1 |
Most na silnici I/44 / Bridge on the I/44 roadMajer, David January 2018 (has links)
The subject of this thesis is the design and analysis of five-span bridge construction across the railway on the route Zábřeh - Šumperk and the Morava river. There will be made separated bridge for each direction, only right bridge is considered in the thesis. Object is located to 1st class road I/44 on the route between Mohelnice and Jeseník. Three variants were designed - two prestressed chamber girders, one prestressed chamber girder with prefabricated consoles and construction of concrete slab mixed with two steel girders. After these variants were weigh up and the first one, with the length of cantilevered construction 235,6 m and maximum lenght of span 60 m, was chosen for analysis. Calculation of load effects was made by software Scia Engineering 2013 and the analysis was made according to current standards by manual calculation depending on limit states and their influence on the design as well. Drawing documentation and visualization are also part of the thesis.
|
Page generated in 0.0492 seconds