• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 10
  • 2
  • 1
  • Tagged with
  • 13
  • 13
  • 10
  • 6
  • 6
  • 5
  • 5
  • 5
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Aplicação de tecnologia wireless para controle de qualidade do planejamento de lavra incorporando a incerteza geológica. / Wireless technology application for quality control on mining planning incorporating geologic uncertainty.

Silva, Rondinelli de Sousa 06 October 2006 (has links)
As etapas envolvidas na produção de uma mina podem ser modeladas e gerenciadas de forma mais eficiente quando há um fluxo mútuo e contínuo de informações, que vão desde a geologia até às especificações do produto final. Através da modelagem e gerenciamento das diversas etapas envolvidas no processo mineiro é possível melhorar significativamente o planejamento e operação das minas. A incorporação de componentes tecnológicos diversos tais como software de mineração, software de realidade virtual e componentes wireless, permite tomar decisões baseadas em modelos mais realísticos e precisos. Para tal, é proposta uma metodologia de integração destas tecnologias no controle das tarefas de decapeamento no planejamento de lavra de curto prazo, visando aprimorar o controle de qualidade no minério lavrado através do uso de técnicas de simulação condicional. A integração dessas tecnologias permite a transmissão de dados em tempo real entre planejamento e operação de mina, proporcionando melhorias na produtividade, na eficiência e no controle dos processos, além de promover melhorias na qualidade do material lavrado através do conhecimento do nível de incerteza associado em cada plano operacional de lavra. Uma solução composta por tecnologias integradas permite que o pessoal de operação de mina alcance os resultados de forma mais rápida e eficiente, melhorando significativamente a produtividade das operações da mina e a qualidade do minério lavrado. / The stages involved in mining production can be modeled and managed in a more efficient way when there is an integrated and continuous flow of information, from geology all the way down the mine value chain to the final specifications of the product. It is possible to improve the efficiency of decision-making in mine planning and operations through proper data-flow management. With the incorporation of technological components such as mining software, virtual reality software and wireless components, it is possible to take decisions based on models that are more accurate and realistic. This research considers a methodology technology integration for the tasks of waste moving in the short term mine planning, to improve the quality control in mined ore using conditional simulation techniques. The integration of these technologies allows instantaneous transmission of data between mine planning and the mine operation, improving productivity and efficiency in process control. In addition, it provides a measure of the uncertainty associated with the operational mining planning. An integrated solution allows mine planners and equipment operators to obtain quicker and more efficient results, improving significantly productivity in the operation of the mine and quality of the mined ore.
2

