• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 60
  • 5
  • Tagged with
  • 65
  • 28
  • 26
  • 23
  • 20
  • 18
  • 13
  • 10
  • 9
  • 9
  • 8
  • 8
  • 7
  • 7
  • 6
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
51

En granskning av riskanalyser för byggnadsarbete i projekteringsskedet / A review of risk analyzes for construction work within the design phase

Mujakic, Larisa, Hänninen, Simone January 2020 (has links)
The following research study examines the risk analysis of a construction project during its design phase and its starting point is work involving heavy prefabricated components or heavy shuttering elements and work in a place or area with passing vehicular traffic. The aim of the research study is to identify faults within risk analyzes and the goal is to be able to recommend improvement measures that can be implemented in practice. The research study was carried out over a period of 10 weeks in collaboration with the construction company Veidekke Entreprenad AB. The basis of the research consists of a literature search, interviews and a survey. Seven interviews have been conducted with officials and professionals, as well as a survey. Internal documents have been reviewed and compiled to describe how Veidekke's risk analysis process works. The study shows that currently, there is a certain problem in the approach of carrying out risk analyzes. Reversing vehicles, narrow spaces and poor visibility are the causes of accidents involving vehicles at construction sites. Clamp injuries are common when handling heavy building elements, as a result of elements tipping and falling over. The study shows that a collaboration between BAS-P and BAS-U, chief safety representative, safety representative and professional workers should be extended to improve risk analyzes. By increasing the production experience of BAS-P, taking advantage of visualization programs, introducing stricter educational requirements, rationalizing risk assessments and introducing clearer regulations from authorities, risk analyzes can be improved and lead to less injuries and accidents at construction sites. / Följande examensarbete granskar riskanalyser av ett byggprojekt under projekteringsskedet. Riskanalysernas utgångspunkt är arbete med tunga bygg- och formbyggnadselement och arbete på plats eller område med passerande fordonstrafik.  Målet med examensarbetet är att identifiera bristfälligheter i riskanalyser och målsättningen är att kunna rekommendera förbättringsåtgärder som kan implementeras i praktiken, för att minska antalet olyckor och skador som sker i byggbranschen.  Examensarbetet genomfördes under en tidsperiod på 10 veckor i samarbete med bygg- och anläggningsföretaget Veidekke Entreprenad AB, i syfte att utveckla och förbättra riskanalysprocessen.  Undersökningens grund utgörs av en litteratursökning, intervjustudie och enkätundersökning. Information från myndigheterna Arbetsmiljöverket och Trafikverket samt vetenskapliga artiklar har granskats. Sju intervjuer har genomförts med tjänstemän och yrkesarbetare samt en enkätundersökning på ett av Veidekkes byggetableringar. Som grund för nulägesbeskrivningen har även interna dokument granskats och sammanställts för att redogöra hur Veidekkes riskanalysprocess går till.  I studien framgår det att det finns en viss problematik i tillvägagångssättet att utföra riskanalyser i nuläget. Backande fordon, trånga utrymmen och dålig sikt är orsaker till att det sker olyckor med fordon på byggarbetsplatser. Klämskador är vanligt förekommande olyckor vid hantering av tunga byggelement, till följd av att element tippar och faller. Studien visar att ett samarbete mellan BAS-P och BAS-U, skyddsombud och yrkesarbetare ska utökas för att förbättra riskanalyser. Genom att öka produktionserfarenheten hos BAS-P, nyttja visualiseringsprogram, införa striktare utbildningskrav, rationalisera riskbedömningar och införa tydligare regelverk från myndigheter kan riskanalyser förbättras och leda till mindre skador och olyckor på byggarbetsplatser.
52

En analytisk studie av kompetensbrist som ett hinder för ett framgångsrikt byggande i trä : Med utgångspunkt i aktörernas omställning och påverkningsgrad på träbyggnadsprocessen / An Analytical Study of Lacking Competence as an Obstacle to the Progress of Successful Building with Wood : Based on the adaptation and degree of influence of the actors within the wooden building process

