Spelling suggestions: "subject:"inversion.""
541 |
El principio de Negocio en Marcha y su impacto en la Liquidez bajo el contexto de COVID-19, en los Centros Comerciales de Lima Metropolitana, año 2020 / The Going Concern Principle and its impact on the Liquidity under the context of COVID-19, in the Shopping Centers of Metropolitan Lima, year 2020Coica Curiñaupa, Patricia, Cóndor García, María Isabel 30 December 2021 (has links)
El presente estudio de investigación tuvo como objetivo principal determinar el impacto del principio de negocio en marcha en la liquidez bajo el contexto de COVID-19 en los centros comerciales de Lima Metropolitana, año 2020. El trabajo de investigación está compuesto de cinco capítulos: Capítulo I: Marco Teórico, comprende el desarrollo de principales fuentes, antecedentes nacionales e internacionales a través de los cuales hemos podido delimitar las principales definiciones de las variables de estudio, así como también establecer sus dimensiones y distinguir el sector que se va a analizar. Luego, el Capítulo II Plan de Investigación, está conformado por el planteamiento del problema, la justificación del estudio, los objetivos e hipótesis generales y específicas. Enseguida, en el Capítulo III Metodología de la Investigación, se define que el estudio se desarrolla con un enfoque mixto en el que se desarrollan los estudios cualitativo y cuantitativo por medio del estudio de instrumentos como la entrevista en profundidad y encuestas, determinando previamente la población y muestra para la recolección de datos. Después en el Capítulo IV Desarrollo de la Investigación, se expone la aplicación de instrumentos detallados con antelación y se plantea un caso práctico para analizar la problemática del principio de negocio en marcha y el impacto en la liquidez. Por último, en el Capítulo V: Análisis de Resultados, se examinan y explican los resultados recabados en el proceso de investigación basados en los instrumentos de estudio para validar de la hipótesis general y específicas a través de un análisis que nos permita dar a conocer las conclusiones y recomendaciones para la presente investigación. / The main objective of this research study was to determine the impact of the going concern principle on liquidity in the context of COVID-19 in shopping malls in Metropolitan Lima, year 2020. The research work is composed of five chapters: Chapter I: Theoretical Framework, comprises the development of main sources, national and international background through which we have been able to delimit the main definitions of the study variables, as well as to establish their dimensions and distinguish the sector to be analyzed. Then, Chapter II, Research Plan, is made up of the problem statement, the justification of the study, the general and specific objectives and hypotheses. Then, in Chapter III Research Methodology, it is defined that the study is developed with a mixed approach in which qualitative and quantitative studies are developed through the study of instruments such as in-depth interviews and surveys, previously determining the population and sample for data collection. Then, in Chapter IV, Research Development, the application of the instruments detailed above is presented and a practical case is presented to analyze the problem of the going concern principle and the impact on liquidity. Finally, in Chapter V: Analysis of Results, we examine and explain the results obtained in the research process based on the study instruments to validate the general and specific hypothesis through an analysis that allows us to present the conclusions and recommendations for this research. / Tesis
|
542 |
Análisis empírico del enfoque de desarrollo territorial: Caso Cuenca del Valle del Río Lurín, Lima 2014 a 2021Zavala Lozano, José Antonio 28 April 2023 (has links)
La presente investigación analiza el estudio de caso del proyecto “Desarrollo territorial y
generación de empleo en la Cuenca de Lurín” con el objetivo de encontrar los factores positivos
y negativos que contribuyeron con el desarrollo territorial de la población del Valle de Lurín. Se
realizó un análisis cualitativo a través de la revisión documentaria; así como, la aplicación de
entrevistas semiestructuradas a los beneficiarios del proyecto, autoridades locales de los distritos
de la Cuenca del Valle de Lurín. Los resultados de la investigación revelan que el proyecto ha
logrado cumplir con sus metas y mejorar la productividad, ingresos, y la participación de los
actores locales.
Si bien el logro resaltante ha sido la concertación para la inversión pública en fuentes hídricas
para el riego agropecuario; es importante mencionar que la sostenibilidad de las acciones en la
zona de intervención aún necesita acompañamiento a nivel de asistencia técnica para los
productores. Las condiciones para el desarrollo territorial requieren de mayor tiempo de
acompañamiento para la mejora de la calidad de la producción hacia los productores,
concientizar a los actores de la Cuenca de cuán necesaria es la gestión de la sostenibilidad
ambiental para que su entorno no esté amenazado, finalmente cuán importante es aplicar los
enfoques de género y de participación hacia la gestión de desarrollo de servicios turísticos para
atraer a más visitantes a la zona y generar un entorno más amigable con el visitante y valorado
por los ciudadanos de Lima Metropolitana. / The current research analyzes the case study of the project "Territorial development and
employment generation in the Lurín Basin". It searching for the positive and negative factors that
contributed to the territorial development of the population of the Lurín Valley. A qualitative
analysis was carried out through documentary review and the application of semi-structured
interviews with the beneficiaries of the project, and local authorities of the districts of the Lurín
Valley Basin. The research outcomes reveal that the project had managed to meet its goals and
improve productivity, beneficiary farmers income, and the participation of local stakeholders.
