• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 108
  • 5
  • Tagged with
  • 113
  • 113
  • 74
  • 71
  • 66
  • 36
  • 33
  • 23
  • 20
  • 18
  • 18
  • 16
  • 15
  • 15
  • 15
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
61

Desenvolvimento social e programas de eletrificação rural de não atendidos / Social development and rural electrification programs not met

Strazzi, Paulo Ernesto 25 August 2009 (has links)
O trabalho de pesquisa tem por objetivo estudar e oferecer uma nova política de eletrificação rural para o Estado de São Paulo, tendo por base o seguinte questionamento: cabe ao Estado de São Paulo manter política própria de eletrificação rural após a lei da universalização, nº 10.438/2002, do programa Luz para Todos e, ainda, do conjunto de Resoluções da ANEEL sobre o assunto? A abordagem do assunto tem por base a experiência do autor sobre o tema eletrificação rural, em especial com os programas desenvolvidos no Estado a partir de 1996, sob gestão ou coordenação da CERESP, órgão da Secretaria de Saneamento e Energia (SSE). A regulação da época previa que o interessado deveria pagar pelo custo de conexão à rede elétrica das concessionárias, assim, os programas desenvolvidos até então, tratavam de complexos sistemas de financiamento dessas conexões. As inovações desses programas contribuíram para a implantação da lei da universalização 10.438/2002 e do programa Luz para Todos. O programa Luz para Todos trata a universalização de modo diferente daquele determinado pela Resolução 456/2000, em que os benefícios concedidos aos interessados atendidos pelo programa são mais abrangentes daqueles permitidos pela regulação atual. A pesquisa mostra que esse é o diferencial que permite a real universalização do acesso ao serviço público de eletricidade no meio rural, de forma adequada. O programa será encerrado em dezembro de 2010, cabendo às concessionárias atender os interessados apenas pelos critérios da universalização. O trabalho aponta grande possibilidade de exclusão do acesso à eletricidade a partir desse momento, e propõe oferecer ao Estado uma pesquisa que indique caminhos que possibilite a São Paulo antecipar-se às consequências que virão com fim do Programa Luz para Todos. Trata-se, assim, de pesquisa que envolve experiência profissional e conhecimento acadêmico. / The research work aims to study and provide a new policy of rural electrification in the State of Sao Paulo, based on the following question: \"the State of Sao Paulo must maintain its own policy of rural electrification after the universal law, nº 10.438/2002, the Light for All program and also the set of resolutions by ANEEL on the matter?\" The approach to the subject is based on the author\'s experience on the subject of rural electrification, especially through programs developed in the state since 1996, under the management or coordination of CERESP, organ of the SSE. The regulation of time provided that the person should pay for the cost of grid connection to the utilities power grids, therefore the programs developed so far, dealt with complex financial systems of these connections. The innovations of these programs contributed to the implementation of the law universal nº 10438/2002 and the Light for All program. The Light for All Program is universal and so different from that determined by ANEEL Resolution 456/2000, where the benefits granted to persons enrolled in the program are the most comprehensive of those allowed by current regulation. Research shows that this is the differential that allows the real universal access to public electricity in rural areas, as appropriate. The program will end in December 2010, leaving it to dealers only meet the criteria of universality. The work shows great possibility of exclusion from access to electricity from that time, and proposes giving the state a survey indicating that enable paths to Sao Paulo to anticipate the consequences that come with the end of the Light for All Program. Therefore, it is a research that involves work experience and academic knowledge.
62

Avaliação global dos modos energéticos de transporte do gás natural inclusive como energia secundária / Global Evaluation of Energy Ways of Natural Gás Transport, as Well as Secondary Energy