Hellenborn, Benjamin, Haglund, Kristoffer January 2020 (has links)
Syfte: Det moderna samhället befinner sig i en miljökris där utsläppsnivåerna måste minska om den globala uppvärmningen skall begränsas till 1,5 Co . Byggsektorn står för 21% av Sveriges koldioxidutsläpp, 36% av den totala energianvändningen och 31% av allt genererat avfall. Forskningen visar att en ökning av andelen trä i nyproducerade byggnader kan minska koldioxidutsläppen. Denna rapport syftar till att kartlägga de faktorer relaterade till kompetensbrist som negativt påverkar ett framgångsrikt byggande i trä. Metod: Genom en litteraturstudie av befintlig forskning på området har forskningsfronten kartlagts och använts som utgångspunkt för studiens datainsamling. Primärdatainsamlingen är gjord som semi-strukturerade kvalitativa intervjuer. Empiri har analyserats tematiskt i syfte att finna de mönster som framträder i data. Resultat: Kompetensbristen hos beställare är den enskilt största faktorn som negativt påverkar ett framgångsrikt byggande i trä. För att beställare ska bygga i trä måste det vara ekonomiskt lönsamt. Kompetensbristen anses ligga i att identifiera de nya arbetssätten och utmaningarna som att bygga i trä medför snarare än att lösa problemen i sig. För att uppnå ett ökat framgångsrikt byggande i trä krävs en omställning hos alla aktörer. Störst och förmodligen svårast att motivera är den hos de stora entreprenadföretagen på grund av delägarskap i betongindustrin och företagens storlek. Konsekvenser: Genom att identifiera faktorer som negativt påverkar ett framgångsrikt byggande i trä, skapas ett underlag för en utveckling av det moderna träbyggandet och på så sätt ett bidrag till att minska byggsektorns miljöpåverkan. Rekommendation: Precisa beräkningsmodeller för trähus behövs för att kunna göra exakta kalkyler. En nyckelfaktor till att minimera den ekonomiska osäkerheten hos beslutsfattare är exakta kalkyler. Begränsningar: Något som eventuellt kan begränsa studien är den geografiska utspridningen, alla representanter kommer främst från södra delarna av Sverige. Detta gör att utspridningen inte är representativ för hela landet. Vissa discipliner inom branschen representeras endast av en respondent och ingen hänsyn har tagis till olika upphandlingsformers påverkan. / Purpose: The modern society is in the midst of an environmental crisis and carbon dioxide emissions must decrease if the global warming is to be limited to 1,5 Co . The construction sector in Sweden is responsible for 21% of the total carbon dioxide emissions, 36% of total energy usage and 31% of all waste. Research implies that by increasing the amount of wood in buildings the amount of carbon dioxide emitted can be reduced. This report aims to map out the factors linked to a lack of competence that hinders the progress of successful building with wood. Method: By performing a study of the existing literature on the subject the most relevant research can be converged and used as a starting point for the data collection part of this study. The primary data collection is conducted through semi-structured qualitative interviews. Empiricism was analyzed thematically with the purpose of finding patterns that present themselves in data. Findings: Developers that are lacking competence is believed to be the single greatest factor that hinders the progress of successful building with wood. If developers are to build with wood it has to be financially profitable. The lack of competence is believed to be connected to identifying the new work procedures and challenges that building with wood induces rather than solving the problem itself. If an increased usage of wood in construction is to be achieved all involved actors must readjust their practices. The greatest and probably the most difficult readjustment to motivate is the one that has to be made by the largest contractors because of their part-ownership in the concrete industry and the size of the companies. Implications: By identifying the factors that negatively affect the progress of successful building with wood a foundation for further development of modern wood construction can be established and assist in reducing the environmental impact of the construction sector. Recommendation: Precise calculation models for wood buildings are required for improving the accuracy of cost calculations. A key factor to minimizing the economic uncertainties of decisionmakers is accurate cost calculations. Limitations: The geographical diffusion of the study might limit its use. The respondents originate mostly from the southern part of Sweden. The diffusion might not be representative of the entire country. Some disciplines within the construction industry are represented by a single respondent and different forms of procurement has not been taken in to consideration.
53

Agile project management in the design stage – Construction projects possibilities to apply agile methods / Agil projektledning i projekteringen – Byggprojekts möjligheter att tillämpa agila metoder