Although the most outstanding achievement has been the public investment agreement in water
sources for agricultural irrigation; It is important to mention that the sustainability of the actions in
the intervention area still needs support at the level of technical assistance to producers. The
conditions for territorial development require more follow-up time to improve the quality of the
producers' production, make the actors of the Basin aware of how necessary environmental
sustainability management is so that their environment is not threatened, finally, how important it
is to apply gender approaches and participation in the management of the development of tourist
services to attract more visitors to the area and generate a friendlier environment for visitors and
valued by the citizens of Metropolitan Lima.
|
543 |
Estudio de factibilidad económica para el desarrollo de una vivienda multifamiliar en la ciudad de JuliacaAlvarez Ticona, Carlos Francisco 04 March 2019 (has links)
La presente tesis desarrolla una metodología para determinar la factibilidad económica de un proyecto inmobiliario en la ciudad de Juliaca, así como los principales factores que influyen en el desarrollo de proyectos inmobiliarios ubicados en dicha ciudad. El proyecto inmobiliario a estudiar es un edificio de vivienda multifamiliar de siete pisos que actualmente se encuentra en construcción. Se ha tenido como principales fuentes de datos las publicaciones emitidas por el Instituto Nacional de Estadística e Informática (INEI) y el Banco Central de Reserva del Perú (BCRP), así como el Plan de Desarrollo Urbano Juliaca 2016 – 2025. En primer lugar, se realiza un análisis de la situación económica, financiera e inmobiliaria del macro entorno. Seguidamente se realiza un análisis situacional del micro entorno, en el que se muestran las principales características del mercado inmobiliario de la ciudad de Juliaca. También se determina la oferta y demanda de viviendas. En segundo lugar, se realiza el planeamiento estratégico para desarrollar el proyecto. Se prosigue con la segmentación del mercado según variables socioeconómicas y psicográficas para así poder determinar el perfil del cliente objetivo. Luego se realiza el estudio de mercado en el que se detallan las principales características del terreno y de los proyectos de la competencia. En base a estos datos y a los parámetros urbanísticos emitidos por la municipalidad se establecen las características generales del proyecto (perfil) y se desarrolla la cabida arquitectónica. En tercer lugar, se determina la factibilidad técnica del proyecto; para ello se exponen los estudios de ingeniería previos necesarios, las consideraciones para el diseño estructural, instalaciones sanitarias y eléctricas, así como las consideraciones para la construcción. Luego, se determina la factibilidad comercial del proyecto, donde se definen las características del producto, el precio, la plaza y la promoción. Finalmente, se determina la factibilidad económica del proyecto; para ello se evalúa el estado de ganancias y pérdidas, así como los indicadores económicos y financieros obtenidos del flujo de caja (VAN y TIR). También se realiza un análisis de sensibilidad de flujo para poder analizar cómo cambian los indicadores económicos y financieros cuando las principales variables del proyecto son alteradas. Se espera que el presente trabajo pueda servir de guía para el desarrollo de estudios de factibilidad económica de proyectos de vivienda multifamiliar en la ciudad de Juliaca.
|
544 |
Aplicación de la lógica del Blockchain frente al ineficiente sistema integrado de gestión de la información del mecanismo de obras por impuesto que genera un Alto índice de Proyectos de Inversión Público (PIP) que no logran concluir el proceso de emisión del certificado CIPRL al 100% en la población del distrito de Echarati, durante el período 2017-2019Frisancho Fasanando, Nylam Renato, Paucar Chappa, Carlos Augusto 11 November 2023 (has links)
El presente proyecto de investigación analiza la problemática con respecto a la
ineficiencia en la conclusión de las obras por impuesto en los Proyectos de
Inversión Pública (PIP) por parte de las empresas privadas en la población del
distrito de Echarate. Al respecto, se han identificado la ineficacia en la emisión
del Certificado de Inversión Pública Regional y Local (CIPRL) en el distrito de
Echarate siendo uno de los factores relevantes la falta de capacidad institucional,
la falta de capacidad técnica de los funcionarios, la baja calidad de los servicios
e insatisfacción de la población. Por lo que, en los resultados de la investigación,
se ha encontrado una estrecha relación entre la falta de integración
automatizada de los procesos de registro y procesamiento de información como
una necesidad prioritaria de los actores involucrados y el ineficiente proceso de
emisión del CIPRL en la fase de conclusión de las OXI durante el periodo 2015-
2019, siendo esto una de las principales causas para la implementación de un
sistema integrado de la gestión de procesos, lo mencionado anteriormente, ha
identificado un mayor grado incidencia.
