• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 456
  • 19
  • 19
  • 19
  • 19
  • 16
  • 12
  • 11
  • 11
  • 6
  • 3
  • 1
  • Tagged with
  • 464
  • 464
  • 315
  • 146
  • 128
  • 114
  • 113
  • 95
  • 78
  • 69
  • 61
  • 48
  • 47
  • 45
  • 42
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
211

A gestão do territorio pelo grupo Sadia no municipio de Concordia

Silva, Harrysson Luiz da January 1991 (has links)
Dissertação (mestrado) - Universidade Federal de Santa Catarina, Centro de Filosofia e Ciencias Humanas, Florianópolis, 1991 / Made available in DSpace on 2012-10-16T04:29:07Z (GMT). No. of bitstreams: 0Bitstream added on 2016-01-08T17:07:20Z : No. of bitstreams: 1 81578.pdf: 11541520 bytes, checksum: aef6dedce9cac626c35c8ebcd05962a9 (MD5) / Esta pesquisa tem por objetivo, avaliar como os grupos empresariais agroindustriais realizam o controle e reprodução ampliada do seu espaço de gestão, através do estudo do Grupo SADIA. As estruturas territoriais resultantes dos processos espaciais que integram a gestão do território serão importantes para verificar se o controle do espaço por um grupo empresarial agroindustrial constitui uma fonte de poder para o mesmo, fragmentando o território e redefinindo novas relações sociais na escala local. O estudo da gestão do território pelos grupos empresariais, contribuirá para desvendar sua formação, expansão e relação com a sociedade e o Estado. A gestão do território entendido como prática estratégica científico-tecnológico do poder dos grupos empresariais agroindustriais no espaço é reveladora dos mecanismos de controle social e de governabilidade utilizadas pelo grupo. Os mecanismos de controle social evidenciam como a população local, os proprietários rurais integrados e os trabalhadores da indústria são cooptados para que a força de trabalho se reproduza.
212

Uma Analise operacional do processo produtivo em obras estudo de caso em tres tecnologias habitacionais

Oliveira, Ricardo Rocha de January 1993 (has links)
Dissertação (mestrado) - Universidade Federal de Santa Catarina. Centro Tecnologico / Made available in DSpace on 2012-10-16T05:17:23Z (GMT). No. of bitstreams: 0Bitstream added on 2016-01-08T18:02:02Z : No. of bitstreams: 1 108109.pdf: 4468375 bytes, checksum: d5ea57ae616b94e2f26e534849b05d11 (MD5) / habitacional, com uma visão operacional dos serviços desenvolvidos em obras. Isto é feito através de um estudo de caso realizado durante a construção do conjunto habitacional CAMINHO NOVO, obra executada no município de Palhoça (Grande Florianópolis), no Estado de Santa Catarina, onde foram empregadas três tecnologias distintas na construção de habitações. Inicialmente faz-se uma revisão de bibliografias para caracterizar o processo produtivo da construção habitacional e para apresentar formas discutidas na literatura sobre sua melhoria, através das operações e do seqüenciamento das etapas construtivas. Define-se as formas de obtenção dos dados na obra e descreve-se o projeto do estudo de caso. A partir desta metodologia, evidenciam-se as etapas necessárias à execução de uma unidade, a sua lógica de execução, as condições do canteiro de obras e os materiais utilizados. A partir dos dados coletados e do embasamento da bibliografia, discute-se comparativamente as tecnologias, suas vantagens e desvantagens para melhoria do processo produtivo de obras. Conclui-se pela decisiva influência de opções tecnológicas sobre o desempenho da etapa construtiva de habitações.
213

Desenvolvimento de um gerenciador de sistemas flexiveis de manufatura com atributos do controle total da qualidade