Ekström, Axel, Pettersson, Emma January 2016 (has links)
The construction industry has a clear process it follows therefore the working method within it also has become rigid. Through long time the stage-gate model has been used by the project management. Construction projects are often complex, have long stages and long decisions routes. When a stage is completed questions have been raised and lead to that change is needed to be made before moving on to next stage. This takes time, costs more than calculated and the function gets compromised. The purpose with this thesis is to investigate if the current project management approach can be performed more efficiently by applying agile project management to the design stage. This thesis is performed with a qualitative research approach. It started with a thoroughly literature review of relevant topics such as agile project management, the construction process and change management. When a solid base of knowledge was gathered about the research area an interview study was conducted and a survey was sent out. The findings are a result from the interview study and the survey. The interview questions and findings are divided into four focus areas of agile project management which are project planning, meeting structure, group collaboration and communication. The discussion connects the literature with the information from the interviews and the discussion is presented with the reflections from the authors. The conclusions present the answers on the research questions. The final chapter about further research is presenting perspectives that have not been answered in this thesis. The thesis concludes that project management methods within construction projects are not as rigid as it is described in the literature. The lack of knowledge and awareness of other working methods creates a culture of "this is how it always has been done" within the four focus areas of agile project management. All of the reference projects were time pressured and it was in those situations where ii most tendencies to adjust management method was shown. The studied projects had fixed meeting structures and when emergency occurred, extra meetings were held. The project management teams had good collaboration due to that they were co-located and not too big groups. The co-location also facilitated the communication which was compared to team members that were not co-located and struggled with the communication. The communication generally worked well vertically and was struggling horizontally. Agile project management cannot be achieved to 100% and it is difficult to apply all of its characteristics on the construction industry since it was developed from the software industry which has other traits than construction. On the other hand, agile project management is a mindset of continuously improvement and flexibility of the used working methods which can be used by the construction industry. The construction industry has to follow some specific processes such as applying for building permits and is affected by political decisions. Therefore the current project management methods are restricted to follow certain frameworks. The framework is hard to change though it leaves space for changed methods and attitudes within the framework and the design stage. All types of construction projects can use the agile mindset and it is important that the whole organization relates to the agile mindset to achieve greatest outcome. Steps towards agile can be done in current projects by emphasis more on reconciliations and let the projects progression decide the meeting structure. / Byggprocessen är en väletablerad process inom byggindustrin som byggprojekt genomgår. Genom de tydliga och historiska riktlinjerna som processen följer har byggindustrin fått anseendet att vara stel och konservativ. För att hantera byggprocessen har projektledningen följt Stage-gate modellen med tydliga delmål och beslutsgrindar. Byggprojekt är ofta komplicerade och stora vilket leder till långa beslutsvägar. När ett projekt når en grind vid ett avslut av ett delmål uppstår ofta frågor som leder till förändringar av delmålet. För att behandla förändringarna så behöver processen genomgå ett omtag, att göra om delmålet innan processen kan gå vidare till nästa delmål. Omtagen tar tid, kostar pengar och det kompromissas med funktionen. Denna uppsats har som mål att undersöka om den aktuella projektledningsmetoden kan effektiviseras genom att introducera agil projektledning i projekteringen. Uppsatsen genomförs med en kvalitativ metod. Det första steget är att finna relevant litteratur om berörda ämnen som agil projektledning, byggprocessen och förändringsledning. Med fördjupad kunskap och förståelse inom ämnena genomfördes en intervjustudie och en enkät sändes ut. Resultaten identifierades från intervjuerna och svaren från enkäten. Intervjufrågorna och resultatet är uppdelat i fyra olika agila kategorier som anses gå att applicera på byggindustrin. Kategorierna är projektplanering, mötesstruktur, gruppsamarbete och kommunikation. Resultatet följs utav diskussionen som binder samman litteraturen med resultatet och författarnas reflektioner. Därefter presenteras slutsatsen och avslutningsvis rekommenderas frågeställningar till fortsatta undersökningar. Projektledningsmetoderna som används inom byggprojekt upplevdes inte lika stela som litteraturen beskriver dock fanns det lite kunskap och medvetenhet om andra typer av projektledningsmetoder. Avsaknaden är en bidragande faktor till att den upplevda kulturen anses vara konservativ. Inom de fyra kategorierna fanns det möjligheter till att arbeta mer agilt. När projekten är tidspressade visades mest benägenhet på att förändra projektledningsmetoden. Detta kunde ses tydligt på mötesstrukturen i projekten där den var fast ifrån början men blev mer rörlig då kritiska situationer uppstod. Gruppsamarbetet fungerade bra inom projektledningen för att de var samlokaliserade och inte för stora grupper. Detta underlättade även för en fungerande kommunikation då det märktes att de som inte var samlokaliserade hade svårigheter med kommunikationen. De horisontella kommunikationsvägarna hade generellt sett svårare att fungera än de vertikala kommunikationsvägarna. Eftersom agilt inte är en standard utan är ett arbetssätt som alltid strävar efter att förbättras är det svårt att uppnå ett 100 % agilt arbetssätt. Inom byggindustrin finns vissa ramverk som ska följas vilket gör att projektledningen begränsas. Med fasta ramverk finns lite utrymme för förändring men det finns möjlighet till att förändra processen och tankesättet inom ramverket. Alla typer av byggprojekt kan därför anamma delar av agil projektledning och för att uppnå största möjliga effekt gäller det att hela organisationen är engagerad. Andra enkla steg för att arbeta mer agilt inom projektledningen är att lägga mer vikt vid avstämningsmöten och låta projektets utveckling bestämma mötesstrukturen.
54

Kommunikation och samarbete i ett byggprojekt : Hur uppfattar vi varandra? / Communication and cooperation in a construction project : How do we intrepret each other?