Simulação geoestatística utilizando múltiplos passeios aleatórios

Caixeta, Rafael Moniz January 2015 (has links)
Simulação geoestatística compreende uma variedade de técnicas que permitem gerar cenários que reproduzem a continuidade espacial e o histograma do fenômeno de interesse. Essas técnicas podem ser usadas para ajudar nas tomadas de decisões, permitindo um acesso à incerteza nas funções de resposta (que dependem dos cenários simulados), geralmente por meio de uma relação não-linear (retorno financeiro, recuperação geometalúrgica...). No entanto, uma de suas limitações é que as simulações podem demandar um tempo considerável para serem executadas em grandes depósitos. E a motivação dessa dissertação se concentra justamente nesse fato, buscando uma alternativa para acelerar o processamento computacional dessas simulações. A opção escolhida para isso foi desenvolver a Simulação via Múltiplos Passeios Aleatórios, que é uma nova abordagem para se realizar simulações geoestatística. Ela combina a krigagem com a simulação de passeios aleatórios independentes, de modo a gerar cenários simulados de uma maneira mais rápida que os algoritmos tradicionais. Essa dissertação apresenta detalhes do método e importantes contribuições desenvolvidas para melhorar o desempenho e a qualidade dos resultados gerados com o método. Foi também desenvolvido um software específico para possibilitar um uso simples, prático e rápido da técnica em qualquer situação (2D ou 3D). Estudos de caso foram feitos para checar a validade das simulações, que demonstraram boa reprodução dos histogramas e variogramas, além de um ganho de velocidade considerável, alcançando uma aceleração de até 5,65 x (em comparação com a Simulação por Bandas Rotativas) na simulação de um depósito de ferro em 3D, desempenho que pode ser melhor ainda à medida que mais dados amostrais estão disponíveis. / Geostatistical simulation comprises a variety of techniques, which allow the generation of multiple scenarios reproducing the spatial continuity and the histogram of the desired phenomenon (grades for instance). These methods can be used in the decision making process, allowing the assess to the uncertainty of functions responses (which depend on the simulated inputs) commonly through a non-linear relationship (net present value, interest tax return, ore geometallurgical recovery…). However, one of their limitations is that running simulation can take a considerable processing time to be executed in large deposits or large grids. Therefore, the motivation of this dissertation focuses on this fact, leading to the main goal, i.e. investigating an alternative to accelerate the simulation process. The option chosen is based on the development and adaptation of the Multiple Random Walk Simulation, which is algorithm to build geostatistical simulations. It combines kriging with the simulation of independent random walks in order to generate simulated scenarios faster than via traditional simulation algorithms. This dissertation presents details of the method and new important contributions developed to improve its performance and statistics reproduction. An algorithm and software was also presented in order to allow a simple, practical and fast use of the method in any condition (2D or 3D). Case studies were developed to check the validity of the simulations, which showed good reproduction of histogram and variograms, in addition to a considerable speed gain, achieving an acceleration up to 5.65 x (in comparison with Turning Bands Simulation) in the simulation of a 3D iron deposit, performance that can be enhanced as more conditioning samples are available.
3

Simulação geoestatística utilizando múltiplos passeios aleatórios

Caixeta, Rafael Moniz January 2015 (has links)
Simulação geoestatística compreende uma variedade de técnicas que permitem gerar cenários que reproduzem a continuidade espacial e o histograma do fenômeno de interesse. Essas técnicas podem ser usadas para ajudar nas tomadas de decisões, permitindo um acesso à incerteza nas funções de resposta (que dependem dos cenários simulados), geralmente por meio de uma relação não-linear (retorno financeiro, recuperação geometalúrgica...). No entanto, uma de suas limitações é que as simulações podem demandar um tempo considerável para serem executadas em grandes depósitos. E a motivação dessa dissertação se concentra justamente nesse fato, buscando uma alternativa para acelerar o processamento computacional dessas simulações. A opção escolhida para isso foi desenvolver a Simulação via Múltiplos Passeios Aleatórios, que é uma nova abordagem para se realizar simulações geoestatística. Ela combina a krigagem com a simulação de passeios aleatórios independentes, de modo a gerar cenários simulados de uma maneira mais rápida que os algoritmos tradicionais. Essa dissertação apresenta detalhes do método e importantes contribuições desenvolvidas para melhorar o desempenho e a qualidade dos resultados gerados com o método. Foi também desenvolvido um software específico para possibilitar um uso simples, prático e rápido da técnica em qualquer situação (2D ou 3D). Estudos de caso foram feitos para checar a validade das simulações, que demonstraram boa reprodução dos histogramas e variogramas, além de um ganho de velocidade considerável, alcançando uma aceleração de até 5,65 x (em comparação com a Simulação por Bandas Rotativas) na simulação de um depósito de ferro em 3D, desempenho que pode ser melhor ainda à medida que mais dados amostrais estão disponíveis. / Geostatistical simulation comprises a variety of techniques, which allow the generation of multiple scenarios reproducing the spatial continuity and the histogram of the desired phenomenon (grades for instance). These methods can be used in the decision making process, allowing the assess to the uncertainty of functions responses (which depend on the simulated inputs) commonly through a non-linear relationship (net present value, interest tax return, ore geometallurgical recovery…). However, one of their limitations is that running simulation can take a considerable processing time to be executed in large deposits or large grids. Therefore, the motivation of this dissertation focuses on this fact, leading to the main goal, i.e. investigating an alternative to accelerate the simulation process. The option chosen is based on the development and adaptation of the Multiple Random Walk Simulation, which is algorithm to build geostatistical simulations. It combines kriging with the simulation of independent random walks in order to generate simulated scenarios faster than via traditional simulation algorithms. This dissertation presents details of the method and new important contributions developed to improve its performance and statistics reproduction. An algorithm and software was also presented in order to allow a simple, practical and fast use of the method in any condition (2D or 3D). Case studies were developed to check the validity of the simulations, which showed good reproduction of histogram and variograms, in addition to a considerable speed gain, achieving an acceleration up to 5.65 x (in comparison with Turning Bands Simulation) in the simulation of a 3D iron deposit, performance that can be enhanced as more conditioning samples are available.
4

