• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 14
  • Tagged with
  • 14
  • 14
  • 10
  • 9
  • 9
  • 8
  • 8
  • 7
  • 7
  • 7
  • 7
  • 7
  • 6
  • 6
  • 5
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Projektová dokumentace pro provedení stavby nové distribuční trafostanice a kabelového vedení VN a NN / Documentation for construction of new distribution transformer station and cables line HV a LV

Matouš, Milan January 2018 (has links)
The following master thesis is devoted to the design of distribution systems of LV (Low Voltage) and HV (High Voltage) voltage levels. The aim of the thesis is to create a complete project documentation for the construction of a new distribution transformer station (22kV/0.4kV) situated directly in the city of Blansko along with a transformer capable of performance of up to 630kVA. Subsequently a design of cable routes of LV and HV is included in the project documentation. The first part of the thesis introduces the fundamental issues and solutions regarding the design of electrical equipment related to the LV and HV voltage levels. Thereafter it deals with proper legislation, technical regulations and related standards. The second part is dealing with project documentation. More precisely analyzing each step in the process and thoroughly going through individual parts of the project documentation. Other focus of the thesis is software resources and tools which are essential for drawing documentation. Then follows a selection of appropriate electrical equipment and budget evaluation. The major portion of the work is a design of distribution transformer station and cable lines of LV and HV. Including dimensioning of the LV and HV switchboards, earthing system and fuse protection system. The essence of all this work serves as a foundation for complete design documentation.
2

Pořizovací a provozní náklady (efektivnost) různých typů vedení VN / The acquisition and operating costs (efficiency) of different types of HV lines

Veselý, Tomáš January 2018 (has links)
The master´s thesis deals with the evaluation of the efficiency of investment of various types of high voltage lines in terms of capital expenditures and operating expenses. The thesis describes the issue of the regulated environment in the field of electricity, the analysis of the pricing for ensuring the distribution of electricity and the analysis of the capital expenditures and operating expenses of the authorized returns of the distribution company operator. Subsequently, an analysis of the capital expenditures and operating expenses of the overhead and cable lines is processed. The particular components of the operating costs are determined either by annual energy loss per unit of length, an annual hourly labor demand, or an annual cost per unit of length. Another point is the evaluation of the investment efficiency for two different model lines, evaluation of capital expenditures and operating expenses, allowed investment returns and economic evaluation. The conclusion of this pursuit is the comparison of both types of lines, both with the view of capital expenditures and operating expenses, as well as with the view of economic appreciation.
3

Návrh systému chránění distribuční sítě VN / Design of Protection Relays for MV Distribution Grid

Sochor, Tomáš January 2019 (has links)
The master´s thesis deals with the design of medium voltage power line protection and the calculation of reliability indicators. First, it deals with the possibilities of power system operation. Subsequently, it divides the networks according to the grounding of the transformer node and the switching elements and devices occurring in the MV distribution network are mentioned. It presents the basic classification of power line protection and its use, especially it focuses on overhead and cable MV power lines. It also discusses the reliability of the power supply and lists the basic reliability indicators and their possible calculation. The practical part describes the changes in the considered area of the distribution network, where the reconstruction of the power line VN872 and a new way of powering the village Drnholec will take place. The impact of this change on the reliability of the supplied energy is also calculated. Furthermore, the protection of the power line is designed and the correctness of its setting is then verified on the model in the PSS Sincal software.
4

Návrh rozvoje a řešení konfigurace sítě 22 kV / Distribution Network Development and Configuration

Pospíšil, Petr January 2010 (has links)
The theme of this master‘s thesis is distribution network development and configuration in the part of Brno – Trnitá. There is expected to be investments there in the next few years. The thesis consists of two parts. For better understanding of this problem, the first theoretical part concerns with the description of electrical network (subdivision in accordance with voltage levels, conductor types, network types and other electrical network parts), solution of grid’s steady state (as a linear task and also non-linear task, elimination of the balancing node, the iterative method) and Brno distribution network characteristics. The second part concerns with distribution network development and configuration depending on anticipated load development in Trnitá. The result is proposal for transformer station construction Opuštěná fitted with three transformers of nominal output SN = 40 MVA and network configuration change required both for providing new consumption supply as well as sustaining current one.
5

Návrh rozvoje distribuční sítě 22 kV E.ON v zadané oblasti / Design of the expansion of 22kV distribution network in a specific area