Edman, Robert, Lunde, Christopher January 2014 (has links)
Byggbranschen anses vara en konservativ bransch både vad gäller teknik och samarbetsformer. Det oerhörda trycket på byggbranschen och det stora antalet byggprojekt som utförs idag gör att en del komplikationer uppstår. Detta kan bl. a. bero på tidsbrist, kompetensbrist och samarbetsproblem. I vissa projekt fungerar samarbetet utmärkt mellan projektets olika parter men i allt för många projekt är samarbetet mellan parterna bristfällig. Detta kan medföra ”onödiga” ekonomiska och eller tidsmässiga konsekvenser. I samhället idag är kommunikation nyckeln till ett lyckat samarbete. Även i byggbranschen belyses kommunikation som en nyckel till ett lyckat projekt. Branschen är i ett läge där denna debatt är intressant men ännu inte riktigt kommit upp på bordet. Vårt mål med projektet är att väcka denna debatt och undersöka hur samarbetet mellan parterna egentligen fungerar, varför det fungerar/inte fungerar och hur det eventuellt kan förbättras. I examensarbetet granskas samspelet mellan de 4 aktörerna Beställare, Projektledare/Byggledare, projekterande Konsult och Entreprenör för att utreda vad som ibland skapar denna kommunikationsbrist och samarbetsproblem. Genom intervjuer och empiriska undersökningar har vi skapat oss en uppfattning om hur parterna uppfattar samarbete och kommunikation i tidigare och nuvarande projekt. Vad har de saknat? Vad tycker de fungerar? Hur skulle de vilja samarbeta och utveckla kommunikation till det bättre? Som en stöttepelare till intervjuerna har en elektronisk undersökning gjorts där 113 svar redovisats, behandlats, analyserats. De som fått tillgång till den elektroniska undersökningen är de företag där intervjuerna gjorts samt tjänstemän från ett ytterligare tiotal olika företag med varierande storlek och omsättning. Utifrån intervjuerna och den elektroniska undersökningen kan vi konstatera att den generella synen mot andra parter i ett byggprojekt är mycket god med några få reservationer. Utefter den frågeställning vi gjorde inledningsvis kan vi nu konstatera att entreprenadform har mindre betydelse för kommunikation och samarbete i ett projekt. Dock har vi kommit fram till att det existerar vissa nyckelord för att uppnå god kommunikation och ett gott samarbete i ett projekt. Nyckelorden vi har kommit fram till är: starten i ett projekt, gemensamma mål, personkemi, beslutskraft, tydlighet och kunskap. / The construction industry is considered to be a conservative industry both in technology and forms of cooperation. The immense pressure on the construction industry and the large number of construction projects that are currently being undertaken in a number of complications arise. This may be due to time constraints, skill shortages and cooperation problems. In some projects the cooperation between the project partners works very well, but in too many projects the collaboration between the parties is inadequate. This can result in "unnecessary" financial and or timing implications. In society today, communication is the key to a successful cooperation. Even in the construction industry communication are highlighted as a key to a successful project. The industry is in a position where this debate is interesting but not yet being highlighted. Our goal with this study is to bring this debate and examine how cooperation between the parties really works, why it works/does not work and how it might be improved. The thesis examines the interplay between the four actors Client, Project Manager/Construction Manager, project planning Consultant and Contractor to investigate what sometimes creates this lack of communication and cooperation problems. Through interviews and empirical studies, we have created an impression of how the parties perceive cooperation and communication in past and current projects. What have they missed? How do they work? How would they like to work together and develop communication for the better? As a mainstay of the interviews, an electronic survey carried out in which 113 responses recorded, processed, analyzed. Those who had access to the electronic survey are companies where the interviews made ​​and officers from an additional ten different companies of varying size and turnover. Based on the interviews and the electronic survey, we can conclude that the general perception to other parties on a construction project is very good with a few reservations. Along the issue we did initially, we can now conclude that the contract form is less important for communication and collaboration in a project. However, we have concluded that there are certain keywords in order to achieve good communication and good cooperation in a project. The key words we've come up with is: the start of a project, shared goals, personal chemistry, decisiveness, clarity, and knowledge.
55

En studie av småhusentreprenader : Varför går det fel?

Abdul Hakim, Faisal, Said, Shazad January 2021 (has links)
Syftet med denna studie är att kartlägga småhusentreprenader och vilka problem samt konflikter som uppstår mellan entreprenader och beställare. Vidare är det tänkt att denna studie skulle ge allmänheten en bättre uppfattning kring varför konflikter uppstår mellan beställare och entreprenörer samt hur husleverantörer jobbar för att motverka dessa problem. För att uppnå syftet och besvara forskningsfrågorna användes en kvalitativ forskningsmetod i form av semistrukturerade intervjuer. Anledningen till att denna intervjuteknik tillämpades var för att ge respondenterna frihet att prata öppet om sina upplevelser och synpunkter. Respondenterna som intervjuades var fyra representanter för husleverantörer, tre beställare, en byggnadsinspektör och en kontrollansvarig. Resultatet av intervjuerna visade att det fanns en gemensam uppfattning bland beställare och husleverantörer kring att det är för mycket pappersarbete och att totalentreprenad är den mest optimala entreprenadformen för den som inte vill ta på sigallt för mycket ansvar. Det fanns dock även åsikter som skiljde sig. Studien visade att beställare upplever uppförandet av småhus som en långsam och energikrävande process. Problemen som är vanligt förekommande inom småhusentreprenader är att det finns en skillnad i språk och kunskap mellan parterna. Detta resulterar i att det blir en bristande kommunikation som i sin tur kan leda till diverse konflikter. Husleverantörerna är medvetna om dessa problem och jobbar kontinuerligt för att ta fram lösningar. En sådan lösning är att lägga stor vikt på dokumentation och kontrakt eftersom det är de som är lagligt bindande. Slutsatsen för denna studie var att en god kommunikation resulterar i färre missförstånd och konflikter. Konflikter går däremot inte att undvika helt, utan kommer alltid kunna uppstå på grund av mänskliga faktorer. / The purpose of this study was to investigate the single-family home construction industry and what problems arise. Furthermore, it was intended that this study would give the public a better idea of why conflicts arise between customers and contractors and how home suppliers work to counteract these problems. To achieve the purpose and get answers to the research questions, we used a qualitative research method in the form of semi-structured interviews. The reason why this interview technique was applied was to give respondents the freedom to talk openly about their experiences and views. The respondents interviewed were four representatives of house suppliers, three clients, a building inspector and an inspection manager. The results of the interviews showed that there was a common opinion among clients and house suppliers on certain issues, but then there were also opinions that differed. The study showed that customers experience the construction of detached houses as a slow and energy-intensive process. The problems that are common in detached house contracts are that there is a difference in language and knowledge between the involved parties. This results in a lack of communication which in turn can lead to various conflicts. Home suppliers are aware of the problems that exist in the industry and work continuously to develop solutions. One such solution is to place great emphasis on documentation and contracts because they are the ones that are legally binding. The conclusion of this study was that good communication results in fewer misunderstandings and conflicts. Conflicts, on the other hand, cannot be completely avoided, but will always arise due to human factors.
56