Simulação geoestatística utilizando múltiplos passeios aleatórios

Caixeta, Rafael Moniz January 2015 (has links)
Simulação geoestatística compreende uma variedade de técnicas que permitem gerar cenários que reproduzem a continuidade espacial e o histograma do fenômeno de interesse. Essas técnicas podem ser usadas para ajudar nas tomadas de decisões, permitindo um acesso à incerteza nas funções de resposta (que dependem dos cenários simulados), geralmente por meio de uma relação não-linear (retorno financeiro, recuperação geometalúrgica...). No entanto, uma de suas limitações é que as simulações podem demandar um tempo considerável para serem executadas em grandes depósitos. E a motivação dessa dissertação se concentra justamente nesse fato, buscando uma alternativa para acelerar o processamento computacional dessas simulações. A opção escolhida para isso foi desenvolver a Simulação via Múltiplos Passeios Aleatórios, que é uma nova abordagem para se realizar simulações geoestatística. Ela combina a krigagem com a simulação de passeios aleatórios independentes, de modo a gerar cenários simulados de uma maneira mais rápida que os algoritmos tradicionais. Essa dissertação apresenta detalhes do método e importantes contribuições desenvolvidas para melhorar o desempenho e a qualidade dos resultados gerados com o método. Foi também desenvolvido um software específico para possibilitar um uso simples, prático e rápido da técnica em qualquer situação (2D ou 3D). Estudos de caso foram feitos para checar a validade das simulações, que demonstraram boa reprodução dos histogramas e variogramas, além de um ganho de velocidade considerável, alcançando uma aceleração de até 5,65 x (em comparação com a Simulação por Bandas Rotativas) na simulação de um depósito de ferro em 3D, desempenho que pode ser melhor ainda à medida que mais dados amostrais estão disponíveis. / Geostatistical simulation comprises a variety of techniques, which allow the generation of multiple scenarios reproducing the spatial continuity and the histogram of the desired phenomenon (grades for instance). These methods can be used in the decision making process, allowing the assess to the uncertainty of functions responses (which depend on the simulated inputs) commonly through a non-linear relationship (net present value, interest tax return, ore geometallurgical recovery…). However, one of their limitations is that running simulation can take a considerable processing time to be executed in large deposits or large grids. Therefore, the motivation of this dissertation focuses on this fact, leading to the main goal, i.e. investigating an alternative to accelerate the simulation process. The option chosen is based on the development and adaptation of the Multiple Random Walk Simulation, which is algorithm to build geostatistical simulations. It combines kriging with the simulation of independent random walks in order to generate simulated scenarios faster than via traditional simulation algorithms. This dissertation presents details of the method and new important contributions developed to improve its performance and statistics reproduction. An algorithm and software was also presented in order to allow a simple, practical and fast use of the method in any condition (2D or 3D). Case studies were developed to check the validity of the simulations, which showed good reproduction of histogram and variograms, in addition to a considerable speed gain, achieving an acceleration up to 5.65 x (in comparison with Turning Bands Simulation) in the simulation of a 3D iron deposit, performance that can be enhanced as more conditioning samples are available.
5

Aplicação de tecnologia wireless para controle de qualidade do planejamento de lavra incorporando a incerteza geológica. / Wireless technology application for quality control on mining planning incorporating geologic uncertainty.

