• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 14
  • 1
  • 1
  • Tagged with
  • 18
  • 18
  • 18
  • 14
  • 13
  • 9
  • 5
  • 4
  • 4
  • 4
  • 3
  • 3
  • 3
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

A Vygotskian perspective of a hybrid model of participatory evaluation and school-based evaluation

Higa, Terry Ann F. January 2005 (has links)
Thesis (Ph. D.)--University of Hawaii at Manoa, 2005. / Includes bibliographical references (leaves 179-181).
2

Sustainable project life cycle management : criteria for the South African process industry

Labuschagne, Carin. January 2002 (has links)
Thesis (M. Eng.)(Industrial)--University of Pretoria, 2002. / Includes bibliographical references.
3

Sustainable project life cycle management : criteria for the South African process industry

Labuschagne, Carin 17 October 2007 (has links)
Please read the abstract (Dissertation Summary) in the section 00front of this document / Dissertation (MEng (Industrial Engineering))--University of Pretoria, 2007. / Industrial and Systems Engineering / MEng / unrestricted
4

An assessment of participatory monitoring and evaluation in NGOs: a case study of SOS Children’s Village, Cape Town, South Africa

Tewolde, Gebretedek Biruk January 2018 (has links)
Magister Artium (Development Studies) - MA(DVS) / This study is an assessment of participatory monitoring and evaluation in NGOs: a case study of SOS Children’s Village,Cape town, South Africa. The aim of the study is to examine the process of application of PM&E framework in the SOS Children’s Village Project, with a view to ascertaining its impact on the project and to provide suggestions and recommendations to SOS and NGOs in South Africa. There were four primary objectives of this study:to provide a theoretical and conceptual framework, through the discussion and/or analysis of applicable PM&E theories and concepts; to provide an overview of organizational structure of the project implementation team of SOS; to identify the different stakeholders involved in the monitoring and evaluation process; to empirically assess the process of PM&E in the SOS Project. The theoretical and conceptual framework of participatory development approach and the child rights based approach is used in this study. Both quantitative and qualitative methods of research are used throughout the study and measurement of key variables are made. While the systematic random sampling technique is utilised to collect data for the quantitative research, purposive sampling was used to select respondents for semi-structured interviews in the qualitative research. The study identified that the monitoring and evaluation process in SOS Children’s Village, Cape Town, South Africa is participatory in which the relevant stakeholders, especially the beneficiaries i.e. children participate in the monitoring and evaluation process. However, the study recommended that there should be an updated training and seminar for the staff to empower them to enhance their understanding of participatory monitoring and evaluation
5

The effectiveness of the project management life cycle in Eskom Limpopo Operating Unit

Baloyi, Gidion January 2015 (has links)
Thesis (MBA.) -- University of Limpopo, 2018 / South Africa is a developing state; the roles of the state owned entities in encouraging economic growth and contributing to the mitigation of unemployment and poverty eradication are unavoidable. Project management from an engineering development perspective and as an industrial discipline has been investigated and published throughout the past period. It could be said that the subject is mature, as recent publications on project management fail to bring new knowledge to light particularly in Eskom. This mini dissertation studies the most significant serious success factors in the effective project management in different departmental conditions within Eskom. Projects are being used daily in Eskom to achieve the company goal. In recent years researchers have become increasingly interested in factors that may have an impact on project management effectiveness and the success of projects. However, there is little research that shows how effectively projects are managed in a business organisational context like Eskom. My Study aims to partly fill this gap by presenting results from a case study and surveys of Eskom as an organisation practising project management. It also aims to investigate the effectiveness of project management in terms of Eskom Divisional structures, technical competency, Eskom Project leadership ability and the characteristics of an effective project manager. In managing projects, it is significant to know how to handle both the tools and the people and to achieve a balance between the two. Experience, especially in the management of change was perceived to be a significant factor in project success
6

Assessing the process of participatory monitoring and evaluation: A case study of the Salesian Institute Youth Project, vocational training in Cape Town South Africa