Tillit i samverkansrelationer utifrån privataktörer och den offentliga sektorns perspektiv / Trust in cooperating relationships from a private and public perspective

Lind, Nora, Nero, Isabelle January 2023 (has links)
No description available.
57

Visualiseringsmediernas betydelse vid försäljning av

During, Jennifer, Fällås, Helena January 2007 (has links)
SammanfattningTitelVisualiseringsmediernas betydelse vid försäljning av nyproducerade bostäder – En studie av modeller i Virtual Reality och fullskala.Författare Jennifer During Helena FällåsSyfteDenna uppsats syftar till att utreda om modeller i Virtual Reality och fullskala kompletterar befintliga visualiseringsmedier i försäljningen av nyproducerade bostäder, genom att dessa stödtjänster skapar ökad förståelse för bostadens utformning och därmed ökar nyttan för kunden. Vidare syftar uppsatsen till att utreda hur projektsäljare och privatpersoner ställer sig till användandet av denna typ av modeller samt om kvaliteten på företagets tjänster därmed kan anses öka. MetodUppsatsen är framarbetad både med en kvalitativ och med en kvantitativ metod. Genom att göra djupintervjuer med projektsäljare på Peab Region Bostad samt med sakkunniga personer inom områdena för Virtual Reality och modeller i fullskala, har intervjupersonernas kunskaper och inställningar kunnat inhämtas. Den kvantitativa ansatsen har bestått av en enkätundersökning med avsikt att åskådliggöra vilken förståelse personer får för en bostad genom att titta på olika visualiseringsmedier. Slutsats Både modeller i Virtual Reality och fullskala ger ökad förståelse för bostadens utformning i jämförelse med ritningar. Den optimala förståelsen för bostadens utformning ges av en mix av visualiseringsmedier. Projektsäljarna och privatpersoner är överens om att modeller i Virtual Reality och fullskala skulle kunna utgöra komplement till befintliga marknadsföringsmedier, då de ger en ökad förståelse för bostadens utformning. Modeller i fullskala ger det bästa helhetsintrycket av bostadens utformning. Virtual Reality får dock anses utgöra framtidens visualiseringsmedium vad gäller att påvisa utformningen av nyproduktion. Att som företag vara tidig med att introducera en stödtjänst som ger nytta för kunden anses bidra till företagets tjänstekvalitet och ökade konkurrenskraft. Idag är det få byggföretag som kontinuerligt använder sig av modeller i Virtual Reality och fullskala i försäljningsprocessen av nyproduktion. Dock börjar aktiviteter som innefattar visualiseringsteknik att användas inom byggbranschen i marknadsföringssyfte. Detta är en tydlig indikation på att tekniken har stor potential att på allvar få genomslag i byggbranschen. / AbstractTitle The meaning of visualization methods to illustrate future house building –A study of models in Virtual Reality and full-scale.Authors Jennifer During Helena FällåsPurpose The aim of the thesis is to examine whether models in Virtual Reality and full-scale work as complement to other visualization methods, that are used today, by giving customers a better understanding of the design and interior of the future house or flat. The purpose of the essay is also to investigate the attitude towards using models in Virtual Reality and full-scale by private persons and sellers at a construction company. MethodThe methods that have been used in this thesis are both of a qualitative and quantitative character. The persons that have been interviewed are either sellers of houses and flats in a construction company or persons that have got great knowledge within the area of Virtual Reality and models in full-scale. The essay is also based on a survey in form of a questionnaire. The purpose of using this method was to get statistic data over the understanding of the design and interior of a house or flat, when using different visualization models. In addition to this the survey also compares how people understand these models comparing to the more traditional ones. Conclusion Models in both Virtual Reality and full-scale gives the user a better understanding of how the future house or flat is going to look like comparing to a drawing. The best result is given by a mix of various visualization methods, as most of them are illustrating different qualities better than others. Sellers at a construction company as well as private persons have got a positive attitude towards using models in Virtual reality and full-scale as complement to visualization methods that are being used today. The best over all impression is given by using models in full-scale. Models in Virtual Reality, however, are considered to be the future visualization method. To get an advantage over rival companies it is important to introduce new technology in an early stage. The possible benefits of this action could be that a construction company could increase the quality of the service it provides, as a result of the better understanding the costumers get of the future house or flat. Only a few companies within the property business are using models in Virtual Reality and full-scale on a regular basis in their selling process today. As models in Virtual Reality are starting to get more common, this shows its potential to become the obvious visualization method in the future.
58

Rätt från början : Att verka för användbara och tillgängliga lokaler inom hälso- och sjukvård / Right from start : To Work for Useful and Accessible Space Within Health and Care