Rondinelli de Sousa Silva 06 October 2006 (has links)
As etapas envolvidas na produção de uma mina podem ser modeladas e gerenciadas de forma mais eficiente quando há um fluxo mútuo e contínuo de informações, que vão desde a geologia até às especificações do produto final. Através da modelagem e gerenciamento das diversas etapas envolvidas no processo mineiro é possível melhorar significativamente o planejamento e operação das minas. A incorporação de componentes tecnológicos diversos tais como software de mineração, software de realidade virtual e componentes wireless, permite tomar decisões baseadas em modelos mais realísticos e precisos. Para tal, é proposta uma metodologia de integração destas tecnologias no controle das tarefas de decapeamento no planejamento de lavra de curto prazo, visando aprimorar o controle de qualidade no minério lavrado através do uso de técnicas de simulação condicional. A integração dessas tecnologias permite a transmissão de dados em tempo real entre planejamento e operação de mina, proporcionando melhorias na produtividade, na eficiência e no controle dos processos, além de promover melhorias na qualidade do material lavrado através do conhecimento do nível de incerteza associado em cada plano operacional de lavra. Uma solução composta por tecnologias integradas permite que o pessoal de operação de mina alcance os resultados de forma mais rápida e eficiente, melhorando significativamente a produtividade das operações da mina e a qualidade do minério lavrado. / The stages involved in mining production can be modeled and managed in a more efficient way when there is an integrated and continuous flow of information, from geology all the way down the mine value chain to the final specifications of the product. It is possible to improve the efficiency of decision-making in mine planning and operations through proper data-flow management. With the incorporation of technological components such as mining software, virtual reality software and wireless components, it is possible to take decisions based on models that are more accurate and realistic. This research considers a methodology technology integration for the tasks of waste moving in the short term mine planning, to improve the quality control in mined ore using conditional simulation techniques. The integration of these technologies allows instantaneous transmission of data between mine planning and the mine operation, improving productivity and efficiency in process control. In addition, it provides a measure of the uncertainty associated with the operational mining planning. An integrated solution allows mine planners and equipment operators to obtain quicker and more efficient results, improving significantly productivity in the operation of the mine and quality of the mined ore.
6

Análise de incertezas do modelo de teores associado aos investimentos de pesquisa de longo prazo / Uncertainty analyses of grade models related with long term resources

Ferreira, Talita Cristina de Oliveira 31 March 2016 (has links)
Os empreendimentos de mineração comumente demandam grande quantidade de investimentos financeiros e, na maioria das vezes, longos períodos de implantação, o que os torna altamente sujeitos a diversas fontes de incertezas. Tais incertezas comumente tendem a diminuir conforme a evolução do projeto. O objetivo deste estudo é correlacionar as incertezas associadas ao modelo de teores de cobre do depósito Sequeirinho com o volume de investimentos realizados ao longo de distintas fases da pesquisa geológica. Este depósito insere-se no contexto do Complexo de Mineração Sossego, localizado no município de Canaã dos Carajás (PA). Primeiramente, foram realizadas 100 simulações para cada domínio litológico em cada campanha de sondagem (pré-1998, 1999, 2000, 2002 e 2003) a partir do método de simulação sequencial gaussiana condicionada aos dados amostrais, totalizando 1.400 possíveis cenários. Para a avaliação das incertezas foram calculados três índices: variância condicional, coeficiente de variação condicional e intervalo interquartil. Por fim, a avaliação dos investimentos foi elaborada a partir dos custos estimados para o desenvolvimento de sondagens e análises químicas. Desde a campanha pré-1998, houve uma tendência de os teores médios do depósito aproximarem-se dos prováveis valores reais observados nas fases finais da pesquisa. No ano de 2000 ocorreu o maior investimento (cerca de 28 milhões de Reais) e a redução das incertezas atingiu o patamar de 15%. Os investimentos desenvolvidos em sondagens posteriores à campanha de 2000 foram da ordem de 9 milhões de Reais (cerca de 12 mil metros de sondagem), porém, não foram constatadas reduções significativas das incertezas. Este investimento seria melhor aproveitado caso fosse redirecionado a novas áreas de prospecção. Além do montante financeiro necessário para a redução das incertezas, foco deste estudo, as variações na interpretação geológica e a locação dos furos de sondagem são variáveis importantes na análise de incertezas associadas aos investimentos em pesquisa geológica. / Mining projects require large amount of capital investment and most cases spend long periods of implementation, which make them extremely susceptible to several sources of uncertainty. Such uncertainties commonly tend to decrease along the project development. The present study aims to correlate the uncertainties associated to the grade model of the Sequeirinho copper mine with the amount of capital investment that has been spent along different geological surveys. Sequeirinho site is included in the context of Sossego Mine Complex, located in Canaã dos Carajás (PA, Brazil). Initially, 100 simulations were carried out for each lithologic domain in each drilling campaign (pre-1998, 1999, 2000, 2002 and 2003) using sequential Gaussian simulation conditioned to the sample, resulting in 1,400 possible scenarios. Three indexes were calculated for the uncertainty analysis: conditional variance, conditional coefficient variance and interquartile range. Finally, the evaluation of capital investment was elaborated from the costs estimated for drilling and chemical analysis. Since pre-1998 drilling campaign, deposit average grades have showed a trend to get closer to the possible real values observed in the final research surveys. In 2000, there was the biggest capital investment (about R$ 28 millions) and the uncertainty reduction has reached the maximum level of 15%. Investments performed in drilling programs after 2000 were around R$ 9 million (around 12,000 meters of drill holes), but the uncertainty reduction was not significant. Therefore, such investments might be used to discover new targets. Besides the correlation of uncertainty reduction and amount of capital investment, the main focus of this study, the uncertainty of geological model and the drillhole locations are important variables to be considered in investment analysis of geological survey.
7