Řehoř, Jiří January 2012 (has links)
The aim of this work is the reconstruction and development of the distribution network of DS to ensure electricity supply in the required quality to existing customers and new customers connecting to the planned industrial zone Šlapanice. The first part deals with the inclusion of a distribution network in power system, its distribution and composition. Subsequently, the work deals with the description of the management of distribution networks, cable and outdoor leadership and their parameters. It also contains guidelines for the design of high voltage networks. The end of the first part is devoted to calculating the steady operation of the network. In the second part, the proposed project using the PAS DAISY Off-line v 4.00 Bizon. Based on the available evidence is developed steady state operation. We found that lines are overloaded and need to be strengthened with regard to the development of industrial zones and adjusting the network to ensure safe and reliable operation. The conclusion focuses on the economic evaluation of proposed alternatives.
6

Návrh rekonstrukce distribuční sítě 0,4 kV E.ON v zadané oblasti / Proposal of the reconstruction of 0,4 kV distribution network in a specific area

Fojtík, Martin January 2012 (has links)
This Master’s thesis deals with the problem of distribution electrical network with a focus on solving the steady operation of the electrical distribution network for E.ON Brno - Lisen. The calculation is made by using BIZON PAS Off-Line. The first part of thesis is specialized on the distribution of individual LV and MV networks.The second part of thesis is specialized on the general calculation of the steady operation distribution network and describe criteria for the design and evaluation of this network. In the practical part is calculate existing network in selected area in which is located 53 distribution transformers. In the final part is evaluate the status of existing network and perform design optimization and assessment of this network.
7

Vyvedení výkonu z rozvodny 110/22 kV Moravany u Brna / Feeding power out of 110/22 kV Moravany u Brna substation

Chromík, Aleš January 2013 (has links)
The aim of this Master’s thesis is the design and reconstruction of the high voltage distribution network for the company E. ON with focus on calculation of the stabilized operation and on the planning of new cable taps from the transformer substation Moravany u Brna. The first part of the theoretical analysis of the work deals with the inclusion of the distribution network into the power system and with principles of development and construction of high voltage networks. The second part includes a general calculation of stabilized operation of the power distribution network and a familiarization with the program PAS Off - Line Bison 4.0. The practical part of the thesis is focused on the calculation of the stabilized operation at the current state of transformer substation Moravany u Brna using the PAS Off - Line Bizon 4.0 V programme. This part also contains the design of six new cable lines which are needed to strengthen the power distribution in the southern part of the city Brno. The closing part of this chapter constitutes of a outdoor and indoor cable line renovation. These cables are connected to the transformer substation Moravany u Brna and a calculation of stabilized operation is also included in this part.
8

Vliv kompenzace kabelových sítí na stabilitu blízkých zdrojů / Effect of compensation to cable networks on the stability of nearby sources

Popelář, Vojtěch January 2014 (has links)
This thesis deals with the infulence of compensation cabel network on the stability of nearby power source. This issue is topical with the increase in the ratio of cable networks 110 kV in large cities. The work examines the theoretical concept of stability and factors that affect it. Mainly discusses the stability angle rotor of a synchronous machina. The practical part is performed in MODES software, that performs dynamic simulation of the behavior of the model. In this case, it will be behavior of synchronous machine during short-circuit in network at different values of compensation of this network.
9

Marketingový výzkum před zavedením nového výrobku na trh / Marketing research before launching new product

Dvořáková, Markéta January 2008 (has links)
The Thesis deals with customer survey preferences in area of cable management and framing systems in the Czech market. Inquiry will end in recommendations for the company, which intends to launch a new product and widen its line of products. Theoretical part deals with marketing instruments and marketing research
10

Analýza a návrh náhrady konkrétního venkovního vedení distribuční sítě / Analysis and design of the replacement of the specific overhead line in distribution network

Račuch, Marek January 2017 (has links)
The diploma thesis deals with the issue of the reconstruction of outdoor cables of low voltage distribution network in exchange for the cable line. It analyzes the important factors which are necessary for the preparation of the project documentation for the issue of the territorial consent. The thesis is divided into 4 main chapters. After the first chapter there is introduced chapter 2, which shows the differences between cable and outdoor cables with their advantages and disadvantages. Chapter 3 deals with the guiding principles for low-voltage cable design and the types of equipment needed for the proper operation of a particular distribution network while respecting the requirements of valid PNEs and ČSNs. Chapter 4 explains the chronology of the process leading to the formulation of a basic technical proposal, which is further addressed in Chapter 5, which deals with the complete formulation of the project documentation for the issue of territorial consent.

Page generated in 0.0362 seconds