• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Exploring Lean Practices in Commercial Construction Projects / Utforskning av leanverktyg i kommersiella byggprojekt

Shakarchi, Ahmad, Fadhil, Daniel January 2021 (has links)
Lean construction is often suggested as way of enhancing the productivity of the construction industry. There are no clear definitions of lean construction, but it is often referred to as a construction management philosophy that aims to minimize waste and maximise customer value. Adopting lean construction in a project can be difficult and there are several critical factors for successful implementation; one of which is the use of lean construction practices. Lean construction practices are tools, techniques and strategies through which the principles of lean construction can be implemented. It has been pointed out that there is lack of information on the number of existing practices and their exact area of use. This master thesis report identified lean practices that have been implemented in commercial construction projects, and categorised them according to the phases of lean construction. The report also explored which lean production-planning-and-control- practices have been adopted by a commercial construction contractor. To identify the lean practices, a literature analysis was conducted based on the documents reviewed by Babalola et al. (2019) in their article ‘Implementation of lean practices in the construction industry: A systematic review’. This revealed 22 different lean practices that have been implemented in commercial construction projects, with the Last Planner System having been reported the most followed by Just in Time and Pull Scheduling. The literature analysis also resulted in the project delivery stages in which each identified practice had been adopted. This helped categorise the practices according to the phases of lean construction. The phases were defined by the conceptual framework ‘The Lean Project Delivery System’ as Project Definition, Lean Design, Lean Supply, Lean Assembly and Lean Use. The categorisation showed that (out of the 22 identified practices) 3 practices belong to the phase Project Definition, while 8, 9, 15 and 0 practices belong to the other phases respectively. To explore which lean production-planning-and-control-practices have been adopted by a commercial construction contractor, a case study was conducted of the production phase of a large-sized project referred to as Project X. Seven members of the production team were interviewed as to reveal the contractor’s working methods in the planning and control of production in terms of time, activity and logistics. The revealed working methods were then compared to 9 out of the 22 identified lean practices, since they were interpreted as production-planning-and-control-practices. This analysis showed that six of those practices were seemingly implemented in the production of Project X, while one was partially implemented and two were not implemented. / Lean byggproduktion föreslås ofta som ett sätt att öka produktiviteten i byggbranschen. Det finns inga tydliga definitioner av lean byggproduktion, men konceptet beskrivs ofta som en filosofi för byggledning som ämnar minimera avfall och maximera kundvärdet. Att anta lean byggproduktion i ett projekt kan vara svårt och det finns ett antal kritiska faktorer för lyckad implementering, varav en är användandet av lean byggverktyg. Lean byggverktyg är verktyg, tekniker och strategier genom vilka principerna av lean byggproduktion kan implementeras. Det har påpekats att det finns brist på information om antalet befintliga lean byggverktyg och deras användningsområden. Denna rapport identifierade lean verktyg som har implementerats i kommersiella byggprojekt, och kategoriserade de enligt faserna av lean byggproduktion. Rapporten utforskade också vilka lean verktyg för planering och styrning av produktion som har antagits av en kommersiell byggentreprenör. För att identifiera leanverktyg i kommersiella byggprojekt så genomfördes en litteraturanalys baserat på de dokument som granskats av Babalola et al. (2019) i deras artikel ‘Implementation of lean practices in the construction industry: A systematic review’. Detta avslöjade 22 olika lean byggverktyg som implementerats i diverse kommersiella byggprojekt, där Last Planner System har rapporterats mest följt av Just in Time och Pull Scheduling. Litteraturanalysen resulterade också i projektleveransstadierna där varje identifierat verktyg hade implementerats. Detta hjälpte att kategorisera verktygen enligt faserna av lean byggproduktion. Faserna definierades av det konceptuella ramverket ’The Lean Project Delivery System’ som Project Definition, Lean Design, Lean Supply, Lean Assembly och Lean Use. Kategoriseringen visade att (utav de 22 identifierade verktygen) 3 verktyg tillhör fasen Project Definition, medan de resterande faserna innefattar 8, 9, 15 respektive 0 verktyg. För att utforska vilka lean verktyg för planering och styrning av produktion som har antagits av en kommersiell byggentreprenör så utfördes en fallstudie av produktionsfasen av ett stort projekt såkallat Projekt X. Sju medlemmar av produktionsteamet intervjuades för att uppenbara entreprenörens arbetsmetoder vid planering och styrning av produktion beträffande tid, aktivitet och logistik. De uppenbarade arbetsmetoderna jämfördes sedan med 9 av de 22 identifierade leanverktygen eftersom just de tolkades som verktyg för planering och styrning av produktion. Denna analys visade att sex av dessa verktyg var till synes implementerade i produktionen av Projekt X, medan en var delvis implementerad och två inte alls implementerade.

Page generated in 0.1569 seconds