Análise de incertezas do modelo de teores associado aos investimentos de pesquisa de longo prazo / Uncertainty analyses of grade models related with long term resources

Talita Cristina de Oliveira Ferreira 31 March 2016 (has links)
Os empreendimentos de mineração comumente demandam grande quantidade de investimentos financeiros e, na maioria das vezes, longos períodos de implantação, o que os torna altamente sujeitos a diversas fontes de incertezas. Tais incertezas comumente tendem a diminuir conforme a evolução do projeto. O objetivo deste estudo é correlacionar as incertezas associadas ao modelo de teores de cobre do depósito Sequeirinho com o volume de investimentos realizados ao longo de distintas fases da pesquisa geológica. Este depósito insere-se no contexto do Complexo de Mineração Sossego, localizado no município de Canaã dos Carajás (PA). Primeiramente, foram realizadas 100 simulações para cada domínio litológico em cada campanha de sondagem (pré-1998, 1999, 2000, 2002 e 2003) a partir do método de simulação sequencial gaussiana condicionada aos dados amostrais, totalizando 1.400 possíveis cenários. Para a avaliação das incertezas foram calculados três índices: variância condicional, coeficiente de variação condicional e intervalo interquartil. Por fim, a avaliação dos investimentos foi elaborada a partir dos custos estimados para o desenvolvimento de sondagens e análises químicas. Desde a campanha pré-1998, houve uma tendência de os teores médios do depósito aproximarem-se dos prováveis valores reais observados nas fases finais da pesquisa. No ano de 2000 ocorreu o maior investimento (cerca de 28 milhões de Reais) e a redução das incertezas atingiu o patamar de 15%. Os investimentos desenvolvidos em sondagens posteriores à campanha de 2000 foram da ordem de 9 milhões de Reais (cerca de 12 mil metros de sondagem), porém, não foram constatadas reduções significativas das incertezas. Este investimento seria melhor aproveitado caso fosse redirecionado a novas áreas de prospecção. Além do montante financeiro necessário para a redução das incertezas, foco deste estudo, as variações na interpretação geológica e a locação dos furos de sondagem são variáveis importantes na análise de incertezas associadas aos investimentos em pesquisa geológica. / Mining projects require large amount of capital investment and most cases spend long periods of implementation, which make them extremely susceptible to several sources of uncertainty. Such uncertainties commonly tend to decrease along the project development. The present study aims to correlate the uncertainties associated to the grade model of the Sequeirinho copper mine with the amount of capital investment that has been spent along different geological surveys. Sequeirinho site is included in the context of Sossego Mine Complex, located in Canaã dos Carajás (PA, Brazil). Initially, 100 simulations were carried out for each lithologic domain in each drilling campaign (pre-1998, 1999, 2000, 2002 and 2003) using sequential Gaussian simulation conditioned to the sample, resulting in 1,400 possible scenarios. Three indexes were calculated for the uncertainty analysis: conditional variance, conditional coefficient variance and interquartile range. Finally, the evaluation of capital investment was elaborated from the costs estimated for drilling and chemical analysis. Since pre-1998 drilling campaign, deposit average grades have showed a trend to get closer to the possible real values observed in the final research surveys. In 2000, there was the biggest capital investment (about R$ 28 millions) and the uncertainty reduction has reached the maximum level of 15%. Investments performed in drilling programs after 2000 were around R$ 9 million (around 12,000 meters of drill holes), but the uncertainty reduction was not significant. Therefore, such investments might be used to discover new targets. Besides the correlation of uncertainty reduction and amount of capital investment, the main focus of this study, the uncertainty of geological model and the drillhole locations are important variables to be considered in investment analysis of geological survey.
8