Los actores involucrados en el proceso de emisión del certificado CIPRL
plantean el desarrollo de un prototipo mediante las técnicas del Design Thinking
y la aplicación de la lluvia de ideas.
Se concluye como resultado que la aplicación de la lógica del Blockchain hace
factible la implementación de un aplicativo, según metodología BLOXI. Además,
es factible la ampliación vía facultades legislativas con el fin de simplificar el
proceso. Posterior a ello, la viabilidad del prototipo dependerá principalmente del
presupuesto asignado y la sostenibilidad económica para los diversos rubros y
sectores del Poder Ejecutivo, gobiernos regionales, locales y usuarios finales. / This project analyzes the problem regarding the inefficiency in the conclusion of
the works for tax in the Public Investment Projects (PIP) by private companies in
the population of the district of Echarati. In this regard, inefficiency in the issuance
of the Regional and Local Public Investment Certificate (CIPRL) in the district of
Echarate has been identified, one of the relevant factors being the lack of
institutional capacity, the lack of technical capacity of officials, the low quality of
services and dissatisfaction of the population. There before, in the results of the
investigation, a close relationship has been found between the lack of automated
integration of the registration processes and information processing as a priority
need of the actors involved and the inefficient CIPRL issuance process in the
completion phase of the OXI during the 2015-2019 period, this being one of the
main causes for the implementation of an integrated process management
system, the afore mentioned, has identified a higher degree of incidence.
The actors involved in the process of issuing the CIPRL certificate propose the
development of a prototype through the techniques of Design Thinking and the
application of brainstorming.
It is concluded as a result that the application of the Blockchain logic makes the
implementation of an application feasible, according to the BLOXI methodology.
In addition, expansion viable legislative powers is feasible in order to simplify the
process. After that, the viability of the prototype will depend mainly on the
allocated budget and economic sustainability for the items and sectors of the
Executive Branch, regional and local governments, and end users.
|
545 |
Análisis comparativo de los factores que influyen en el proceso de evaluación de las inversiones en salud, de la Gerencia de Desarrollo Social del Gobierno Regional de Lima, en los períodos 2009-2012 y 2017-2019Ramos López, Fiorella Ivonne 26 November 2021 (has links)
El sistema de inversión pública en el Perú ha pasado del Sistema Nacional de
Inversión Pública (SNIP), creada el año 2000, al Sistema Nacional de Programación
Multianual y Gestión de Inversiones (INVIERTE.PE), creado el año 2016. Los
principales cambios, considerados para el presente estudio, dados en el sistema de
inversión vigente, fueron sobre las funciones de las Unidades Formuladoras y las
Unidades Evaluadoras, que pasaron a ser ejecutadas en una misma área, y
denominándose solo Unidades Formuladoras; asimismo, se produjo la distinción de
las inversiones y los proyectos de inversión, creándose las IOARR (Inversiones de
Optimización, Ampliación marginal, Rehabilitación y Reposición).
Por ello, se propone estudiar el impacto de estos cambios en el tratamiento de las
inversiones en salud formuladas a través de la Gerencia de Desarrollo Social del
Gobierno Regional de Lima (GRDS-GORE Lima) , en los periodos 2009-2012 y
2017-2019, se eligió realizar el estudio sobre los proyectos de salud, por ser el
sector, a nivel del sistema de inversiones, que se encuentra con mayores
parámetros y metodologías de desarrollo de los estudios de pre inversión, con
mayores herramientas técnicas para ser formulados y por ser un sector que brinda
uno de los servicios básicos y de manera masiva a la población.
El cambio de la normativa de inversiones a nivel nacional ha modificado la
comunicación existente entre las Unidades Evaluadoras y Formuladoras, por otro
lado, las capacidades técnicas de los formuladores y evaluadores gira entorno a las
nuevas funciones establecidas y a pesar de los cambios se han mantenido las
modalidades contractuales de los mismos.
