• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 26
  • 16
  • 7
  • 3
  • 3
  • 2
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 84
  • 84
  • 33
  • 17
  • 16
  • 15
  • 15
  • 14
  • 14
  • 14
  • 12
  • 12
  • 12
  • 12
  • 11
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
81

Analýza provozu trakční napájecí stanice / Hybrid AC/DC,AC/AC substation operation analysis

Lakomý, Marek January 2014 (has links)
The work analyzes the operation of hybrid substations. The first chapter provides an analysis of domestic traction systems and describes in detail specific station. The next chapter follows the first in a way in which obtained parameters are converted to parameters suitable for the simulation program and presents its results. The third chapter discusses the serial communication used in one switchgear and about voltage regulator that controls one high voltage field. The last chapter verifies the simulation results obtained from the second chapter with real measurement and direct comparison is also included.
82

Ride through Capability of medium-sized Gas Turbine Generators : Modelling and Simulation of Low Voltage Ride through Capability of Siemens Energy's medium-sized GTG and Low Voltage Ride through Grid Codes requirements at point of connection

Almailea, Daniel January 2023 (has links)
In order to reduce emissions and achieve sustainable energy systems, renewable energy is increasingly being integrated into the power grid. However, the integration of renewable energy into the grid poses several challenges, including maintaining a stable power supply under changing and unpredictable conditions. Low Voltage Ride Through (LVRT) assesses a generator's ability to maintain stable voltage during grid voltage drops, which is crucial for renewables due to their low inertia and vulnerability to voltage disruptions caused by changes in wind or sunlight. LVRT requirements are defined by regional grid codes and regulations, which vary in their diversity. A study was conducted using Matlab Simulink to model and simulate the LVRT phenomenon on Siemens Energy's medium gas turbine generator. The entire power system generation system was simulated to observe the system's response and the generator's behavior during LVRT events. A previous gas turbine power plant project in Romania, delivered by Siemens Energy in Finspång, was simulated for analysis and compared against the grid code requirements. The findings indicated that the Siemens Energy gas turbine model SGT-750 satisfies the Romanian LVRT grid code requirements.
83

Řízený laboratorní zdroj / Controlled laboratory supply

Štibraný, Miroslav January 2016 (has links)
Master’s thesis deals with design of laboratory supply with precise voltage and current measuring. At the beginning it presents properties, advantages and disadvantages of linear and switching supplies, based on these facts it chooses a linear type of regulator. The design continues with detailed description of power and control analog and digital circuits. The thesis includes description of taking control over the supply from the front panel or through computer. The last part is devoted to measurement results and to presentation of some static and dynamic parameters of the designed supply.
84

Systém snímání dat a ovládání vodní elektrárny prostřednictvím internetové techniky / Data Acquisition and Control System of Hydroelectric Power Plant Using Internet Techniques

Sattouf, Mousa January 2015 (has links)
Vodní energie se nyní stala nejlepším zdrojem elektrické energie na zemi. Vyrábí se pomocí energie poskytované pohybem nebo pádem vody. Historie dokazuje, že náklady na tuto elektrickou energii zůstávají konstantní v průběhu celého roku. Vzhledem k mnoha výhodám, většina zemí nyní využívá vodní energie jako hlavní zdroj pro výrobu elektrické energie.Nejdůležitější výhodou je, že vodní energie je zelená energie, což znamená, že žádné vzdušné nebo vodní znečišťující látky nejsou vyráběny, také žádné skleníkové plyny jako oxid uhličitý nejsou vyráběny, což činí tento zdroj energie šetrný k životnímu prostředí. A tak brání nebezpečí globálního oteplování. Použití internetové techniky k ovladání několika vodních elektráren má velmi významné výhody, jako snížení provozních nákladů a flexibilitu uspokojení změny poptávky po energii na straně spotřeby. Také velmi efektivně čelí velkým narušením elektrické sítě, jako je například přidání nebo odebrání velké zátěže, a poruch. Na druhou stranu, systém získávání dat poskytuje velmi užitečné informace pro typické i vědecké analýzy, jako jsou ekonomické náklady, predikce poruchy systémů, predikce poptávky, plány údržby, systémů pro podporu rozhodování a mnoho dalších výhod. Tato práce popisuje všeobecný model, který může být použit k simulaci pro sběr dat a kontrolní systémy pro vodní elektrárny v prostředí Matlab / Simulink a TrueTime Simulink knihovnu. Uvažovaná elektrárna sestává z vodní turbíny připojené k synchronnímu generátoru s budicí soustavou, generátor je připojen k veřejné elektrické síti. Simulací vodní turbíny a synchronního generátoru lze provést pomocí různých simulačních nástrojů. V této práci je upřednostňován SIMULINK / MATLAB před jinými nástroji k modelování dynamik vodní turbíny a synchronního stroje. Program s prostředím MATLAB SIMULINK využívá k řešení schematický model vodní elektrárny sestavený ze základních funkčních bloků. Tento přístup je pedagogicky lepší než komplikované kódy jiných softwarových programů. Knihovna programu Simulink obsahuje funkční bloky, které mohou být spojovány, upravovány a modelovány. K vytvoření a simulování internetových a Real Time systémů je možné použít bud‘ knihovnu simulinku Real-Time nebo TRUETIME, v práci byla použita knihovna TRUETIME.

Page generated in 0.0593 seconds