Incorporação da variabilidade dos teores para análise de risco de recursos minerais e sequenciamento de lavra

Diedrich, Cássio January 2012 (has links)
A indústria de mineração investiga continuamente processos de reconciliação e técnicas adequadas para mapear possíveis riscos na recuperação do minério e no planejamento de lavra. Um estudo de caso em uma mina de cobre brasileira investiga a adequação do uso de teores simulados para a definição de áreas de risco que afetam o planejamento mineiro e as reservas minerais definidas. Simulações condicionais foram usadas para derivar múltiplos modelos de teores de cobre dentro de um típico corpo de minério do depósito e esses modelos foram comparados com os dados reais de produção (reconciliação). A comparação permitiu uma melhor compreensão sobre a variabilidade da qualidade e ajudou na definição de um plano de produção mais consistente. Com os intervalos de valores provenientes das simulações foi possível mapear importantes áreas de incerteza que afetam o plano de lavra. Análises de risco foram conduzidas para a definição da cava final através da comparação do limite previsto pela estimativa por krigagem ordinária e as cavas resultantes dos modelos simulados de teor de cobre, sendo possível avaliar os impactos operacionais nos principais fatores econômicos (valor presente líquido e fluxo de caixa descontado). Várias cavas finais foram geradas para vários modelos de blocos simulados, comparando-se com a cava anteriormente planejada através da utilização do modelo de blocos produzido pela krigagem ordinária. Além disso, foi definida uma escala de risco utilizando os modelos condicionalmente simulados e os valores estimados pela krigagem (comumente utilizados como referência para definição do orçamento e da alimentação de metal no moinho) a fim de minimizar as variações dos teores. Estas medidas se propõem a reduzir o risco no cumprimento das metas de produção de metal no planejamento de lavra. Esta abordagem, considerando o risco durante o sequenciamento de lavra, foi utilizada no plano de produção anual da mina e comparada com o realizado no período e com a abordagem tradicionalmente aplicada. Os resultados evidenciaram possíveis riscos associados com o limite da cava final operacional e demonstraram os benefícios do uso de análise de risco como uma ferramenta para visualizar e analisar os limites de cava final e planejamento de lavra, ajudando a tomar melhores decisões estratégicas no gerenciamento da mina referente aos fatores técnicos e indicadores econômicos. / Mining industry continuously investigates proper reconciliation procedures and techniques for mapping possible risks in ore recovery and mine planning. A case study at a Brazilian copper mine investigates the adequacy of using simulated grades for defining high risk areas affecting mine planning and the defined mineral reserves. Conditional simulations were used to derive multiple copper grade models within a typical ore-body of the deposit and compared these models against the real production data (reconciliation). The comparison allowed a better understanding of grade variability and helped in defining a more consistent mine plan. The range of values derived from the simulations mapped areas of significant uncertainty affecting the pushback’s plan. Risk analysis were conducted for the final pit definition by comparing the projected final pit limit and mining sequence against the simulated models of copper grade, assessing the operational impacts on key economical factors (mine net present value, discounted cash flow). Several final pit limits were generated for various simulated grade block models and compared to the previously pit planned using the ordinary kriging grade block model. Also, it was defined a risk scale using the conditional simulated models and the ordinary kriged values (commonly used for budget and mill feed reference) in order to minimize grade variations ensuring less risk on completion of the metal production goals on mine planning. This approach considering the risk for the mining sequencing was used on the annual mining plan and compared to the real production and to the traditional approach. The results highlighted possible risks associated with the operational pit limit and demonstrated the benefits of using risk analysis as a tool to preview and review the final pit limits and mine planning, helping to make better strategic decisions by the copper mine management related to the technical factors and economical indicators.
9