Para el análisis de los cambios presentados en la normatividad de las inversiones
públicas, en específico de las inversiones en salud, se ha recogido información a
través del análisis de documentos de gestión de la Dirección Regional de Salud de
Lima (DIRESA), la cual forma parte de la Gerencia Regional de Desarrollo Social,
así como la normatividad de inversiones dadas por el Ministerio de Economía y Finanzas (MEF), investigaciones, entre otros. También se han realizado entrevistas
semiestructuradas al personal formulador, evaluador y jefes de las Unidades
Formuladora de la Gerencia de Desarrollo Social y Evaluadora Gobierno Regional
de Lima; y a un “especialista en inversiones” del Ministerio de Economía y Finanzas.
Como hallazgos de esta investigación, se tiene que la comunicación no formal paso
a formar parte del proceso de evaluación de las inversiones en salud, dado que
evaluadores y formuladores se encontraban dentro de la misma área; asimismo, a
pesar de la carga de la Unidad Formuladora, bajo el INVIERTE.PE, se continuó
mantenimiento la modalidad contractual de los formuladores y la rotación alta de
personal. La necesidad de interactuar con la DIRESA y la asunción del papel de
evaluadores, llevo a los formuladores a adquirir mayor conocimiento para poder
evaluar las inversiones y aunque esta se tornaba parcializada, pues dependía de
las mismas personas tanto la formulación como la evaluación y ante la incorporación
de las IOARR como inversiones con su relativa facilidad de formulación y
evaluación, llevó a la Unidad Formuladora de la Gerencia de Desarrollo Social del
GORE Lima a contar con mayor cantidad de inversiones IOARR, que proyectos de
inversión pública, bajo el INVIERTE.PE.
|
546 |
Planeamiento estratégico: Elaboración del Plan Operativo Anual 2023 del Programa de Inversión “Fomento y Gestión Sostenible de la Producción Forestal en el Perú”Robles Vila, Ana Marcela 21 November 2023 (has links)
El presente trabajo de suficiencia profesional se enmarca en mi experiencia
laboral dentro de la Unidad de Planeamiento, Presupuesto y Modernización (UPPM) de
la Unidad Ejecutora (UE) 003 – 1737, encargada de ejecutar el Programa de Inversión
“Fomento y Gestión Sostenible de la Producción Forestal en el Perú” del Servicio
Nacional Forestal y de Fauna Silvestre – SERFOR, entidad adscrita al Ministerio de
Desarrollo Agrario y Riego – MIDAGRI. Este Programa de Inversión se enmarca a su
vez en el Contrato de Préstamo y el Contrato de Aporte Financiero suscritos el año 2021
entre la República del Perú y el Banco de Desarrollo del Estado de la República Federal
de Alemania (KfW).
A lo largo del presente trabajo se desarrollará la elaboración de uno de los
documentos más importantes respecto al Planeamiento Estratégico dentro de
Programas de Inversión financiados a través de cooperación internacional u
operaciones de crédito externo: el Plan Operativo Anual – POA. Este documento de
gestión y planeamiento estratégico es a su vez solicitado a las Unidades Ejecutoras de
Programas financiados por los diferentes organismos internaciones de cooperación
bilateral y multilateral como el BID, BM, BIRF, KFW, JICA, GIZ entre otros. Dichos
organismos cooperantes solicitan este documento de gestión de forma anual, necesario
para la ejecución estratégica de la inversión, donde el principal propósito es programar
las actividades necesarias de forma estratégica haciendo uso de los recursos
financieros del préstamo (ROOC) así como de los recursos provenientes de la
contrapartida nacional (RO), con la finalidad de cumplir los objetivos de los Programas.
|
547 |
Impacto de las condiciones financieras internas y las expectativas en el nivel de inversión privada en el Perú (1997-2017): Extensión del trabajo “The determinants of private investment in a mining export economy”Castro Reategui, Armando 26 January 2022 (has links)
El siguiente trabajo de investigación pretende analizar el impacto de
las condiciones financieras internas, como también el de las expectativas del
sector privado, en el nivel de inversión privada en el Perú para el período de 1997
a 2017, a modo de extensión del trabajo titulado “The determinants of private
investment in a mining export economy, Peru: 1997-2017”. Esto se debe a que
el trabajo anterior nombrado, no llega a determinar de la mejor manera el efecto
de estas condiciones financieras en el nivel de inversión, debido a la variable que
se emplea como indicador, que fue la tasa de interés interbancaria. Además, se
tiene el efecto de las expectativas que está muy ligado con la demanda agregada
del presente y con la futura. Dicho efecto, tampoco se vio plasmado en el trabajo
base, por lo que en este trabajo se tiene como objetivo determinar las relaciones
que tienen estos dos factores en el nivel de inversión, basándonos en los
hallazgos y metodología del anterior trabajo. Es así como, a través del uso de
las restricciones de largo plazo de la inversión privada, se plantea estimar un
modelo SVAR, pero ahora, con la diferencia de que se emplearán como variables
representantes de las condiciones financieras del contexto peruano, al nivel de
crédito y su costo (tasa de interés), así como también a la demanda agregada y
sus proyecciones.
