• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 15
  • Tagged with
  • 15
  • 15
  • 12
  • 12
  • 12
  • 12
  • 12
  • 12
  • 7
  • 4
  • 4
  • 4
  • 4
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

[en] ANALYSIS OF THE VLT CARIOCA PROJECT VIA REAL OPTIONS EVALUATING THE RETURN TO THE WINNER OF THE BID AND THE IMPACT OF GOVERNMENT INCENTIVES / [pt] ANÁLISE DO PROJETO VLT CARIOCA VIA OPÇÕES REAIS AVALIANDO O RETORNO PARA O VENCEDOR DA LICITAÇÃO E OS IMPACTOS DOS INCENTIVOS GOVERNAMENTAIS

ANDREW DE JESUS FREITAS SILVA 20 June 2018 (has links)
[pt] A escolha da cidade do Rio de Janeiro como sede da Olimpíada de 2016 trouxe a necessidade de realização de diversos projetos de infraestrutura de transportes. Um destes projetos envolveu a revitalização da zona portuária, conhecido como Projeto Porto Maravilha, e entre as melhorias projetadas estava a implantação de um novo modal de transportes sobre trilhos, o VLT Carioca. Este trabalho analisa o projeto em regime de parceria público-privada do VLT Carioca na zona portuária da cidade do Rio de Janeiro através da teoria de opções reais. O objetivo do estudo é determinar o retorno esperado do projeto para o consórcio vencedor da licitação, analisar o impacto dos incentivos governamentais para o parceiro privado e os custos totais do projeto para o Estado. A demanda estocástica é modelada por meio do movimento geométrico browniano (MGB), e os resultados indicam que o projeto tem um retorno relativamente pequeno em relação ao investimento inicial, as garantias oferecidas pela Prefeitura aumentam o valor do projeto e a realização do projeto sob a modalidade de parceria público-privada traz para o parceiro público uma economia de aproximadamente 50 por cento do valor total. / [en] The choice of the city of Rio de Janeiro to must the 2016 Olympics games brought the need to carry out transportation infrastructure projects. One of these projects involved the revitalization of the port area, known as the Porto Maravilha Project. One of the improvements projected was a new modal rail transport, the VLT Carioca. This paper analyzes the public-private partnership project VLT Carioca in port area of Rio de Janeiro city using real options. The purpose of this study is to determine the expected return of project for winning bidding consortium, analyzing the impact of government incentives to private partner, and the total costs to state. Stochastic demand is modeled as a Brownian geometric motion (GBM). The results indicate that the project has a small return on the initial investment, the guarantees offered by government increase the value of the project and the realization of the project under the public-private partnership modality brings to the public partner a gain of economy approximately 50 percent of the value.
12

[en] REAL OPTION THEORY: AN APPROACH TO WIND POWER / [pt] TEORIA DAS OPÇÕES REAIS: UMA ABORDAGEM EM ENERGIA EÓLICA

CAROLINE DA SILVA PANTOJA 25 April 2014 (has links)
[pt] O Setor Elétrico Brasileiro (SEB) vem passando por diversas mudanças. A reforma iniciada em 1993 implicou na alteração da característica do setor de ser até então majoritariamente estatal. As alterações no SEB nos anos de 2003 e 2004 implementaram os chamados Ambientes de Contratação Regulado e Livre, respectivamente ACR e ACL. Recentemente, mais mudanças estruturais marcaram o SEB com a nova Lei de número 12.783/13, que trata da renovação das concessões do setor. Neste contexto, destacam-se os empreendimentos eólicos e seu aumento de participação na matriz elétrica brasileira. A matriz elétrica brasileira permanece majoritariamente hídrica, contudo o segmento eólico tem se destacado nos leilões de energia, apresentando com frequencia preços mais competitivos que projetos de Pequenas Centrais Hidrelétricas (PCHs) e térmicas movidas à biomassa. Desta forma, dada a importância crescente da fonte eólica de energia, o presente trabalho propõe a aplicação de um modelo de avaliação de uma planta eólica em condições de incerteza, com a utilização da Teoria das Opções Reais. A flexibilidade abordada no trabalho em tela foi incorporada na escolha do mecanismo de venda da energia gerada. Neste sentido, considerou-se que o montante de energia não negociado no ACR (através de Leilões regulados) poderá ter a opção de ser negociado em contratos bilaterais no ACL ou liquidado no mercado de curto prazo ao Preço de Liquidação de Diferenças (PLD). Os resultados indicaram um aumento no valor do projeto com a inclusão desta flexibilidade. / [en] The Brazilian Electric Power Industry (SEB) has been going through many changes. The reform begun in 1993 resulted in a modification on characteristics of this sector that was mainly controlled by the government until that time. The changes in SEB occurred in 2003 and 2004 resulted in the creation of the Regulated Contracting Environment (ACR) and the Free Contracting Environment (ACL). Recently, new modifications happened in this sector with the law number 12.783/13, which regulates the Renovation of Concessions in the sector. In this context, it can be highlighted the wind power projects and their increasing participation in Brazilian electricity generation matrix. The Brazilian electricity generation matrix is still concentrated in hydroelectrical generation. However, wind power plants have been standing out in the last auctions, with more competitive prices than Small Hydro Power (PCH) and biomass projects. Therefore, considering the increasing importance of wind power source, this work proposes the application of an investment model under uncertainty for evaluating a wind power plant using the Real Option Theory. The flexibility used in this work refers to the choice of the mechanism for selling the generated energy. In this sense, it was assumed that the amount of generated energy which wouldn’t be contracted in the ACR could have the possibility of being negotiated in contracts in the ACL or it would be sold in the short-term market through the Differences Settlement Price (PLD). Results indicate an increase in the project value with the inclusion of this flexibility.
13