Incorporação da variabilidade dos teores para análise de risco de recursos minerais e sequenciamento de lavra

Diedrich, Cássio January 2012 (has links)
A indústria de mineração investiga continuamente processos de reconciliação e técnicas adequadas para mapear possíveis riscos na recuperação do minério e no planejamento de lavra. Um estudo de caso em uma mina de cobre brasileira investiga a adequação do uso de teores simulados para a definição de áreas de risco que afetam o planejamento mineiro e as reservas minerais definidas. Simulações condicionais foram usadas para derivar múltiplos modelos de teores de cobre dentro de um típico corpo de minério do depósito e esses modelos foram comparados com os dados reais de produção (reconciliação). A comparação permitiu uma melhor compreensão sobre a variabilidade da qualidade e ajudou na definição de um plano de produção mais consistente. Com os intervalos de valores provenientes das simulações foi possível mapear importantes áreas de incerteza que afetam o plano de lavra. Análises de risco foram conduzidas para a definição da cava final através da comparação do limite previsto pela estimativa por krigagem ordinária e as cavas resultantes dos modelos simulados de teor de cobre, sendo possível avaliar os impactos operacionais nos principais fatores econômicos (valor presente líquido e fluxo de caixa descontado). Várias cavas finais foram geradas para vários modelos de blocos simulados, comparando-se com a cava anteriormente planejada através da utilização do modelo de blocos produzido pela krigagem ordinária. Além disso, foi definida uma escala de risco utilizando os modelos condicionalmente simulados e os valores estimados pela krigagem (comumente utilizados como referência para definição do orçamento e da alimentação de metal no moinho) a fim de minimizar as variações dos teores. Estas medidas se propõem a reduzir o risco no cumprimento das metas de produção de metal no planejamento de lavra. Esta abordagem, considerando o risco durante o sequenciamento de lavra, foi utilizada no plano de produção anual da mina e comparada com o realizado no período e com a abordagem tradicionalmente aplicada. Os resultados evidenciaram possíveis riscos associados com o limite da cava final operacional e demonstraram os benefícios do uso de análise de risco como uma ferramenta para visualizar e analisar os limites de cava final e planejamento de lavra, ajudando a tomar melhores decisões estratégicas no gerenciamento da mina referente aos fatores técnicos e indicadores econômicos. / Mining industry continuously investigates proper reconciliation procedures and techniques for mapping possible risks in ore recovery and mine planning. A case study at a Brazilian copper mine investigates the adequacy of using simulated grades for defining high risk areas affecting mine planning and the defined mineral reserves. Conditional simulations were used to derive multiple copper grade models within a typical ore-body of the deposit and compared these models against the real production data (reconciliation). The comparison allowed a better understanding of grade variability and helped in defining a more consistent mine plan. The range of values derived from the simulations mapped areas of significant uncertainty affecting the pushback’s plan. Risk analysis were conducted for the final pit definition by comparing the projected final pit limit and mining sequence against the simulated models of copper grade, assessing the operational impacts on key economical factors (mine net present value, discounted cash flow). Several final pit limits were generated for various simulated grade block models and compared to the previously pit planned using the ordinary kriging grade block model. Also, it was defined a risk scale using the conditional simulated models and the ordinary kriged values (commonly used for budget and mill feed reference) in order to minimize grade variations ensuring less risk on completion of the metal production goals on mine planning. This approach considering the risk for the mining sequencing was used on the annual mining plan and compared to the real production and to the traditional approach. The results highlighted possible risks associated with the operational pit limit and demonstrated the benefits of using risk analysis as a tool to preview and review the final pit limits and mine planning, helping to make better strategic decisions by the copper mine management related to the technical factors and economical indicators.
10