Callert Jakobsson, Helene January 2017 (has links)
Sammanfattning Arbetsskador är ett problem inom sjukvården i Sverige. Både arbetsolyckor och framförallt arbetssjukdomar orsakade av för höga arbetsbelastningar utgör en stor andel arbetsskador hos vårdpersonal. Syftet med studien var att kartlägga och beskriva arbetet i byggprocessens byggarbetsgrupper för vård- och omsorgsbyggnader och lokaler, i vilka ergonomer och arbetsmiljöingenjörer ingår, då de kopplas in i byggprocessen. Målet var ett kunskapsunderlag som utgörs av detta examensarbete och ett samlingsdokument i appendix med metoder och relevant litteratur. Analysperspektivets grund var byggprocessen, ergonomi, metoder och samtalsmetodik. En kvalitativ undersökningsmetod användes i studien. Åtta personer med olika yrkesbakgrunder och med god erfarenhet av arbete i byggarbetsgrupper, byggfrågor och ritningsgranskning intervjuades individuellt. Resultatet pekar på att ergonomer och arbetsmiljöingenjörer är kunskapsbärarna av arbetsmiljö i byggprocesserna. Metodiken var att följa den av projektledaren uppgjorda planen för byggprocessen. De viktigaste arbetssätten och den viktigaste metoden var att skapa en god dialog och samtal, ha ett lösningsinriktat förhållningssätt samt att visualisera ritningar i byggarbetsgruppen. Deras roll i byggarbetsgruppen var att coacha och handleda framförallt brukare/vårdpersonal för att hjälpa dem att få ett tydligt beslutsunderlag för att kunna ta genomtänkta beslut. Slutsatsen tyder på att ergonomer och arbetsmiljöingenjörer är viktiga i byggprocessen i byggarbetsgrupperna för att sätta fokus på arbetsmiljöperspektivet. De behöver kopplas in i byggprocessens planeringsskeden, de tidiga skedena, för att kunna påverka utformning av framtida arbetsplatser. Medverkan av dessa två yrkesgrupper i byggprocesser, kan alltså komma vårdpersonalen/brukarna tillgodo i form av en arbetsmiljö som till stor del blir utformade efter vårdpersonalens/brukarnas krav och behov samt främjar deras hälsa och förhindrar arbetsskador. Framöver behövs en riktad utbildning för ergonomer och arbetsmiljöingenjörer som ska delta i byggprocesser. Det finns stora möjligheter för arbetsmiljöingenjörer och ergonomer att utveckla sin roll i byggprocessen till en mer framträdande sådan. Nyckelord: Ergonomer, arbetsmiljöingenjörer, byggprocessen, hälso- och sjukvårdslokaler, metoder, arbetssätt / Abstract Occupational injuries are a problem in healthcare in Sweden. Both occupational accidents and most of all occupational diseases caused by great physical workloads constitute a large proportion of work related musculoskeletal disorders (MSD) of healthcare professionals. The aim of the study was to explore and describe the work process in the design teams of the building design process. The main focus was the building design process of health care buildings and the design teams where ergonomists and safety engineers are asked to participate. The purpose was to create a knowledge base consisting of this study and an appendix with methods and relevant literature. Eight people with different professions were interview. All of them had a good hold on the building design processes and on hospital architecture issues. Among them there were two ergonomists and two safety engineers. The result indicates that ergonomists and safety engineers were those who possessed the knowledge of working environment factors such as ergonomics in the building design processes. The methodology was to follow the agreed plan for the building design process established by the project Manager. Moreover the role of the ergonomists and safety engineers in the design team was to coach and supervise particularly the healthcare professionals. The main approach was to create a good dialogue and conversation and to keep a solution-oriented approach in the design team. Furthermore the most important method was to visualize drawings of Architects which made it possible for the healthcare workers to be able to audit the drawings correctly. This procedure gave the healthcare professionals a decision-making support which helped them to make well-reasoned decisions about their future work environment. The conclusion indicates that ergonomists and safety engineers are important because of their unique knowledge of working environment, especially ergonomics. Ergonomists and safety engineers need to be involved in the early phases of the building design process in order to be able to influence the design of new workspaces. The participation of these two professions in the design team may also benefit the healthcare workers with a future work environment which is largely designed according to their requirements and needs and will probably help to prevent MSDs. In the future there is a need for a specific education just for the ergonomists and the safety engineers participating in the building design process of healthcare buildings. There are great opportunities for them to develop their role towards a more prominent one in the building design process. Keywords: Ergonomists, safety engineers, building design process, health care architecture, methods, procedures / Planering och projektering av nya arbetsmiljöer
59

Insamling, utveckling och användning av kunskap för att uppnå energikrav : En studie om AB Stockholmshems utmaningar med att uppnå Stockholms stads energikrav / Collect, develop, and use knowledge to reach energy demands