[en] VALUE CREATION IN THE INNOVATION MARKET THROUGH THE REAL OPTIONS THEORY CONCEPTS: A QUALITATIVE FRAMEWORK FOCUSED IN START-UPS PRODUCTS AND SERVICES / [pt] CRIAÇÃO DE VALOR NO MERCADO DE INOVAÇÃO ATRAVÉS DOS CONCEITOS DA TEORIA DE OPÇÕES REAIS: UM FRAMEWORK QUALITATIVO FOCADO NA ESTRUTURAÇÃO DE PRODUTOS E SERVIÇOS DE START-UPS

ADELE BRAZ MAGALHAES 15 February 2019 (has links)
[pt] O constante crescimento da competitividade entre indústrias traz a necessidade de encontrar soluções para sustentar a vantagem competitiva por meio da inovação. Devido à diversidade de projetos e incerteza envolvida na inovação, a gestão dos projetos e o cálculo de valor, assim como sua gestão de risco, deve ser efetivo. Esta dissertação identifica a oportunidade do cálculo do valor de empresas Startups considerando a flexibilidade de projetos de inovação e tem como objetivo a criação de um framework conceitual para avaliar a possibilidade de geração de valor em negócios de produtos e serviços inovadores com base em análise qualitativa dos conceitos de opções reais. Durante a pesquisa e pela da análise dos métodos e processos das teorias da inovação e das opções reais, foi possível delimitar aspectos para desenvolvimento do framework: avaliação qualitativa, inovação de produtos e serviços; empresa alvo Startup, modelo do framework e opções reais a serem avaliadas (Opção de Aprendizado, Opção de Abandono, Opção de Switch e Opção de Expansão).O estudo estrutura e apresenta um framework que inclui um processo de quatro fases, permitindo assim que Startups identifiquem maior valor no seu negócio para melhorá-lo. / [en] The constant growth in competition between companies has brought the need to find solutions to sustain competitive advantage through innovation. Due to projects diversity and the uncertainty inherent to innovation, the project management and value calculation, as well as its risk management, must be effective. This dissertation identifies the opportunity to calculate the value generated by innovation the flexibility to react to the uncertainties inherent to innovation projects, and has as objective to create a conceptual framework focused on Startup Products and Services business plan. During the research and through the analysis of methods and processes of real options and innovation theories, we designed the framework development: qualitative evaluation, product and services innovation, Startups as target companies, framework model and real options to be evaluated (Abandonment Option, Learning Option, Switch Option and Expansion Option). This study structures and presents a framework that includes a four step process, hence allowing Startups to obtain higher value to improve their business.
14

[en] PRECIFICATION OF MANAGERIAL FLEXIBILITY IN GTL PLANTS USING THE METHODOLOGY OF REAL OPTIONS / [pt] PRECIFICAÇÃO DE FLEXIBILIDADES GERENCIAIS EM PLANTAS GTL UTILIZANDO A METODOLOGIA DE OPÇÕES REAIS

SILVIO FRANKLIN MONCAO DO VALE 30 June 2008 (has links)
[pt] O objetivo da presente dissertação é capturar o valor da opção de parada temporária que uma planta GTL oferece em cenários econômicos desfavoráveis para mantê-la operando. Desta forma, o autor considera que a metodologia das opções reais é a mais indicada para avaliar tal flexibilidade, sendo assim, o objetivo principal deste estudo é a análise da opção de parar temporariamente através da utilização do processo estocástico (Movimento geométrico Browniano)e a correlação de Cholesky entre cada input e os outputs da planta. O autor acredita que os resultados desta dissertação podem auxiliar os gestores que enxergam flexibilidades em seus projetos a antecipar prejuízos prolongados em cenários desfavoráveis para manter uma planta funcionando. / [en] The objective of this dissertation is to capture the value of the option to temporarily stop that a GTL plant offers in unfavorable economic scenarios to keep it operating. Thus the author believes that the methodology of real options is the best placed to assess such flexibility, and thus the main objective of this study is the analysis of the option to temporarily stop using the stochastic process (geometric Brownian Motion) and the correlation Cholesky between each input and outputs of the plant. The author believes that the results of this dissertion can assist the managers who see flexibilities in its projects to anticipate damages drawn out in favorable scenes to keep a plant functioning.
15