|
548 |
El seguimiento de proyectos como generador de evidencia para las reformas en la gestión pública: una experiencia desde el Ministerio de Transportes y ComunicacionesLazarte Castillo, Paola Pierina 28 September 2021 (has links)
Las evidentes deficiencias en la provisión oportuna de bienes y servicios
públicos por parte del Estado, así como las brechas tangibles de
infraestructura pública, no hacen más que reforzar la percepción de que la
gestión pública se encuentra en crisis. El Estado no ha sido capaz de
mejorar la regulación y procedimientos subyacentes en la producción de
bienes públicos indispensables para la mejora de la calidad de vida de los
ciudadanos o de la competitividad.
Por ello, el presente Trabajo de Suficiencia Profesional (en adelante, TSP),
tiene por objeto presentar a partir de la experiencia profesional ganada
como asesora de alta dirección y directora en el Ministerio de Transportes,
una aproximación de las principales razones por las que los grandes
proyectos de infraestructura en el país presentan constantes dilaciones y
problemas en su ejecución. Este diagnóstico se obtuvo a partir del
seguimiento y monitoreo de proyectos, siendo también objetivo de este
documento demostrar que a partir seguimiento y monitoreo de proyectos es
posible generar evidencia para la formulación de reformas sustanciales en
la gestión de la infraestructura pública en el país.
En particular, este TSP se centrará en la experiencia lograda en dicho
ministerio durante los años comprendidos desde el 2018 al 2020,
encontrando como principales hallazgos la necesidad de contar con
equipos de alto nivel especializados para el destrabe de proyectos y la
necesidad de estandarizar procedimientos para mejorar la gestión de
infraestructura en el sector transportes y en los demás sectores.
|
549 |
Seguimiento y cumplimiento de compromisos y planes de inversión para el aporte de la paz social en el corredor vial surQuiñones Huayna, Carlos Alfredo 18 January 2023 (has links)
El presente es un Trabajo de Suficiencia Profesional (TSP) elaborado a fin de obtener
el Título de Licenciado en Economía, en base a los estándares establecidos por la
Facultad de Ciencias Sociales de la PUCP. Hace un recuento general sobre mi
experiencia como especialista de seguimiento y gestión de compromisos entre los
años 2017 y 2022, desenvuelto en la Secretaría de Gestión Social y Diálogo de la
Presidencia del Consejo de Ministros, entidad responsable a nivel nacional de la
gestión y solución de conflictos sociales.
El TSP presenta los resultados de la sistematización de los compromisos asumidos
por el Estado, en sus diferentes niveles de gobierno, a fin de apaciguar los
controversias o conflictos sociales en las zonas aledañas al Corredor Vial Sur,
también conocido como Corredor Minero. Tarea de suma importancia a fin de contar
con cifras certeras sobre la magnitud del costo total adquirido por el Estado a fin de
mantener la paz social en lugares propensos a la conflictividad y estratégicos por ser
parte del área de influencia directo o indirectas de grandes yacimientos mineros.
|
550 |
Análisis de las iniciativas privadas cofinanciadas en los procesos de promoción de la inversión privada del Estado peruano: ¿Son herramientas viables para reducir la brecha de infraestructura y/o de servicios públicos?Luque Sierra de Coronado, Paola Mirella 23 August 2018 (has links)
Desde su concepción las IPC tuvieron como objetivo principal, la atención de las demandas sociales en la provisión de la infraestructura pública y la prestación de servicios públicos mediante una colaboración o asociación público – privado. El Estado soportaría al privado en la financiación de aquellos proyectos de alta rentabilidad social pero escasa o nula rentabilidad económica. No obstante, los altos costos de transacción y demoras que involucra la tramitación de las IPC, ha generado grandes cuestionamientos sobre la idoneidad de la herramienta, más aún si habiendo transcurrido más de 5 años desde su creación formal, hasta el momento no hay ejemplos de proyectos adjudicados mediante IPC. El presente trabajo de investigación analiza las posibles causas de los problemas e inconvenientes que enfrenta las IPC, así como las fortalezas y oportunidades que dispone para lograr su objetivo de reducción de brechas de infraestructura y servicios públicos / Tesis
|
Page generated in 0.0989 seconds