Spelling suggestions: "subject:"etheses -- own anda regional planning"" "subject:"etheses -- own ando regional planning""
131 |
Housing choice and satisfaction : a case of Summerfields residential area.Mbhele, Bongumusa T. January 1998 (has links)
No abstract available. / Thesis (M.T.R.P.)-University of Natal, Durban, 1998.
|
132 |
Assessment of the extent to which Lesotho's Land Act 1979 (Act#17) had and impact on urban morphology and patterns of land development in Maseru and its peri-urban areas : the case of Mapeleng and Sekamaneng.Ntlaloe, Khopotso Hazel. January 1998 (has links)
No abstract available. / Thesis (M.T.R.P.)-University of Natal, Durban, 1998.
|
133 |
The potential for the application of pedestrianisation and traffic calming to suburbanised commercial streets where pedestrians and vehicles are in conflict.Pooran, Sonitha. January 1995 (has links)
In response to urban society 's disenchantment with the automobile and the conflict that has resulted between pedestrians and vehicles, came the development of pedestrian oriented streets. This involved a clear shift in priorities to redress the balance in the street in favour of the pedestrians with respect to motor vehicles - in a process called "Pedestrianisation". Much more common, however was to "Traffic Calm" those streets in which motor vehicle access was still necessary. This study examines the application of "Pedestrianisation" and "Traffic Calming" to larger suburbanised commercial streets as a potential solution in mitigating the conflict between pedestrians and vehicles. In order to do this, the study evaluates the success/failure of the Umhlanga and Pietermaritzburg "Pedestrianisation" and "Traffic Calming" schemes. This evaluation proceeds by examining how each area caters/does
not cater for the needs of its "users" (pedestrians and motorists) and tenants. The evaluation also includes obtaining the comments of the planners that were involved in each scheme, in order to determine if the initial objectives of each plan had been achieved or not. Findings and conclusions from the various data collection methods are presented. These are followed by recommendations that are important for the success of any "Pedestrianisation" and "Traffic Calming" scheme that may be implemented more specifically in larger suburbanised commercial streets. / Thesis (M.T.R.P.)-University of Natal, Durban, 1995.
|
134 |
The extent to which the mortgage indemnity scheme facilitates access to housing credit from private financial institutions to low-income households in the formerly redlined areas : a case study of Umlazi township.Sigcau, Lutango S. January 1997 (has links)
No abstract available. / Thesis (M.Sc.U.R.P.)-University of Natal, Durban, 1997.
|
135 |
Appropriate management and development framework for transitional rural settlements : a comparative study within Ngcolosi Tribal Authority.Bhengu, Thulani. January 1998 (has links)
No abstract available. / Thesis (M.T.R.P.)-University of Natal, Durban, 1998.
|
136 |
Well-located land for low-income housing as a means towards achieving improvements in living standards and quality of life of low-income people : a case study of East Wiggins Fast Track.Mpantsha, Dolly Ntombifuthi. January 2000 (has links)
Abstract not available. / Thesis (M.Sc.U.R.P.)-University of Natal, Durban, 2000.
|
137 |
Informal commercial development, particularly spaza shops, in future planning of low income areas : the case study of Clermont-Kwadabeka.Teffo, Lauretta. January 1996 (has links)
No abstract available. / Thesis (M.T.R.P.)-University of Natal, Durban, 1996.
|
138 |
The impact of peripherally located low income housing projects in Ethekwini municipality : a case-study of slum clearance project, Welbedacht East.Sokhela, Sandile Chrizostomas. January 2006 (has links)
The study was conducted in the community of Wellbedacht East in eThekwini Municipality. Welbedacht East (WE) is located north-east of Umlazi Township and west of Chatsworth and also expands into the eNgonyameni Traditional Authority. WE is about 23 kilometres from Pinetown, 43 kilometres from Durban, and 15 kilometres from Chatsworth Centre. It is one of the development projects undertaken to spearhead the very ambitious programme of slums clearance, in order to confront the challenge of informal settlements in the eThekwini Municipal area. The study area has been chosen because it is one of the largest slum clearance projects in eThekwini Municipality (Durban) and it is peripherally located. Due to its peripheral location, transport services, and facilities such as schools, a clinic, a police station, churches and shops are either scarce, or non-existent. A systematic sample of 60 households was drawn from a population of residents whose characteristics had been considered to reflect those of the larger population. The project has 5000 sites and 3000 beneficiary households were relocated to this project from the inner city areas. The study is aimed at examining the impact and effects of relocation on beneficiary households in peripherally located low-income housing projects, to determine whether or not transport costs are higher in peripherally situated settlements than in more central locations, and whether residents in peripheral settlements are less able to access the benefits of urban living, including economic opportunities and social networks necessary for survival. It argues that the relocation of informal settlements to peripheral sites promotes an urban sprawl, and thus deviates from the eThekwini Municipality's goal of promoting development as a 'compact city'. The findings in this study are that, firstly, there is clear evidence to suggest that relocations to peripheral areas can cause significant harm to relocated beneficiary households' livelihood strategies, and secondly, that the municipality's failure to coordinate its relocations plan with other spheres of government involved with social service delivery, especially the departments of health and education, resulted in medium-term deprivation of access to social services. The conclusions drawn from the findings are that a holistic and integrated approach to housing development needs to be enforced, whereby the minimum facilities, such as schools, clinics and other social amenities are prioritised if the project is poorly located. The study therefore recommends that low-income housing projects be located closer to the economic nodes, in order to eliminate transport costs and other social difficulties associated with peripheral location. The compact city settlement design epitomised by higher residential densities and the development of multifunctional habitats would, to a greater extent, reduce the need to travel, and improve quality of life and access to urban goods and services. / Thesis (M.T.R.P.)-University of KwaZulu-Natal, 2006.
|
139 |
The application of pedestrianisation and traffic calming to curb vehicle and pedestrian conflict in the Newcastle CBD : a case study of Scott Street.Biyela, Thandiwe. January 2000 (has links)
In response to urban society's disenchantment with the automobile and the conflict that has resulted between vehicles and pedestrians, came the development of pedestrian oriented streets. This constitutes a clear shift in priorities to redress the imbalance in the street in favour of pedestrians with respect to motor vehicles, in a process known as pedestrianisation. Much more common, however, was to traffic calm those streets in which motor vehicle access was still needed. This study examines the application of pedestrianisation and traffic calming to the Central Business District (CBD) as a potential solution for mitigating conflict between pedestrians and vehicles. To do this the study evaluates the effectiveness of the Pietermaritzburg (PMB) pedestrianisation and traffic calming plan, by looking at how the area caters/does not cater for the needs of its users (pedestrians and motorists) and tenants. The evaluation also includes obtaining comments from the planners, tenants and prospective users in Newcastle in order to determine whether the objectives achieved in PMB could be made useful in the proposed pedestrianisation and traffic calming plan of the Newcastle CBD. Findings and conclusions from various data collection methods are presented followed by recommendations that are important for the successful implementation of any pedestrianisation and traffic calming scheme. / Thesis (M.T.R.P.)-University of Natal, 2000.
|
140 |
The role of the local authority in accommodating street trading : the case of Manzini City Council in Swaziland.Dlamini, Sipho N. January 2002 (has links)
Abstract not available. / Thesis (M.Sc.U.R.P.)-University of Natal, 2002.
|
Page generated in 0.1377 seconds