Rigolin, Pascoal Henrique da Costa 15 June 2007 (has links)
O objetivo do trabalho é fazer a avaliação global de alguns dos modos energéticos de transporte do gás natural (gasodutos, GNL e GNC), inclusive como energia secundária (eletricidade e GTL). Para a escolha do melhor modo de transporte, além dos custos de cada projeto, serão considerados outros três fatores, que são: impactos ambientais, impactos sociais e riscos políticos. Para isto foi escolhida uma ferramenta de análise conhecida como Avaliação de Custos Completos (ACC), sendo que esta considera os quatro fatores citados anteriormente como de mesma importância na avaliação para um planejamento que vise a sustentabilidade. Para melhor visualização e entendimento do trabalho, foi feito um estudo de caso para o transporte de energia (gás natural e/ou eletricidade) para atender mercados consumidores na região de fronteira entre o Brasil e a Bolívia. Fundamentalmente o estudo do transporte foi feito em solo boliviano, correspondente entre os campos produtores de gás, localizados em Margarita, até a região de fronteira próxima a Corumbá no Mato Grosso do Sul (MS), e também próxima a uma região com grandes jazidas de minério de ferro conhecida como El Mutún. Metodologicamente dentro das quatro dimensões consideradas, foram usados alguns subcritérios mais relevantes para esta análise. Para todos os sub-critérios foram atribuídas notas específicas, de acordo com a região e com o tipo de transporte de energia, e após isto os dados foram passados para um software de tomada de decisão chamado Decision Lens, obtendo assim um rank das melhores opções transporte para a região. Como resultado, o mais coerente para atender a região, são gasodutos de transporte para as demandas elétricas e de gás natural (consumo do MS mais Mutún) e trens carregados com derivados líquidos do gás natural (GTL) para atender a demanda de diesel do MS. / The objective of this work is to make a global evaluation of some energy ways of transport of natural gas (gas-pipelines, LNG and CNG), as well as secondary energy (electricity and GTL). For the selection of a better way of transport, beyond the costs of each project, others three factors were considered: environmental impacts, social impacts and political risks. To perform this, a tool of analysis known as Evaluation of Complete Costs (ACC in portuguese) was chosen. This tool considers the four factors above mentioned as having the same importance in the evaluation process for planning that aims towards sustainability. For better visualization and understanding of the work, a case study for energy transport was made (natural gas and/or electricity) to supply the consumer markets in the region bordering Brazil and Bolivia. Basically the study of the transport was made in Bolivian territory; at the producing gas fields located in Margarita as far as the region bordering Corumbá in the Mato Grosso do Sul area, and also next to a region with great known iron ore deposits known as El Mutún. Methodologically, within the four dimensions above, some more relevant sub-criteria for the analysis were used. For all the sub-criteria considered specific ranks were taken, in accordance with the region and type of transported energy, and after this the data was fed to a software called Decision Lens, thus getting a rank of the best options to carry gas to the region. The results, most coherent way to supply gas to the region, happens to be gas-pipelines of transport for the electric and natural gas demands (consumption in MS plus Mutún) and trains with liquid derivatives of natural gas (GTL) to supply care of the demand of diesel of MS.
63

Análise da resposta da demanda e da geração distribuída fotovoltaica como recursos para o planejamento energético. / Analysis of demand response and photovoltaic distributed generation as resources for energy planning.