Berenhauser, Carlos Henrique January 1994 (has links)
Dissertação (mestrado) - Universidade Federal de Santa Catarina, Centro Tecnologico / Made available in DSpace on 2012-10-16T07:58:50Z (GMT). No. of bitstreams: 0Bitstream added on 2016-01-08T18:57:50Z : No. of bitstreams: 1 103925.pdf: 1947887 bytes, checksum: c823c5e25f7735946e60b4666dbf150f (MD5) / Para o gerenciamento de Sistema Flexível de Manufatura (FMS), deve-se dispor de um sistema de controle em tempo real do resultado econômico de sua produção, integrado com um sistema de controle da introdução de melhoramentos contínuos. Tal ferramenta é necessária para garantir a competitividade, em face do atual acirramento na concorrência pelo mercado consumidor. Neste sentido, foi desenvolvido, no contexto da presente dissertação, a técnica de gerenciamento MTQA. Ela é constituída de procedimentos gerenciais, assitidos por computador. Funcionalmente, o controle da produção da FMS usando a MTQA é subdividido em três níveis hierárquicos, aqui identificados como Planejamento da Produção, Controle da Produção, e Planejamento de Melhorias.
214

Estratégia de manufatura, sistema de PCP e sistema de medição e avaliação de desempenho : um estudo de caso /

Schuch, Luiz Gustavo Siegert January 1998 (has links)
Dissertação (Mestrado) - Universidade Federal de Santa Catarina, Centro Tecnológico. / Made available in DSpace on 2012-10-17T04:03:10Z (GMT). No. of bitstreams: 0Bitstream added on 2016-01-09T00:56:13Z : No. of bitstreams: 1 137751.pdf: 2056503 bytes, checksum: d87f254855f39350b52e1aff769efa49 (MD5)
215

O protótipo GPCP-1 :: jogo do planejamento e controle da produção /

Schafranski, Luiz Erley January 1998 (has links)
Dissertação (Mestrado) - Universidade Federal de Santa Catarina, Centro Tecnológico. / Made available in DSpace on 2012-10-17T08:35:11Z (GMT). No. of bitstreams: 0Bitstream added on 2016-01-08T23:14:42Z : No. of bitstreams: 1 139965.pdf: 20661614 bytes, checksum: 854c64c7aba1de2e3c550cc4b5bf3cb2 (MD5)
216

O projeto do sistema de produção no contexto de obras complexas / Production system design in the context of complex projects

Rodrigues, Alana Araújo January 2006 (has links)
A complexidade dos empreendimentos da construção civil tem sido abordada por diversos autores. Ao contrário da visão tradicional de que estes empreendimentos têm características predominantemente lineares, previsíveis e que seus processos podem ser gerenciados de forma independente, a noção de complexidade traz uma nova luz à gestão da construção. Assim, os empreendimentos da construção devem ser entendidos como compostos por um grande número de processos, inter-relacionados, nos quais melhorias isoladas não resultam normalmente em melhorias substanciais do todo. Neste contexto, o projeto do sistema de produção (PSP), é um processo gerencial que pode contribuir para melhorar o desempenho de empreendimentos de construção, devendo anteceder a etapa de produção. Entretanto, na indústria da construção, esta atividade é pouco difundida, sendo em geral desconsiderada nos empreendimentos. O objetivo geral desta dissertação é propor um modelo de projeto do sistema de produção (PSP) levando em consideração as características complexas dos empreendimentos. O método de pesquisa foi dividido em três etapas. Inicialmente foi realizado o estudo exploratório, cujo objetivo foi obter um melhor entendimento dos empreendimentos estudados. A segunda etapa envolveu quatro estudos empíricos, cujo objetivo foi desenvolver o projeto do sistema de produção para diferentes fases dos empreendimentos, analisar as vantagens e dificuldades da implementação do PSP, assim como analisar a relação entre o PSP e o planejamento e controle da produção. Na etapa final foi proposto um modelo de projeto do sistema de produção no contexto de obras complexas. Nesta etapa também foram discutidos o escopo de decisões do PSP e as ferramentas utilizadas. Entre as principais conclusões deste estudo está a necessidade de antecipar a elaboração do PSP, iniciando ainda na fase de orçamento. O PSP não deve ser deve ser excessivamente detalhado no início do empreendimento, sendo necessária a sua revisão ao longo da etapa de produção, à medida que mais informações tornam-se disponíveis. Dessa forma, o PSP apóia a tomada de decisões relativas à organização da produção e suas decisões servem como informações de entrada para o planejamento e controle da produção (PCP). / The complexity of construction projects have been discussed by many authors. In opposition to the traditional view that those projects are linear and predictable, and that their processes can be managed separately, the notion of complexity cast a new light into construction management. Therefore, construction projects should be seen as composed by a large number of interrelated processes, in which isolated improvements do not usually bring major improvements on the whole. Production System Design is a managerial process that can contribute for improving the performance of construction projects, It should be carried out before the production stage. However, this activity is not widely disseminated in the construction industry and it is neglected in most projects. The objective of this dissertation is to propose a model for the Production System Design (PSD), considering the inherent complexity of construction projects. The research method was divided into three stages. In the first stage, an exploratory study was undertaken aiming to improve the understanding of the types of construction projects to be investigated. The second stage consisted of four empirical studies, in which the production system design for different project phases were produced, and the advantages and difficulties for its implementation were analyzed. Moreover, the relationship between the production system design and the production planning and control process was investigated. In the final stage of the study, a model for designing production systems in complex projects was proposed, including the definition of its scope and the tools that can be used. This research work suggests that there is a need to carry out the production system design before the cost estimating phase. Such design should not be detailed in the early stages of the project, and ought to be revised during the production stage, as more information is made available. Moreover, the production system design supports the decision making process related to the organization of production and provides input information for production planning and control
217

