• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1075
  • 528
  • 500
  • 203
  • 80
  • 52
  • 48
  • 42
  • 39
  • 35
  • 26
  • 21
  • 20
  • 10
  • 8
  • Tagged with
  • 3001
  • 3001
  • 527
  • 372
  • 343
  • 334
  • 326
  • 322
  • 319
  • 316
  • 304
  • 248
  • 244
  • 241
  • 240
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
451

Effective shutdown maintenance project management

Klingenberg, Bernard Ekhard January 1986 (has links)
Shutdown maintenance projects are an intergral part of any plant maintenance system. When a plant is shutdown, production stops and major maintenance work and modification of components is carried out. Whatever the size and scope of the shutdown, component project management. is vital if the shutdown project is to be completed successfully. This autnor has found that there is little or no literature available that treats shutdown maintenance projects as a complete study. The study of the management organisation and structure, as well as the associated resources and services required by a shutdown project manager has been neglected. The aim of this thesis project is to research and investigate shutdown maintenance and to present it as a complete study. All the aspects of shutdown maintenance project management are dealt with. This is done in tne following way. Shutdown maintenance is defined with specific objectives. Then the management organi sati on. and structure, as well as the resources and services required for shutdown projects are discussed. The shutdown project management procedure and techniques are dealt with next, and finally there is a section on the effect of condition based maintenance on shutdown maintenance projects. This thesis project serves to provide a complete perspective on snutdown proJects where this was found to be lacking in previous literature on maintenance management. This thesis provides a useful source of instruction and information to an engineer who for the first time has been given a shutdown project to complete.
452

Využití nástrojů projektového managementu při řízení IT projektů / The Use of Metohods of the Project Management in IT Projects

Svobodová, Sára January 2019 (has links)
In diploma thesis I deal with project proposal for selected company using theoretical knowledge, methods and tools of project management. The first part describes the basic terms of the project and project management, and then the project phases. In the second part of the thesis I deal with the analysis of the company and continue with the proposal of the project of the implementation of the active access node in a particular place of the network.
453

Aplikace metodiky PRINCE2 / Application of the PRINCE2 Methodology

Cagalová, Eva January 2018 (has links)
The aim of this diploma thesis is to improve onboarding project management by identifying the differences between PRINCE2® methodology and existing transition process of the company. Found differences will be the baseline for new proposals that should make the project management more efficient by cost and time savings. These proposals are intended to rise the level of client‘s satisafacion, which would lead to the possibility of receiving higher volumes of new projects.
454

Project Time and Cost Control Using Building Information Modeling

Zhang, Dalu January 2013 (has links)
Although the construction industry has been evolving for centuries and researchers have been seeking innovative solutions for decades, diverse challenges still exist in making the construction process faster, safer, cheaper and more accurate. It is believed that Building Information Modeling (BIM) can lead to greater efficiency through the incremental collaboration. The data in BIM system is extremely useful and can be generated to optimize the project delivery processes. However, since BIM increases the project design cost and requires a big learning curve, project participants are concerned about the cost of project, which has hindered the adoption of BIM for the project delivery. This paper, using a case study, describes how BIM functions to help cut down costs, optimize schedule, and benefit the project participants. The analysis of project cost and time control focuses on life cycle. The recommendations for the future use of BIM are made generally.
455

Řízení projektu financovaného grantovým programem / Managing Grant Funded Projects

Machala, Michal January 2010 (has links)
This diploma thesis deals with the managing grant funded project of “Renewal of the nature trail Baba“.
456

Designing a Procurement Management Model to Reduce Project Delays in a Hydraulic and Automation Systems Company

Vereau, Melanie, Rojas, Jose, Aderhold, Daniel, Raymundo, Carlos, Dominguez, Francisco 01 January 2020 (has links)
El texto completo de este trabajo no está disponible en el Repositorio Académico UPC por restricciones de la casa editorial donde ha sido publicado. / This study focuses on the factors that cause project delays in an industrial hydraulic company. More specifically, the article also addresses the development of on-demand engineered products and the impact of the procurement process on delays. As part of the investigation, the authors assessed the historical data of the projects completed in 2017 before determining the critical path for each project in an attempt to identify which project stages may be improved. After further assessing the resulting data, the planning and procurement procedures were deemed as requiring improvement. Next, the article proposes a training plan and new procedures based on the Project Management Body of Knowledge guidelines for Engineer-to-Order projects. In conclusion, the results showed that delays were effectively reduced after implementing these new procedures in both Project Management stages.
457