Viana, Matheus Sabino 04 October 2018 (has links)
Este estudo analisa a Resposta da Demanda (DR da sigla em inglês para Demand Response) e a Geração Distribuída Fotovoltaica (GDFV), visando o desenvolvimento de uma abordagem para modelá-las como recursos para o planejamento energético. A metodologia inclui o uso de uma prática típica de preço de energia no varejo como a Tarifa pelo Horário de Uso (THU) para DR de consumidores residenciais e o sistema de compensação de energia elétrica (net metering) para a microgeração distribuída provida por sistemas Fotovoltaicos (FV) do tipo rooftop. A metodologia proposta foi aplicada a um estudo de caso com diferentes níveis de DR e/ou GDFV, baseado no IEEE 8500-Node Test Feeder, com uma subestação de distribuição e 1177 consumidores em baixa tensão, utilizando-se o Open Distribution System Simulator (OpenDSS) para a solução do fluxo de potência e a obtenção de dados de demanda, consumo de energia, perdas e tensões. Os níveis mais elevados de DR e GDFV, em dia útil, em um grupo de Consumidores Residenciais Responsivos (CRR) cuja carga representa 26,6% da carga total do circuito de teste, resultaram em 6,3% de redução na demanda de ponta da subestação, 9,6% de redução no consumo diário de energia da subestação e 13,3% de redução nas perdas diárias de energia nas linhas e transformadores, comparando-se com o caso base com a tarifa convencional, sem DR e GDFV, e mantendo-se o consumo diário de energia dos CRR. Uma análise de sensibilidade foi realizada por meio de variações aleatórias nas curvas de carga dos consumidores e, nos cenários aplicáveis, na irradiância no plano inclinado e na temperatura dos conjuntos FV, respeitando uma distribuição normal. O estudo de caso foi complementado com a avaliação das variações na conta de energia de amostras de CRR, cujas maiores reduções, comparando-se com o caso base, foram 36,3% com os níveis mais elevados de DR e GDFV e 37,6% com os níveis mais elevados de GDFV e sem DR, indicando uma situação na qual mudanças regulatórias seriam necessárias para estimular DR e GD simultaneamente, como no caso da THU opcional chamada de tarifa branca no Brasil. A quantificação do potencial de DR e GDFV pode indicar tendências para o planejamento energético, contribuir para planos de eficiência energética e possibilitar a implementação de sistemas modernos e sustentáveis nos quais os consumidores possam participar de forma mais ativa. / This study analyses the Demand Response (DR) and Photovoltaic Distributed Generation (PVDG) for developing an approach to model them as resources for energy planning. The methodology includes the use of a typical retail pricing practice such as the Time-of-Use Tariff (TOU) for residential consumers\' DR and net metering for distributed micro-generation provided by rooftop Photovoltaic (PV) systems. The proposed methodology was applied to a case study with different levels of DR and/or PVDG, based on the IEEE 8500-Node Test Feeder, with a distribution substation and 1177 low-voltage consumers, using the Open Distribution System Simulator (OpenDSS) to obtain the power flow solution and demand, energy consumption, losses and voltages data. The highest levels of DR and PVDG on weekday in a group of Responsive Residential Consumers (RRC) whose load represents 26.6% of the total load in the test circuit resulted in 6.3% reduction in the substation peak demand, 9.6% reduction in the substation daily energy consumption and 13.3% reduction in the daily energy losses in lines and transformers, compared to the base case with flat tariff, without DR and PVDG, and maintaining the daily energy consumption of RRC. A sensitivity analysis was performed using random variations in load curves and, in the applicable scenarios, in plane-of-array irradiance and PV array temperature curves, using a normal distribution. The case study was complemented with the analysis of energy bill variations of samples of RRC, whose greatest reductions compared to the base case were 36.3% with the highest levels of DR and PVDG and 37.6% with the highest level of PVDG and without DR, indicating a situation in which regulatory changes would be necessary to stimulate DR simultaneously with PVDG, such as in the case of the optional TOU called white tariff in Brazil. The quantification of DR and PVDG potential can show trends to energy planning, contributes to energy efficiency plans and enables the implementation of modern and sustainable systems in which end users can participate more actively.
64

Uma abordagem baseada em algoritmos genéticos para gerenciamento e controle de transferência não natural de água entre rios em contribuição ao planejamento da operação de sistemas hidrotérmicos

Gramulia Junior, Jacyro January 2014 (has links)
Orientadora: Profa. Dra. Patrícia Teixeira Leite Asano / Tese (doutorado) - Universidade Federal do ABC, Programa de Pós-Graduação em Energia, 2014. / O objetivo da pesquisa é apresentar uma metodologia para avaliar os efeitos da transferência de água bruta entre rios ou bacias hidrográficas, na perspectiva de otimizar a geração de energia elétrica. Busca-se ainda refletir sobre a racionalização e otimização do volume transferido para que não prejudiquem os ecossistemas, as atividades e utilizações da região doadora de água e atendam as necessidades da região receptora de água, incluindo seus próprios ecossistemas. A produção hidroelétrica é considerada como um uso não consuntivo da água e não concorre com o abastecimento público, desde que corretamente gerenciada. A transferência de água, se associada à produtibilidade das hidroelétricas, pode contribuir para otimização da produção de energia elétrica diminuindo a utilização das usinas térmicas de custos operativos elevados e enormes restrições ambientais. Portanto, neste trabalho de pesquisa foi implementado um novo operador genético em uma ferramenta computacional desenvolvida na UFABC para controle das vazões e volumes a serem transferidos, chamada Hidro-IA, com o emprego de algoritmos genéticos, que é uma das técnicas de inteligência artificial consolidada para otimização de problemas de grande porte. Sabe-se que a melhor forma de aproveitar os ciclos hidrológicos e os respectivos excedentes de água bruta de uma bacia ou região é por meio de um correto armazenamento em reservatórios que possibilitem seu uso em épocas de escassez. Sendo assim, a transferência de água entre regiões é uma estratégia que permite um ganho de armazenagem em reservatórios subutilizados em suas capacidades máximas de estocagem. Após a implementação do operador proposto nesta pesquisa, pode-se observar nos casos testes realizados que a transferência de água foi feita de forma controlada e otimizada, permitindo o uso adequado do recurso hídrico disponível e consequentemente minimizando a utilização de complementação térmica. Finalizando, podese levantar a hipótese de utilizar o ganho com a geração de energia elétrica para tratamento de água em algumas bacias poluídas de forma a trazer diversos benefícios para a sociedade que não seja apenas a produção de eletricidade, mas também, a disponibilização de água para consumo. / The aim of this project is present a methodology to analyze the impacts of the raw water transfer between rivers or watersheds on a perspective of improving electrical power generation. Searches to reflect about rationalization and optimization of volume transferred so it don¿t damage the environment, the activities or the use of the water donor area and that serves the needs of the receiving area, including its own ecosystems. Hydroelectric production is considered a nonconsumptive water activity, not competing with the public water supply if correctly used. The water transfer can be associated with the hydroelectric yield to increase the production of electric energy and decrease the activities of high cost thermoelectric plants and environment restrictions. Therefore in this project was implemented a new genetic operator to control the transference of volume and water flow between rivers or watersheds in a computational tool created by UFABC called Hidro-IA, an artificial intelligence technic used to optimize large-scale problems using genetic algorithms. It is well known that the better way to maximize the hydrologic cycles and the plant raw water surplus is with the storage in water reservoirs, enabling its use in shortage times. Accordingly, the water transfer between regions is a strategy that allows an increase in the underutilized reservoirs. Underutilization occurs due to different rainfall rates and due to intensity of utilization by the population, with exhaustion of local hydric availability. After implantation of the operator proposed here in this project it was possible to saw, in the tests, that that the transference of water was made in a controlled and optimized way enabling the adequate use of the existing hydric resources and therefor minimizing the use of thermal complement. In conclusion, it is possible to utilize the electrical power generation profit to treat water in some of the polluted watersheds, bringing benefits to the society other than electric generation just but providing water to human consumption too.
65

