1 |
Racionalizace výroby a kontroly vřeten vodárenských armatur / Redeployment and verification spindles water supply river armoursJelínek, Norbert January 2009 (has links)
Solving problems of production and calibration spindles water supply river armours by the help of method SPC. Analysis capability of gauge by the help of methodists MSA-Cg,Cgk. Evaluation capability of machanical abnd digital outside micrometer. Verification limiting deviation of micrometrical screw in among - calibration interval. Attestation capability of machine and of the process. Construction of regulation diagram. Project of new control instruments. Technically-economic evaluation:savings 110 560,00Kč, profitability 764,85%, economic return 0,13 year. Successful application of methodists SPC attested by document about adjustability of the process.
|
Page generated in 0.0742 seconds