Solução de problemas complexos de programação através de regras desenvolvidas em tecnologia APS

Turatti, Rangel January 2010 (has links)
O ambiente competitivo no qual as empresas estão inseridas é caracterizado por mudanças frequentes na demanda de seus produtos e por uma necessidade em reduzir custos. Para obter sucesso frente à concorrência, se faz necessário alcançar resultados através da melhoria do processo produtivo, oferecendo respostas mais rápidas a variações na demanda e com uma utilização adequada dos recursos produtivos. Neste contexto, a utilização de softwares Advanced Planning and Scheduling com regra personalizada de programação possibilita melhoria no planejamento e programação da empresa no sentido dos objetivos citados. A partir disso, este trabalho propõe uma sistemática de desenvolvimento e implantação de regras de programação personalizadas. Após, é apresentada aplicação de um caso prático no qual foram detalhadas todas as etapas propostas na sistemática, desde o entendimento das necessidades da empresa até a avaliação dos resultados obtidos. / The competitive environment in which firms operate is characterized by frequent changes in product demand and a necessity to reduce costs. To succeed against the competition, it is necessary to gain competitive advantage by improving the production process, providing faster responses to changes in demand and proper use of productive resources. In this context, the use of Advanced Planning and Scheduling software with custom programming rule allows improved planning and programming company towards the objectives mentioned. This study proposes a systematic development and deployment of custom programming rules, next it is presented a case study which detail the stages proposed in the systematic, from the understanding of the business requirement until the evaluation of results.
218

Desenvolvimento de sistemas de automação da manufatura usando arquiteturas orientadas a serviço e sistemas multi-agentes