Incorporação da variabilidade dos teores para análise de risco de recursos minerais e sequenciamento de lavra

Diedrich, Cássio January 2012 (has links)
A indústria de mineração investiga continuamente processos de reconciliação e técnicas adequadas para mapear possíveis riscos na recuperação do minério e no planejamento de lavra. Um estudo de caso em uma mina de cobre brasileira investiga a adequação do uso de teores simulados para a definição de áreas de risco que afetam o planejamento mineiro e as reservas minerais definidas. Simulações condicionais foram usadas para derivar múltiplos modelos de teores de cobre dentro de um típico corpo de minério do depósito e esses modelos foram comparados com os dados reais de produção (reconciliação). A comparação permitiu uma melhor compreensão sobre a variabilidade da qualidade e ajudou na definição de um plano de produção mais consistente. Com os intervalos de valores provenientes das simulações foi possível mapear importantes áreas de incerteza que afetam o plano de lavra. Análises de risco foram conduzidas para a definição da cava final através da comparação do limite previsto pela estimativa por krigagem ordinária e as cavas resultantes dos modelos simulados de teor de cobre, sendo possível avaliar os impactos operacionais nos principais fatores econômicos (valor presente líquido e fluxo de caixa descontado). Várias cavas finais foram geradas para vários modelos de blocos simulados, comparando-se com a cava anteriormente planejada através da utilização do modelo de blocos produzido pela krigagem ordinária. Além disso, foi definida uma escala de risco utilizando os modelos condicionalmente simulados e os valores estimados pela krigagem (comumente utilizados como referência para definição do orçamento e da alimentação de metal no moinho) a fim de minimizar as variações dos teores. Estas medidas se propõem a reduzir o risco no cumprimento das metas de produção de metal no planejamento de lavra. Esta abordagem, considerando o risco durante o sequenciamento de lavra, foi utilizada no plano de produção anual da mina e comparada com o realizado no período e com a abordagem tradicionalmente aplicada. Os resultados evidenciaram possíveis riscos associados com o limite da cava final operacional e demonstraram os benefícios do uso de análise de risco como uma ferramenta para visualizar e analisar os limites de cava final e planejamento de lavra, ajudando a tomar melhores decisões estratégicas no gerenciamento da mina referente aos fatores técnicos e indicadores econômicos. / Mining industry continuously investigates proper reconciliation procedures and techniques for mapping possible risks in ore recovery and mine planning. A case study at a Brazilian copper mine investigates the adequacy of using simulated grades for defining high risk areas affecting mine planning and the defined mineral reserves. Conditional simulations were used to derive multiple copper grade models within a typical ore-body of the deposit and compared these models against the real production data (reconciliation). The comparison allowed a better understanding of grade variability and helped in defining a more consistent mine plan. The range of values derived from the simulations mapped areas of significant uncertainty affecting the pushback’s plan. Risk analysis were conducted for the final pit definition by comparing the projected final pit limit and mining sequence against the simulated models of copper grade, assessing the operational impacts on key economical factors (mine net present value, discounted cash flow). Several final pit limits were generated for various simulated grade block models and compared to the previously pit planned using the ordinary kriging grade block model. Also, it was defined a risk scale using the conditional simulated models and the ordinary kriged values (commonly used for budget and mill feed reference) in order to minimize grade variations ensuring less risk on completion of the metal production goals on mine planning. This approach considering the risk for the mining sequencing was used on the annual mining plan and compared to the real production and to the traditional approach. The results highlighted possible risks associated with the operational pit limit and demonstrated the benefits of using risk analysis as a tool to preview and review the final pit limits and mine planning, helping to make better strategic decisions by the copper mine management related to the technical factors and economical indicators.

Page generated in 0.1799 seconds