Chikukwa, Donald January 2019 (has links)
Magister Artium (Development Studies) - MA(DVS) / The involvement of beneficiaries in monitoring and evaluation processes, not only does it ensure the success of the project’s intended objectives, but it empowers, creates knowledge production while guaranteeing a means to a sustainable livelihood for beneficiaries. The study sought to assess the process of Participatory Monitoring and Evaluation using a case study of the Salesian Institute Youth project, vocational training in Cape Town South Africa. Thus the study set out to conduct an evaluative assessment of stakeholder participation in the process of PM&E; identify the organizational structure of the project team and the parties involved; assess the project intended goals versus the outcomes of the project, and identify the relationship between the process of PM&E and the outcomes of the project. The study employed quantitative and quantitative methods, noting the low response rate a larger sample of 150 questionnaires was evenly distributed across gender and 102 were completed. Ten interviews were conducted across all stakeholders. Data were captured and analyzed using SPSS and thematic analysis. The study concludes that the involvement of participants in the process of PM&E is vital to achieving positive projects outcomes. Participants should be made aware of the meaning, purposes of the project as this allows for their comprehension and free will to participate in PM&E processes. Although the outcomes of the project were positive, the study recommends that there is a need for an established scientific PM&E system for the organization that can be implemented in organization projects.
7

An analysis of the implementation of a monitoring and evaluation system : the case of the NGO SaveAct.

Honu-Siabi, MacCarthy Kofi. January 2013 (has links)
The importance of Monitoring and Evaluation (M&E) during programme implementation has driven many governments, organisations and donors to invest substantial means in developing comprehensive M&E and tools. However, research reveals that, while some of these comprehensive M&E systems have been successfully implemented, others could not be used to achieve the purposes for which resources were utilised in designing them. Some writers have explained that, even though great effort is invested in the development of M&E systems, not all of them actually get implemented, or even if they do, they are only partially implemented. One reason cited was the complexity of M&E systems, which makes implementation difficult. The Non-Governmental (NGO) sector in its implementation of social programmes, uses M&E systems and frameworks to monitor programmes for various reasons, including accountability and organisational learning purposes. A case study approach, using in-depth qualitative methods, was used to analyse the implementation of the M&E systems in SaveAct, an NGO based in Pietermaritzburg in KwaZulu-Natal. A semi-structured interview guide was used to collect primary data. Interviews were conducted with various role-players within the system to gather information about their experiences of implementing M&E systems. Documents and reports were analysed to investigate the nature of the M&E systems, and their purposes and uses and implementation successes and challenges. The findings of the study revealed that in SaveAct the M&E is done for the purpose of accountability to donors and for organisational learning and improvement in programmes. Two previous frameworks were designed for intensive evaluation purposes, but could not be fully implemented. Challenges that emerged include the comprehensive nature of the frameworks, lack of human capacity and limited finances for implementation. However, regular data collection for monitoring was being successfully undertaken. Some of the success factors identified include the simple and easy-to-understand data collection tools and the inclusion of M&E activities in the routine work of staff (mainstreaming). M&E systems that have simple tools which clearly outline the goals and where the functions are included in the daily routine of the staff, are more likely to be implementable. The conclusions of the study were that M&E systems can be made more implementable if they are designed with an understanding that the system components are interrelated and an attempt is made to see to it that each component is functional, to ensure the mode of action of the entire system. M&E systems and frameworks should be designed to be simple and clear. They should contain fewer tools and should be easily understood by the people who do the actual data collection. The tools with fewer questions were easier to implement than those with many questions. M&E functions in SaveAct were more successful when included in normal routine work of the staff, or mainstreamed, and not undertaken as a separate activity and also when they are located within planning and budgeting functions of the organisation. / Thesis (M.Soc.Sc.)-University of KwaZulu-Natal, Pietermaritzburg, 2013.
8

Increasing the validity of effectiveness evaluation a participatory, theory-based study of an adolescent mental health intervention /

Wallace, N. Tanner LeBaron, January 1900 (has links)
Thesis (Ed. D.)--UCLA, 2008. / Vita. Includes bibliographical references (leaves 159-169).
9

Developing a Partnering Performance Index (PPI) for construction projects : a fuzzy set theory approach

Yeung, Fai Yip. January 2007 (has links)
Thesis (Ph.D.)--Hong Kong Polytechnic University, 2007. / Advisers: Albert P.C. Chan, Daniel W.M. Chan. Includes bibliographical references.
10

Investigating the evaluation performance of an educational programme conducted in Yunnan Province, China. A thesis submitted in partial fulfilment of the requirements for the degree of Master of Education, Unitec Institute of Technology [i.e. Unitec New Zealand] /

Zhang, Han. January 2008 (has links)
Thesis (M.Ed.)--Unitec New Zealand, 2008. / Coda (electronic version) title-page has 2009 date. Includes bibliographical references (leaves 109-121).

Page generated in 0.2037 seconds