunteers; and establishing a national management information system.
|
850 |
Evaluating recovery planning for threatened species in AustraliaAlejandro Ortega Argueta Unknown Date (has links)
Loss of biodiversity is a major environmental issue in Australia. In response the Commonwealth Government has developed a national list of threatened species and prepared recovery plans under the provisions of the Commonwealth Environmental Protection and Biodiversity Conservation Act 1999 (EPBCA). However, knowledge on the appropriateness and effectiveness of those conservation and management schemes is limited. The aim of the thesis was to conduct an evaluation of recovery planning to assess its appropriateness as a conservation and management instrument, and investigate how legislative, institutional and organisational factors influence its implementation. Four research questions were addressed: 1) How does recovery planning operate in regard to legislative, jurisdictional and institutional aspects? 2) Do recovery plans comply with legislative requirements and coherent conservation planning? 3) What management factors have most influence on implementation of recovery plans at state level? and 4) What modifications could be made to the management system to improve implementation of recovery plans? The major approaches considered in this study were policy evaluation and systems analysis. Both approaches were incorporated in a framework of the thesis to construct a conceptualisation of the threatened species management system as a model. This allowed examining its structure, key elements and dynamics, and evaluation of its performance and effectiveness. Methods comprised interviews, content analysis of program documentation, qualitative and quantitative analysis of recovery plans, experts’ workshops, and systems analysis and modelling. The major set of quantitative data came from a database which incorporated content attributes of 236 recovery plans. Taking into account the Australian legislative requirements for preparing recovery plans, key content attributes were selected for assessing the degree of compliance. Internal consistency of plans was also assessed as a complementary measure of coherent management planning. Measures of internal consistency were: consistency between gaps of scientific information versus prescribed actions calling for research; consistency between major threatening processes versus prescription of threat abatement actions; and consistency between recovery objectives versus performance criteria for measuring achievement of objectives. Another component of the thesis was the construction of a model of the management system of threatened species. This theoretical model was conceptualised from opinions of experts and stakeholders occupying key roles in threatened species management. The model incorporated social aspects of management such as institutional and organisational factors influencing planning and the implementation of recovery plans. The model was built using a Bayesian belief network to assess the most influential components (issues, recovery strategies, and management requirements) on the likely outcomes. Expert opinions also assisted to identify gaps in the management system and formulate new management strategies. Finally, modelling allowed assessing different management scenarios and identified the key components that would improve recovery planning. Major findings of the investigation revealed that: 1) Although the three levels of government in Australia (Commonwealth, state/territory and local) are involved in recovery planning, it is the states/territories that have the most active role in preparing and operating recovery plans. State and territory-based legislation, policy and conservation strategies shape the form in which recovery planning is performed nationwide, as they are responsible for implementing 89% of national plans; 2) Overall compliance of plans with legislative requirements was adequate; although improvement is required in establishing a monitoring and evaluation framework. Overall, internal consistency of plans was also adequate in addressing threats and formulating research for knowledge gaps; but consistency was poor regarding the response to some threatening processes and the establishment of recovery criteria; 3) According to experts/stakeholders, the most influential issues relevant to the implementation of recovery plans are: coordination across Commonwealth, state and territory agencies, inconsistency of strategies and programs across jurisdictions, addressing management of threatened species on private land, incorporation of science into recovery planning, prioritising schemes for conservation action, and funding for the implementation of plans; 4) The recovery planning strategy may be improved by establishing mandatory monitoring and review reports; creating a national forum on threatened species; designing an appropriate insurance regime for volunteers; and establishing a national management information system.
|
Page generated in 0.0787 seconds