Análise da resposta da demanda e da geração distribuída fotovoltaica como recursos para o planejamento energético. / Analysis of demand response and photovoltaic distributed generation as resources for energy planning.

Matheus Sabino Viana 04 October 2018 (has links)
Este estudo analisa a Resposta da Demanda (DR da sigla em inglês para Demand Response) e a Geração Distribuída Fotovoltaica (GDFV), visando o desenvolvimento de uma abordagem para modelá-las como recursos para o planejamento energético. A metodologia inclui o uso de uma prática típica de preço de energia no varejo como a Tarifa pelo Horário de Uso (THU) para DR de consumidores residenciais e o sistema de compensação de energia elétrica (net metering) para a microgeração distribuída provida por sistemas Fotovoltaicos (FV) do tipo rooftop. A metodologia proposta foi aplicada a um estudo de caso com diferentes níveis de DR e/ou GDFV, baseado no IEEE 8500-Node Test Feeder, com uma subestação de distribuição e 1177 consumidores em baixa tensão, utilizando-se o Open Distribution System Simulator (OpenDSS) para a solução do fluxo de potência e a obtenção de dados de demanda, consumo de energia, perdas e tensões. Os níveis mais elevados de DR e GDFV, em dia útil, em um grupo de Consumidores Residenciais Responsivos (CRR) cuja carga representa 26,6% da carga total do circuito de teste, resultaram em 6,3% de redução na demanda de ponta da subestação, 9,6% de redução no consumo diário de energia da subestação e 13,3% de redução nas perdas diárias de energia nas linhas e transformadores, comparando-se com o caso base com a tarifa convencional, sem DR e GDFV, e mantendo-se o consumo diário de energia dos CRR. Uma análise de sensibilidade foi realizada por meio de variações aleatórias nas curvas de carga dos consumidores e, nos cenários aplicáveis, na irradiância no plano inclinado e na temperatura dos conjuntos FV, respeitando uma distribuição normal. O estudo de caso foi complementado com a avaliação das variações na conta de energia de amostras de CRR, cujas maiores reduções, comparando-se com o caso base, foram 36,3% com os níveis mais elevados de DR e GDFV e 37,6% com os níveis mais elevados de GDFV e sem DR, indicando uma situação na qual mudanças regulatórias seriam necessárias para estimular DR e GD simultaneamente, como no caso da THU opcional chamada de tarifa branca no Brasil. A quantificação do potencial de DR e GDFV pode indicar tendências para o planejamento energético, contribuir para planos de eficiência energética e possibilitar a implementação de sistemas modernos e sustentáveis nos quais os consumidores possam participar de forma mais ativa. / This study analyses the Demand Response (DR) and Photovoltaic Distributed Generation (PVDG) for developing an approach to model them as resources for energy planning. The methodology includes the use of a typical retail pricing practice such as the Time-of-Use Tariff (TOU) for residential consumers\' DR and net metering for distributed micro-generation provided by rooftop Photovoltaic (PV) systems. The proposed methodology was applied to a case study with different levels of DR and/or PVDG, based on the IEEE 8500-Node Test Feeder, with a distribution substation and 1177 low-voltage consumers, using the Open Distribution System Simulator (OpenDSS) to obtain the power flow solution and demand, energy consumption, losses and voltages data. The highest levels of DR and PVDG on weekday in a group of Responsive Residential Consumers (RRC) whose load represents 26.6% of the total load in the test circuit resulted in 6.3% reduction in the substation peak demand, 9.6% reduction in the substation daily energy consumption and 13.3% reduction in the daily energy losses in lines and transformers, compared to the base case with flat tariff, without DR and PVDG, and maintaining the daily energy consumption of RRC. A sensitivity analysis was performed using random variations in load curves and, in the applicable scenarios, in plane-of-array irradiance and PV array temperature curves, using a normal distribution. The case study was complemented with the analysis of energy bill variations of samples of RRC, whose greatest reductions compared to the base case were 36.3% with the highest levels of DR and PVDG and 37.6% with the highest level of PVDG and without DR, indicating a situation in which regulatory changes would be necessary to stimulate DR simultaneously with PVDG, such as in the case of the optional TOU called white tariff in Brazil. The quantification of DR and PVDG potential can show trends to energy planning, contributes to energy efficiency plans and enables the implementation of modern and sustainable systems in which end users can participate more actively.
66