[pt] AVALIAÇÃO SOCIOECONÔMICA DE PROJETOS EM AMBIENTE DE INCERTEZA: COMBINANDO A ANÁLISE DE CUSTO-BENEFÍCIO (CBA) COM A ANÁLISE PELA TEORIA OPÇÕES REAIS (ROA) / [en] SOCIOECONOMIC VALUATION OF PROJECTS UNDER UNCERTAINTY: COMBINING COST-BENEFIT ANALYSIS (CBA) AND REAL OPTIONS ANALYSIS (ROA)

CARLOS FREDERICO VANDERLINDE TARRISSE DA FONTOURA 01 November 2016 (has links)
[pt] Um Governo deve ser comprometido com a melhoria contínua da prestação de serviços públicos e parte significativa deste comprometimento dá-se por garantir que os fundos públicos são gastos em atividades e projetos que proporcionam os maiores benefícios para a sociedade. A realização de uma Análise de Custo-Benefício (CBA) fornece ao decisor comparações quantitativas das alternativas de investimento, em conjunto com informações de apoio adicionais sobre todos os custos e benefícios que não puderam ser quantificados, auxiliando no processo decisório. Uma limitação da CBA é que, apesar da incerteza ser um aspecto inerente a ela, os fluxos de custos e benefícios futuros são estimados baseando-se somente em informações e premissas disponíveis no momento da decisão de investimento. Já existe extensa literatura demonstrando ser cada vez maior a importância de um gerenciamento empresarial flexível, com revisões constantes das estratégias e dos planos já concebidos. Logo, se percebe a necessidade de uma ferramenta como a Análise pela Teoria de Opções Reais (ROA) que permita a inclusão das incertezas e flexibilidades gerenciais na CBA. O principal objetivo dessa tese foi desenvolver um quadro teórico que permitisse a avaliação socioeconômica de projetos em ambiente de incerteza por meio da combinação da análise de custo-benefício e da análise pela teoria de opções reais. Adicionalmente, ela também tentou verificar se avaliação socioeconômica proposta produz resultados satisfatórios quando aplicada na prática. A abordagem integrada foi denominada de Análise de Custo-Benefício com Opções Reais (COBRA). De forma a verificar se esta nova abordagem agrega valor a um projeto, ela foi aplicada na avaliação de uma termelétrica a biomassa com unidade de produção de etanol em um cenário sem flexibilidade (Caso Base) e com flexibilidade (Caso Flexível). Por meio dessa aplicação, foi verificado que avaliação do projeto por meio da abordagem COBRA aumentou seu valor em 93 milhões de euros, tornando o resultado final positivo para a sociedade, permitindo a requisição de apoio financeiro governamental e viabilizando a realização do projeto. Os resultados obtidos indicam que, se aplicada corretamente, esta metodologia pode vir a ser uma alternativa viável para o problema de avaliação socioeconômica de projetos com flexibilidades em ambiente de incerteza. / [en] A government must be committed to the continuous improvement of its public services and a significant part of this commitment involves ensuring that public funds are spent on activities and projects that provide the greatest benefits to society. Conducting a Cost-Benefit Analysis (CBA) provides the decision maker with quantitative comparisons of investment alternatives, together with additional supporting information about all costs and benefits that could not be quantified, assisting in decision making. A limitation of CBA is that despite uncertainty being an inherent aspect to it, the future flows of costs and benefits are estimated based only on information and assumptions available at the time of the investment decision. Since there already is extensive literature demonstrating the increasing importance of flexible business management, with constant revisions of previously designed strategies and plans, one realizes the need for a tool like Real Options Analysis (ROA) that allows the inclusion of uncertainty and managerial flexibility in CBA. The main objective of this thesis was to develop a theoretical framework for the socioeconomic evaluation of projects under uncertainty through the combination of cost-benefit analysis and real options analysis. In addition, it also tried to verify if the proposed framework produces satisfactory results when applied in practice. The integrated approach was called COst-Benefit Real options Analysis (COBRA). In order to verify if this new approach adds value to a project, it was applied in the evaluation of a biomass powerplant with an ethanol production unit in a scenario without flexibility (Base Case) and with flexibility (Flexible Case). Through this application, it was found that the project evaluation through the COBRA approach increased its value by 93 million, turned the project into something beneficial for society, enabled government subsidies and made de project feasible. The results indicate that, if applied correctly, this approach may prove to be a viable alternative to the problem of socioeconomic evaluation of projects with flexibilities under uncertainty.

Page generated in 0.0386 seconds