Peixoto, João Alvarez January 2012 (has links)
Os requisitos de manufatura industrial apontam uma necessidade de reconfiguração e reprogramação do fluxo de processo, a fim de atender modificações no produto com as mudanças dos requisitos de mercado. Estas mudanças implicam em alterações no processo de fabricação, o que, em muitos casos, significa alterar o leiaute, reprogramar controladores, modificar acoplamentos e interfaceamentos, etc. Os tamanhos dos lotes de produção estão ficando menores e a variedade de produtos em uma mesma linha tem aumentado. Isto torna o tempo de preparação dos dispositivos de manufatura fator crucial na formação do custo final. Dispositivos com mais autonomia, capazes de se autogerenciar e que permitam uma troca rápida de funcionalidades passam a serem desejados em um ambiente de manufatura, onde os sistemas convencionais com programação centralizada, sequência definida no controlador central e arranjo de funcionalidades fixas deixam a desejar. Orientação a serviços é um conceito que propõe a descentralização do controle e a disposição de componentes de forma a se agruparem virtualmente e formar novos dispositivos, com novas funcionalidades, otimizando investimento, recurso e tempo de produção. Nesta abordagem os equipamentos passam a se comportar como agentes de manufatura, em um universo de multi-agentes, que negociam entre si o processo requerido, propiciando o atendimento à variação de produto e dispondo de um número maior de funcionalidades, o que reduz o tempo de troca de processos. Um estudo de caso de um sistema orientado a serviços, sob uma plataforma multi-agentes, é proposto neste trabalho, buscando fornecer subsídios para a análise de desempenho e potencialidades deste conceito. / The industrial manufacturing requirements indicate a need for reconfiguration and reprogramming of process flow in order to meet changes in the product with the changing market requirements. These changes imply changes in the manufacturing process, which in many cases, means changing the layout, reprogram controllers, modify interfaces and couplings etc. The production lot sizes are getting smaller and the variety of products in the same line has increased. This makes the preparation time of manufacturing devices crucial factor in the formation of the final cost. Devices with more autonomy, able to manage themselves and allow a rapid exchange of features are to be desired in a manufacturing environment, where conventional systems with centralized scheduling, sequence defined in the central controller and array of features still fall short. Service orientation is a concept that proposes to decentralize the control and disposition of components in order to regroup virtually and form new devices with new features, optimizing investment, resource and production time. In this approach the devices start to act as agents of manufacturing, in a universe of multi-agents, who negotiate among themselves the process required, providing care for the product variation and having a greater number of features, which reduces the switching time processes. A case study of system-oriented services, under a multi-agent platform is proposed in this work, aiming to provide tools for performance analysis and potential of the concept.
219

Beneficiamento de pedras preciosas no Vale do Taquari : diagnóstico e modelo para análise e redução de perdas nos processo produtivos

Costa, Manfred January 2007 (has links)
O beneficiamento de pedras preciosas representa um importante potencial empresarial e de negócios para o Brasil, em especial para regiões como a do Vale do Taquari, no estado do Rio Grande do Sul. No entanto, as empresas deste setor, em sua maioria pequenas, carecem de uma abordagem capaz de melhorar seus processos produtivos, diminuindo suas perdas. Este estudo buscou levantar dados do setor na região, diagnosticar questões relativas aos processos produtivos, em especial sobre perdas nos processos, e propor um modelo para análise dos processos e redução das perdas nestes. O modelo foi gerado considerando dados gerais e históricos do setor, as análises dos questionários aplicados e os mapeamentos realizados. Este modelo está dividido em duas etapas: a de análise e a do conjunto de ações para a redução das perdas. Assim, o modelo propõe uma série de técnicas e ferramentas, geralmente ligadas ao Sistema Toyota de Produção, as quais têm colaborado com diferentes setores. A implementação do modelo proposto deve possibilitar um aumento no potencial de desenvolvimento, tanto no setor de beneficiamento como em toda a cadeia produtiva das pedras preciosas. / The processing of precious stones represents an important potential business in Brazil, especially for regions such as the Taquari Valley, in the state of Rio Grande do Sul. However, the companies in this sector, mostly small, lack an approach aimed at improving their production processes, reducing their losses. This study aimed at surveying data about the sector in that region, examining issues relating to production processes, in particular on losses in processes, as well as proposing a model for analysing these processes and reducing losses. The model was developed considering general and historical data in the precious stones sector, the analysis of the interviews and the mappings carried out. The model is divided into two steps: the first one is the analysis and the second one is the set of actions for reducing losses. Thus, the model proposes a series of techniques and tools, usually related to the Toyota Production System, which have cooperated with different sectors. The implementation of the proposed model shall enable an increase in the potential for development, both in the processing sector, as well as throughout the whole production chain of precious stones.
220