Agregação de valor à energia elétrica através da gestão integrada de recursos. / Value addition to electrical energy through integrated resources management.

André Luiz Veiga Gimenes 28 March 2000 (has links)
Há algum tempo, a energia elétrica tem sido pensada como um fator de fomento ao desenvolvimento de regiões carentes. No entanto, a experiência tem mostrado que, embora seja realmente necessária, a presença da energia elétrica, por si só não é suficiente para alcançar tal objetivo. Neste contexto, o presente trabalho aborda a disponibilização da energia elétrica de forma integrada em um cenário mais amplo, o da infra-estrutura, abrangendo o Transporte, a Água e Saneamento, o Tratamento do Lixo e as Telecomunicações, com vistas a criar uma base sólida para alavancar o desenvolvimento. Para tanto, propõe a abordagem da Gestão Integrada de Recursos – GIR, que é balizada pelo equilíbrio entre os aspectos econômico, social e ambiental dos empreendimentos, visando a provisão de infra-estrutura com vistas ao desenvolvimento sustentável de regiões carentes. Esta metodologia, desenvolvida no contexto de uma visão abrangente e integrada da infra-estrutura, permite a identificação de sinergias e potencialidades entre os seus componentes, bem como de possíveis parcerias entre os envolvidos. Dessa forma espera-se estabelecer vantagens econômicas, sociais e ambientais na provisão de infra-estrutura pelo setor privado sob a ação do Estado, não mais como investidor e administrador, mas como ente regulador. Nesta gestão, salienta-se a importância da atuação do Setor Público no sentido de criar mecanismos regulatórios diferenciados, que tornem os investimentos em infra-estrutura atrativos ao investidor privado, ao mesmo tempo em que estabelecem e permitem a fiscalização do cumprimento das metas sociais e de preservação ambiental. / Electrical energy has been considered like a fomentation factor to the poorest regions. The experience has shown that electrical energy is really necessary but it's not sufficient to guarantee a development basis. In such a context, this work focuses the integration of electrical energy within other component of the infrastructure, including Transportation, Water and Sanitation, Waste Disposal and the Telecommunications, in order to establish a strong basis for development. For that, the work proposes the approach Integrated Resources Management –IRM, that is based on the balance of the economic, social and environmental aspects of the projects, in order to guarantee the required infrastructure basis for the sustainable development of the poorest regions. In this type of management, it is emphasized the importance of the Public Sector, in order to create new regulatory mechanisms that make the infrastructure investments more attractive to the Private Sector, at the same time in witch establish and allow the monitoring of the social goals and of the environmental preservation. This methodology is developed within a wide and integrated vision of the infrastructure that allows the identification of synergies and potentialities of its components, and the establishment of partnerships of involved parties. This approach is expected to establish economic, social and environmental advantages in the infrastructure provision by the private sector, under the regulatory State action.
67

Modelo de sazonalização da energia assegurada de usinas hidrelétricas utilizando algoritmos genéticos. / Model to alocate the assured energy of hydro power plants using genetic algorithms.