Hybrid Projects’ Success Factors in Physical Product Development : An exploratory qualitative study from the project manager’s perspective

Carlsson, Simon, Kyrk, Erik January 2021 (has links)
Background: During the last decades there has been a rapid increase in the desire of being more flexible and responsive, which has paved the way for Agile Project Management – APM. As a consequence of implementing APM into environments previously defined as traditional, it has opened up a discussion of merging APM with Traditional Project Management – TPM. This combination of methodologies is referred to as Hybrid Project Management – HPM, whose aim is to leverage benefits from both APM and TPM. Purpose: Prior research has failed to keep up with this trend. Those that have shed light on this phenomenon have failed to realize the differences between IT and non-IT sectors. With this in mind, and the call for including managers’ perspective on HPM, this study has investigated project managers’ experiences and perceptions of factors that influence hybrid project success in physical product development. In order to address this purpose this study has also investigated how project managers perceive project success. This was done since one must first determine what constitutes project success in order to identify what factors that could bear a potential influence on it. Method: From an interpretivist philosophical standpoint this, exploratory and inductive, study has been carried out through semi-structured interviews with experienced project managers within HPM. Inspired by Grounded Theory, this study has employed purposive sampling and analyzed the data through a grounded analysis technique. Conclusion: This research has successfully identified a range of various factors that influence hybrid projects’ success. Based upon this, a model exhibiting the factors influencing hybrid projects in physical product development could be constructed, as well as a model depicting how project managers perceive hybrid project success. It was found that there is a constant tension between the TPM and APM when merging the two. Instead of identifying one way to optimize the hybrid project, it is more or less about managing this balance between APM and TPM practices. It was also found that project success is a dynamic and subjective concept, rather than the static and additive concept that is often illustrated by contemporary research.
458

Managing the Project Management Process

Czuchry, Andrew J., Yasin, Mahmoud M. 01 January 2003 (has links)
The effective executive operating in today's global environment must formulate, operate and execute across multi-faceted environmental and organizational modes for different projects throughout their distinct phases in order to achieve results that meet shareholder expectations. In this study, the authors draw on a stream of research dealing with domestic and international project managers as well as the practical experience of the lead author to provide an informational integrated approach to help senior executives and project managers manage the strategic and operational facets of different projects. In this context, a practical roadmap for identifying problems and implementing timely corrective actions to improve projects' success Is advocated by this study.
459

Strategies Construction Project Managers Use to Create Environmental Sustainability in Construction Projects

Branch, Harold Kenneth 01 January 2018 (has links)
Senior construction project managers who fail to create strategies for environmental sustainability risk losing their competitive advantage in the business environment. Based on stakeholder theory, the purpose of this multiple case study was to explore the strategies that senior project managers use to implement environmental sustainability in their construction projects. Data were obtained from semistructured interviews with 4 senior project managers from 4 construction companies located in the midwestern region of the United States who implemented environmentally sustainable practices in their project processes. The data analysis process included methodological triangulation. The interviews were transcribed, interpreted, and coded to generate themes, which were validated through member checking and archival documentation. The centralized themes included (a) stakeholder engagement, (b) terminology, and (c) cost. Construction projects require the use of appropriate strategies for implementation of environmental sustainability in their project processes, lest project failure occurs. The use of stakeholder engagement principles, to strengthen environmental sustainability interests, creates shared concern and helps generate a roadmap for using environmentally sustainable business strategies. The implications for positive social change include the potential to affect business practices by contributing new knowledge to develop strategies that project managers can use for implementing environmentally sustainable practices. Environmentally sustainable construction practices will enhance the social practice of caring for the environment and create health and well-being.
460

Project Management in Instructional Design

Allen, Shamon A. 18 December 2020 (has links)
No description available.

Page generated in 0.1775 seconds