Trollsås, Rickard, Åkerblom, Andreas January 2021 (has links)
Befolkningsökningen i Stockholmsregionen är för tillfället en av de snabbaste i Europa, vilket ställer höga krav på stadsplaneringen. En effekt av urbaniseringen är att det finns ett stort behov av nyproducerade bostäder. Kommunen Stockholms stad äger aktiebolaget AB Stockholmshem, ett allmännyttigt bostadsföretag som bygger och förvaltar bostäder i Stockholm. I enlighet med FN:s globala hållbarhetsmål hållbara städer och samhällen har Stockholms stad infört ett energikrav för nyproducerade bostäder som en del av sitt arbete för att bidra till en hållbar stadsutveckling. Kravet innebär att energianvändningen för nyproducerade flerbostadshus inte får överstiga 55 kWh/m2 och år. Stockholmshem arbetar för att försöka uppnå stadens energikrav, något som i dagsläget sällan uppnås. Detta examensarbete skrivs på uppdrag av Stockholmshem och syftar till att identifiera utvecklingsområden för att hjälpa dem att uppnå stadens energikrav. Studien har forskningsfrågan; Vilka utmaningar och utvecklingsområden finns hos Stockholmshem med att samla in, sprida, utveckla och använda kunskaper som är kopplade till energiförbrukning vid nyproduktion? För att besvara forskningsfrågan användes en tematisk analys med teman kopplade till begreppet Knowledge Management, KM. KM kan ses som ett verktyg som ämnar att identifiera hur en organisation arbetar med att samla in, sprida, utveckla samt använda kunskaper inom organisationen. Tre teman kopplade till KM identifierades för att kunna analysera datan och besvara studiens frågeställning. De tre teman som användes var; infrastruktur och tillgänglighet, ledningens stöd och vision samt organisationskultur och samsyn. Data som används i den tematiska analysen kommer från elva semistrukturerade intervjuer med personer som arbetar på AB Stockholmshem.Från den tematiska analysen framkom ett flertal styrkor och några utvecklingsområden som är kopplade till KM. Kulturen att dela med sig av kunskaper kan ses som tillåtande inom företaget, men tillgängligheten kan förbättras. I nuläget beskrivs dokumenthanteringssystemet som krångligt och svåråtkomligt. Det framkom även att de kontroller som genomförs med syftet att undersöka och säkerställa energiförbrukningen behöver ses över. Antalet kontroller i genomförandefasen, standardisering av energiberäkningar och implementering av en ny mätplan kan ses som viktiga delar. De interna projekteringsanvisningarna kan anses vara Stockholmshems viktigaste verktyg för att ta vara på kunskap från tidigare projekt och medarbetare. Även om det finns en samsyn kring att energifrågan är viktig kan ledningen behöva ge tydligare direktiv om hur energifrågan ska prioriteras. Det är däremot viktigt att inte fokusera enbart på energifrågan, då det kan leda till högre ekonomiska kostnader och större miljöpåverkan. / The urbanisation in the Stockholm region is one of the fastest in Europe right now. The municipality Stockholm stad owns AB Stockholmshem, which is a public utility housing association that builds and manages buildings in Stockholm. In compliance with the UN:s sustainable development goal sustainable cities and societies has Stockholm stad introduced an energy efficiency demand when building new buildings as a part of their work toward a more sustainable city development. The demand for new apartment buildings is set so that the energy efficiency is not allowed to be greater than 55 kWh/m2 and year. Stockholmshem works in order to fulfill the demand, but today that rarely happens. This master thesis is an assignment from Stockholmshem that have been adapted according to guidelines for master thesis that exist for the Master of Science in Engineering and in Education at the KTH Royal Institute of Technology. The assignment aims to identify development areas that can help them achieve the energy efficiency demand in the future. The study has the research question; What challenges and development areas can be found in Stockholmshem regarding their work with collecting, spreading, developing, and using knowledge that is connected to energy efficiency in new apartment buildings? In order to answer the research question a thematic analysis was used, with themes connected to the term Knowledge Management, KM. KM can be seen as a tool that aims to identify how an organization works with collecting, spreading, developing and using knowledge within the organization. Three themes were identified that are connected to KM and were used in the analysis of the data in order to answer the research question. The three themes were infrastructure and accessibility, the management's support and vision and also organisational culture and consensus. The data used in the thematic analysis were collected through eleven semi structured interviews with employees at AB Stockholmshem. The thematic analysis with data from the interviews identified strengths and development areas connected to KM. The culture can be seen as allowing and good, but the accessibility can be improved. The document management system that is used today is described as difficult and hard to access. The interviews also lifted that the controls that are implemented to verify that the calculated energy efficiency becomes the actual value in the end needs to be reviewed. The number of controls in the building phase, standardization of energy calculations and implementation of a new measurement plan were lifted as important aspects. The projecting instructions could be seen as the most important tool for Stockholmshem when transferring knowledge from older projects and coworkers to new. Even if there is a consensus regarding the energy issue the management could give more clear guidelines regarding how the energy issue should be prioritized. But it is important to not only focus on the energy issue since that could lead to higher economic costs and greater environmental impact.
60

Byggnadskonstruktörens möjligheter att påverka valet av trä som stommaterial / The structural engineers possibilities to influence the choice of wood as frame material