Cristiane Toma Sokei 05 September 2008 (has links)
A receita operacional de uma empresa de geração predominantemente hidrelétrica é composta de duas parcelas: a comercialização de seus contratos de energia e a liquidação na Câmara de Comercialização de Energia (CCEE). A parcela de receita de contratos é previsível, mas a receita proveniente da liquidação da CCEE é de difícil mensuração porque depende das alocações do Mecanismo de Realocação de Energia (MRE) e do Preço de Liquidação das Diferenças (PLD). O trabalho apresenta os conceitos gerais dos componentes que influenciam a receita do mercado de curto prazo e um modelo para sazonalização da energia assegurada que é um dos fatores determinantes para a alocação de MRE e para a liquidação das diferenças. O modelo foi detalhado e implementado em uma ferramenta computacional utilizando Algorítmos Genéticos para a minimização da perda esperada e do risco com a sazonalização. / The operating revenue of power generation companies has two different components: revenues arising from power purchase agreements and from spot market, managed by the Câmara de Comercialização de Energia - CCEE The income of contracts is predictable, but there are a lot of difficulties to do prognosis with the spot market revenue component, because it depends on both the Energy Reallocation Mechanism (MRE) and the spot price (PLD). This text presents the influences of some components in spot market incomes and a model to alocate the assured energy along the year since this is the main factor influencing the MRE and the spot market revenues. The model was formulated and implemented in a computational tool using Genetic Algorithms (AG) to minimize the expected losses and the sazonal risk.
68

Avaliação do impacto de motores de indução trifásicos em redes de distribuição de energia elétrica e uma proposta de regulamentação para seu acesso às redes de baixa tensão. / Evaluation of the impact of induction motors in electrical distribution networks and a regulation proposal to their access to low voltage networks.

Tania Paola Ledesma Arango 01 September 2009 (has links)
Este trabalho tem por objetivo apresentar e discutir alguns modelos desenvolvidos para a avaliação do impacto de motores de indução trifásicos nas redes de distribuição de energia elétrica partindo de seus dados de placa e utilizando algoritmos evolutivos para o cálculo dos parâmetros elétricos do circuito equivalente do motor. A discussão é de fundamental importância, na medida em que as distorções na onda de tensão impactam diretamente na qualidade do suprimento promovida por uma concessionária de energia elétrica, a qual deve fornecer aos seus consumidores uma tensão puramente senoidal, com amplitude e frequência constantes. Destaca-se a importância da representação de alguns aspectos específicos na avaliação do impacto de motores trifásicos na rede de distribuição. Por exemplo, a representação correta dos motores de indução na sua partida permitirá a identificação de afundamentos momentâneos de tensão tanto em pontos da rede secundária quanto da rede primária. Este trabalho apresenta o modelo de representação do motor de indução e dos elementos constituintes das redes de baixa e média tensão, incluindo os transformadores de distribuição, que possibilitam a análise do impacto desta carga perturbadora em toda a cadeia da rede, partindo-se do ponto de ligação do equipamento e analisando-se, dependendo do caso, a rede secundária, transformador de distribuição, rede primária e subestação de distribuição. Com o módulo computacional desenvolvido a partir da metodologia proposta neste trabalho, foi possível propor critérios bem definidos para avaliar se a partida de motores causa algum prejuízo para a rede de baixa tensão e/ou aos demais consumidores. Foi apresentado um método detalhado e um método expedito que permitem avaliar a viabilidade da instalação de um motor em uma determinada barra dependendo de sua potência, da potência nominal do transformador de distribuição e da sua distância até o transformador. Os critérios e os métodos estabelecidos neste trabalho constituem-se em uma proposta de regulamentação para o acesso de motores de indução à rede de baixa tensão e representam a segunda grande contribuição deste trabalho. / Much research is currently being conducted on the subject of Power Quality in electrical systems. This stems from the widespread use of polluting devices that introduce distortions on voltage waveforms so these become increasingly different form pure sinusoidal. At the same time, there has also been an increase on the use of sensitive equipment that cannot operate properly when fed by a non-sinusoidal source. This work focuses on the development of a few models aimed at evaluating the impact of electrical motors on electricity distribution networks. Motors have a direct impact on the quality of electrical energy provided to the networks customers, mainly owing to voltage sags during the motors startup. A detailed representation of all components (motors, primary circuits, distribution transformers and secondary circuits) has been developed. This allows a precise identification of critical points of the distribution system as to voltage sags. The first important contribution of this work refers to the computation of the motors equivalent circuit from its rated data using evolutionary algorithms. With these models, two different methods for evaluating the impact of the connection of a motor at a given load point were developed. These methods take into account the motors rated power, the distance between the distribution transformer and the load point, and the transformers rated power. The methods constitute a proposal for a regulatory framework within this subject, and they represent the second major contribution of this work.
69

