1 |
Leading a church through a building program how to shepherd a church biblically through a building program /Dickerson, M. Daniel. January 1998 (has links)
Thesis (D.S.M.)--Northland Baptist Bible College, 1998. / Includes bibliographical references (leaves 340-344).
|
2 |
Preparing the worship community of First Covenant Church, Oakland, California, to embrace a new physical worship environment plan to foster greater participation in worship and to engage more fully with GodLeestma, David. January 2005 (has links)
Thesis (D.W.S.)--Institute for Worship Studies, 2005. / Abstract. Includes bibliographical references (leaves 116-119).
|
3 |
Deagil Presbyterian Church renovation another opportunity at a crisis, as a traditional church in Korea /Park, Hyun Sik. January 2000 (has links)
Thesis (D. Min.)--Liberty Baptist Theological Seminary, 2000. / Includes bibliographical references.
|
4 |
Preparing the worship community of First Covenant Church, Oakland, California, to embrace a new physical worship environment plan to foster greater participation in worship and to engage more fully with GodLeestma, David. January 1900 (has links)
Thesis (D.W.S.)--Institute for Worship Studies, 2005. / Abstract. Includes bibliographical references (leaves 116-119).
|
Page generated in 0.0883 seconds