Cefalk, Rickard, Wetterö, Alva January 2024 (has links)
Syfte - I Sverige står bygg- och fastighetssektorn för cirka en femtedel av de totala växthusgasutsläppen. Detta är ett problem och det är bråttom med åtgärder och lösningar om Sverige ska kunna nå sina klimatmål att år 2045 inte ha några nettoutsläpp av växthusgaser. Tillverkning av byggmaterial är en av de mest bidragande orsakerna för branschens utsläpp. Det finns fler än ett sätt att tackla denna utmaning på, men genom att titta på en byggnads mest klimatpåverkande delar, är den största möjligheten att minska en byggnads klimatpåverkan genom att se över valet av stommaterial. Trots detta byggs fortfarande cirka 80 procent av alla flerbostadshus med betongstomme kontra 14 procent med trä. Det är bevisat att en ökning av användandet av trä skulle kunna sänka koldioxidutsläppen avsevärt. I denna studie undersöks byggnadskonstruktörens möjligheter att påverka valet av stommaterial genom att identifiera i vilket skede beslut tas, vilka de beslutsgrundande faktorerna är och vilka möjligheter och utmaningar som byggnadskonstruktörer upplever påverkar deras inflytande. Metod - Undersökningen är en fallstudie med kvalitativ inriktning där intervjuer och dokumentstudie valdes som datainsamlingstekniker. Intervjuerna genomfördes med beställare, projektledare och byggnadskonstruktörer som varit eller är delaktiga i projekt där korslimmat och/eller limträ ingår som konstruktionselement. Dokumentstudien genomfördes på förfrågningsunderlag som syftade till att komplettera studiens mål. Resultat och analys – Kunskapen om trä som stommaterial anses relativt låg. Flera respondenter har mest kunskap inom betong och stål. Vetskapen om hållbart byggande är stor, men det är svårare att realisera det i praktiken. Beslut om stommaterial tas oftast i förstudien eller programskedet. Beställaren har störst inflytande i valet av stommaterial och den ekonomiska faktorn är vanligtvis avgörande. Byggnadskonstruktörens möjligheter att påverka är goda men begränsade och varierar beroende på entreprenadform, projekt och beror även på i vilket skede som konstruktören involveras. För att ge konstruktören ett större inflytande i valet av stommaterial visar resultatet att det krävs högre miljökrav, men även fler politiska initiativ. Diskussion – Resultatet går i linje med tidigare forskning och studiens teoretiska ramverk. Det är träets klimatfördelar som har störst positiv påverkan på användningen av trä men resultatet visar att kostnad är den mest avgörande faktorn. Teorier visar att utmaningar med fukt, brand, akustik och kunskapsbrist bromsar användningen av trä, vilket denna studie samstämmer med. Resultatet går i linje med teorier som belyser att ingenjörer har relativt lågt inflytande i byggvärdekedjan. Beställare och entreprenörer har störst inflytande. Byggnadskonstruktörens möjligheter att påverka är därför begränsade och varierar beroende på entreprenadform och projekt. Teorierna stärker att det krävs högre miljökrav för att gynna användningen av trä. / Purpose – In Sweden, the construction and real estate sector accounts for around one fifth of the total greenhouse gas emissions. This is a problem and requires urgent action and solutions if Sweden is to meet its climate targets of zero net greenhouse gas emissions by 2045. The production of building materials is one of the main contributors to the industry’s emission. There is more than one way to approach this challenge, but by looking at the most climate-impacting parts of a building, it shows that the biggest opportunity to reduce a building’s climate impact is to review the choice of frame material. Despite this, around 80 percent of apartment buildings are still built with a concrete frame and only 14 percent with wood, which has been proven to significantly reduce carbon emissions. This study aims to examine the structural engineer’s ability to influence the choice of frame material by identifying the stage at which decisions are made, what the decision-making factors are, and what opportunities and challenges structural engineers experience that affect their influence. Method – The study is a case-study with qualitative focus where interviews and document study were chosen as data collection techniques. The interviews were conducted with client, project managers and structural engineers who have been or are involved in projects where cross laminated timber and/or glulam are included as structural elements. The document study was carried out on tender documents and aimed to complement the objectives of the study. Results and analysis – Knowledge of wood as a structural material is considered relatively low. Several respondents have most knowledge of concrete and steel. The awareness of sustainable building is high but is considered difficult to put to practice. Results show that decisions on frame materials are usually made in the pre-study or program phase. The client has the greatest influence and role in the choice of frame material and results show that the cost is decisive. The structural engineer’s opportunities to influence are good but limited and vary depending on the type of contract, project and the stage at which the engineer is involved. To give the structural engineer more influence in the choice of frame materials, the results show that more sustainability requirements and political initiatives are needed. Discussion – The results are in line with previous research and the theoretical framework of the study. The climate benefits of wood have the greatest positive impact on the use of wood, while the results show that cost is the biggest obstacle. Theories show that challenges with moisture, fire, acoustics and lack of knowledge slow down the use of wood, which this study agrees with. Results are in line with theories that highlight that engineers have relatively low influence in the construction value chain. Clients and contractors have the greatest influence. The structural engineer’s opportunities to influence are therefore limited and vary depending on the type of contract and project. According to respondents, more sustainability requirements and political initiatives are needed to increase the use of wood and the structural engineers influence in the choice of materials – which is supported by the theory.

Page generated in 0.0705 seconds