Proposta de aperfeiçoamento da metodologia dos leilões de comercialização de energia elétrica no ambiente regulado: aspectos conceituais, metodológicos e suas aplicações / Proposal for Improving Methodology of Regulated Electricity Procurement Auction: Concepts, Methodologies, and Their Applications

Erik Eduardo Rego 05 November 2012 (has links)
Este trabalho analisou os leilões de comercialização de energia elétrica no ambiente de contratação regulada no Brasil, realizados entre 2005 e 2011, com o objetivo de propor aperfeiçoamentos em sua metodologia. Para tanto, foram estudadas três linhas de pesquisa: teoria de leilões, internalização (adicionais) de custos não privados (externalidades) e organização de mercados de capacidade. Após a análise dos 21 leilões de novos empreendimentos realizados no período, conclui-se que o desenho do leilão com fase discriminatória final é adequado aos objetivos de modicidade tarifária, mas que também permite melhoras. As fraquezas da sistemática atual identificadas foram: metodologia de contratação termelétrica por disponibilidade, com viés das fontes de maior custo variável unitário, adoção de preço-teto nem sempre adequado, dificuldade em mitigar o exercício de poder de mercado da Eletrobras nos leilões de energia existente e licitação pelo custo econômico privado. De forma a aprimorar os leilões, as seguintes ações foram sugeridas: realização de uma etapa adicional e prévia ao desenho de leilão híbrido atual visando contornar a problemática de estabelecimento de preço-teto adequado; utilização de adicionais ao lance do leilão para internalizar os custos de transmissão não recolhidos pelo gerador; substituição do mecanismo de contratação termelétrica pelo modelo Colombiano de opções; condução de leilões de energia nova e existente em conjunto, e segmentação de produtos no leilão pela ótica da demanda com possibilidade de lances em pacotes. Com a adoção destas propostas entende-se que o valor negociado nos leilões de comercialização de energia elétrica refletirão melhor o custo social dos projetos, aumentando a eficiência dos certames. / This study analyzes the regulated electricity procurement auctions conducted between 2005 and 2011 in Brazil, in order to propose improvements in its methodology. Thus, it was reviewed three research areas: auctions design, internalization of externalities, and capacity markets. After analyzing the 21 new energy auctions that period, it is concluded the auction design with a second discriminatory bid is appropriate to the aims at achieving as low as possible prices, however there is room for improvement. Identified weaknesses are: (1) thermal availability capacity hiring method biased in favor of energy sources with higher variable costs; (2) inadequate price cap, unable to mitigate Eletrobras market power in existing power auctions, (3) and bidding by private economic cost. So, it is suggested the following actions to improve the efficiency of energy auctions: (a) carrying out an additional step prior to the current hybrid auction design in order to solve the problem of establishing appropriate ceiling price; (b) use of additional to internalize transmission costs not paid by generator; (c) replacement of the bid mechanism used for thermal power plants to Colombian options model; (d) driving new and existing energy auctions together, and (e) segment auctions products by the demand side with the possibility of bidding in packages. In adopting these proposals it is expected the value traded in the electricity procurement auction conducted in Brazil will better reflect the social cost of projects and so improving its efficiency.
70

Análise do desempenho de reservatório de uso múltiplo : estudo de caso na sub-bacia Billings