Contribuições para a coleta e a análise de indicadores de planejamento e controle da produção na construção civil / Contributions for data colection and analysis of indicators of production planning and control in construction

Bortolazza, Rodrigo Cremonesi January 2006 (has links)
Nos últimos anos, muitas empresas de construção civil têm buscado melhorar seus sistemas de Planejamento e Controle da Produção (PCP) como uma das formas de melhorar o desempenho de empreendimentos em termos de prazo e custo, além dos constantes objetivos de aumentar a qualidade e a produtividade. Um marco importante no desenvolvimento de sistemas de PCP para esse setor foi a introdução do sistema Last Planner de controle da produção, concebido com base em modelos e teorias desenvolvidos para a Engenharia Industrial, a partir de meados da década de 90. Esse sistema tem sido refinado em diversos estudos ao redor do mundo, grande parte deles baseados em uma análise qualitativa dos dados gerados. De fato, as pesquisas relacionadas à implementação de sistemas de PCP desenvolvidas no Programa de Pós-graduação em Engenharia Civil da UFRGS nos últimos anos também foram fortemente baseadas no Last Planner. O objetivo geral dessa dissertação consiste em propor contribuições para a coleta e a análise de dados que permitam avaliar o impacto de sistemas de PCP no desempenho de empreendimentos de construção civil, assim como identificar algumas dificuldades de implementação. Foi criada uma base de dados com as medidas de desempenho coletadas em empresas, em pesquisas anteriores, e também com dados inseridos em um sistema de indicadores para benchmarking de empresas do setor. Foram realizadas diversas análises, principalmente dos indicadores PPC e causas do não cumprimento das tarefas, utilizando a análise de regressão múltipla. Entre as principais conclusões, o estudo apontou formas de melhorar a coleta de dados, incluindo a utilização de mecanismos pró-ativos para evitar o acúmulo de valores faltantes e dados espúrios. Além disso, sugeriu-se a formação de um banco de dados único para cada empresa para possibilitar o melhor aproveitamento dos dados, uma vez que algumas medidas são coletadas e acabam descartadas sem uma análise aprofundada. Quanto às dificuldades de implementação do PCP, destacaram-se as falhas na análise das causas do não cumprimento dos pacotes de trabalho na etapa de curto prazo e a implementação parcial do planejamento de médio prazo, devido à desconsideração da análise sistemática de restrições. / In recent years, several construction companies have attempted to improve their production planning and control systems in order to improve project performance in terms of time and costs, besides increasing quality and productivity. An important reference in the development of production planning and control systems in this sector has been the introduction of the Last Planner System, conceived from models and theories developed in industrial engineering, since the mid Nineties. This system has been refined in several research studies around the world, most of them based on a qualitative data analysis. In fact, the research studies concerned with production planning and control carried out at the Postgraduate Program in Civil Engineering at UFRGS is recent years have been strongly based on the Last Planner System. The main objective of this dissertation is to make contributions for data collection and analysis for assessing the impact of production planning and control systems in the performance of construction projects, as well as identify some implementation difficulties. A database was built with some measures collected in construction projects in previous research studies, as well as with data from a performance measurement system for benchmarking in this sector. Several analyses were carried out in this data base, mostly based on two measures, the percentage of plan completed (PPC) and the causes for the non completion of work packages, using multivariate regression analysis. Among the main conclusions, this study pointed out ways of improving data collection, including the use of pro-active mechanisms for avoiding the growth of missing values and outliers. Furthermore, it suggests the construction of a single database in each company, enabling the proper use of the data available, since some of the measures are collected but are further discarded without an in-depth analysis. Regarding the difficulties in the implementation of production planning and control, some failures during the analysis of the causes for the non-completion of work packages in short term planning and the incomplete implementation of look-ahead planning, due to the ineffectiveness of constraints analysis, were pointed out.

Page generated in 0.0945 seconds