1 |
Assessing perceptions on performance measures and funding processes at a development finance institution in South AfricaMhlahlo, Petunia Siphiwe 02 1900 (has links)
The Industrial Development Corporation is the largest provider of development funding in South Africa. Despite having documented processes for assessing funding applications, which include traditional performance measures, the impairments as a percentage of outstanding funding book are increasing. However, scholarly literature indicates that traditional performance measures seem inadequate, with Economic Value Added providing more detailed performance company. The study assesses the Industrial Development Corporation employee’s perceptions on stipulated and additional performance measures and its funding processes. The study followed a quantitative research design using a questionnaire. The Statistical Package for Social Sciences was used to analyse the data. The study found that stipulated performance measures are mostly used, but not Economic Value Added. Funding processes could be enhanced through more performance measures and additional pre and post investment processes. It is recommended that processes be enhanced and the addition of Economic Value Added be investigated to assist in reducing impairments. / Management Accounting / M. Phil.
|
Page generated in 0.0892 seconds