Risso, Shevine Silva Oliveira January 2017 (has links)
Orientadora: Profa. Dra. Patrícia Teixeira Leite Asano / Dissertação (mestrado) - Universidade Federal do ABC. Programa de Pós-Graduação em Energia, 2017. / As consequências do desenvolvimento econômico, em especial, o aumento da intensidade e variedade dos usos dos recursos hídricos promove o desequilíbrio entre a demanda e a oferta de água, ocasionando conflitos entre usuários. O presente estudo investigou o desempenho do Reservatório Billings, que está inserido na bacia do Alto Tietê no Estado de São Paulo, e foi criado inicialmente, em 1927, para atender o abastecimento de energia elétrica de origem hidráulica, e que atualmente também é utilizado para atendimento do abastecimento público. Baseado neste contexto, buscou-se verificar o seu desempenho quanto ao atendimento do seu recurso água para atender as demandas de abastecimento urbano e de geração de energia concomitantemente. Sendo assim, para análise do desempenho do sistema Reservatório, foram adotados três cenários de operação para o Reservatório. No primeiro cenário, foram considerados diferentes valores de transferência de água para o Reservatório Billings, e adotou-se demanda consuntiva fixa. Para o segundo cenário, foram consideradas diferentes demandas consuntivas baseados nos valores adotados pelo Operador Nacional do Sistema elétrico brasileiro com ano-base 2016, e não se considerou a transferência de água. O terceiro cenário, foi considerada a proposta de utilização do reúso potável indireto da água, a fim de auxiliar na recarga do reservatório, e considerou diferentes demandas consuntivas, de modo semelhante ao segundo cenário. Com base nesses cenários, foram calculados os indicadores de desempenho estatísticos: confiabilidade, resiliência, vulnerabilidade, e o Índice de Sustentabilidade Hídrica para esse sistema. Os resultados obtidos para o desempenho do Reservatório Billings no Cenário 1, demonstraram que a medida que houve um incremento na transferência de águas, a confiabilidade, a resiliência e o índice de sustentabilidade hídrica do Reservatório aumentaram, e a vulnerabilidade no atendimento as demandas reduziram. Com o Cenário 2, o aumento da demanda hídrica, aliada a suspensão do bombeamento, levam a baixa confiabilidade, resiliência e redução da sustentabilidade hídrica, e consequentemente apresentou um aumento da vulnerabilidade do sistema. Por fim o Cenário 3, com o aumento do aporte de água advindo da água de reúso, trouxe uma melhoria no desempenho do Reservatório, de modo semelhante ao Cenário 1, aumento da confiabilidade, resiliência e sustentabilidade hídrica, com redução da vulnerabilidade, e com o benefício da redução dos impactos ambientais provindos do lançamento dos esgotos a Billings. Finalizando, pode-se observar a necessidade do aporte hídrico para o Reservatório Billings, no que tange ao atendimento às suas demandas e a sustentabilidade hídrica quando se adota o uso múltiplo da água. / The consequences of economic development, especially the increase in the intensity and variety of uses of water resources, promote the imbalance between demand and water supply, causing conflicts among users. The present study investigated the performance of the Billings Reservoir, which is located in the Alto Tietê basin in the State of São Paulo, and was initially created in 1927 to meet the supply of electric energy of hydraulic origin, Supply. Based on this context, it was sought to verify its performance regarding the attendance of its water resource to meet the demands of urban supply and energy generation concomitantly. Thus, to analyze the performance of the Reservoir system, three operating scenarios were adopted for the Reservoir. In the first scenario, different values of water transfer were considered for the Billings Reservoir, and fixed consumptive demand was adopted. For the second scenario, different consumptive demands were considered based on the values adopted by the National Operator of the Brazilian Electrical System with base year 2016, and water transfer was not considered. The third scenario was considered the proposal to use the indirect drinking water reuse in order to help recharge the reservoir, and considered different consumptive demands, similar to the second scenario. Based on these scenarios, the statistical performance indicators were calculated: reliability, resilience, vulnerability, and the Water Sustainability Index for this system. The results obtained for the performance of the Billings Reservoir in Scenario 1, showed that as the water transfer increment increased, the reliability, resilience and water sustainability index of the Reservoir increased and the vulnerability in meeting the demands reduced. With Scenario 2, the increase in water demand, coupled with the suspension of pumping, leads to low reliability, resilience and reduction of water sustainability, and consequently increased vulnerability of the system. The Scenario 3, with the increase of the water supply coming from the reuse water, brought an improvement in the performance of the Reservoir, similar to Scenario 1, increasing reliability, resilience and water sustainability, with reduction of vulnerability, and with The benefit of reducing environmental impacts from the sewage system to Billings. Finally, it is possible to observe the need of the water supply to the Billings Reservoir, in terms of meeting its demands and water sustainability when adopting the multiple use of water.