Vila Olímpia (1986-2012): parcerias público-privadas na construção do espaço urbanoMungai, Daniela Hummel 04 February 2013 (has links)
Made available in DSpace on 2016-03-15T19:22:09Z (GMT). No. of bitstreams: 1
Daniela Hummel Mungai.pdf: 4386470 bytes, checksum: ca219ba135089a85d3f55cf4179b89b6 (MD5)
Previous issue date: 2013-02-04 / The research deals with possibilities of developing urban projects in São Paulo through public-private partnerships, drawing a parallel with those implemented in the socioeconomic context of the central countries. When browsing for some urban instruments used by various municipal administrations of São Paulo since the late eighties, which are based on public-private partnerships and that led to the consolidation of the district of Vila Olímpia in an important business center of the capital, the work questions this mode of producing the city only by normative view regarding the construction of urban spaces. Thus, the impacts on that area are evaluated here. Then, when analyzing a project developed by the private sector for urban improvements in the neighborhood, the work provides insight into the positioning of the business elites in urban governance and its role in relation to changes in urban form that have been occurring in the region. / A pesquisa trata de possibilidades de desenvolvimento de projetos urbanos em São Paulo por meio das Parcerias Público-Privadas, traçando um paralelo com aqueles implementados no contexto socioeconômico dos países centrais. Ao percorrer por alguns instrumentos urbanísticos aplicados por diversas gestões municipais paulistanas desde o final da década de 1980, que são baseados em Parcerias Público-Privadas e que levaram à consolidação do bairro da Vila Olímpia em um importante centro de negócios da capital, o trabalho questiona o modo de produzir a cidade apenas pela visão normativa em relação à construção de espaços urbanos. Sendo assim, os impactos causados sobre aquele território também são aqui avaliados. Em seguida, ao analisar um projeto elaborado pelo setor privado para melhorias urbanas no bairro, o trabalho oferece uma visão sobre o posicionamento das elites empresariais na governança urbana e sua atuação nas transformações em relação à forma urbana que vêm ocorrendo na região.
|
182 |
Bureaucratisation néolibérale dans le développement : la gouvernance des partenariats public-privé Euro-Méditerranéens pour les énergies renouvelables au Maroc / Neoliberal Bureaucratisation in Development : The Governance of Euro-Mediterranean Public-Private Partnerships for Renewable Energy in MoroccoGerin-Jean, Marie 21 September 2018 (has links)
Cette thèse propose une étude de la transformation de l’État et de l’exercice du pouvoir à partir de l’observation des instruments politiques utilisés pour construire les grandes centrales solaires marocaines. Ce travail s’appuie sur deux longues observations participantes, consistant en une double ethnographie du développement dans l’institution publique bénéficiaire de l’aide ainsi que dans les institutions qui contrôlent cette aide. Je mobilise simultanément la sociologie de l’action publique et les études en sciences de gestion et en sociologie économique sur la finance et les Partenariats Public-Privé. La contractualisation des Partenariats Public-Privé semble devenir un nouveau mode d’action publique pour l’aide au développement. Or, le choix d’un type de contrat, d’un type de mode de financement, sont également des choix politiques. Les politiques euro-méditerranéennes pour les énergies renouvelables étudiées dans cette thèse illustrent un glissement des politiques publiques stato-centrées vers une action publique multiacteurs. L’analyse de la fabrication des outils et instruments du Plan Solaire Méditerranéen met en lumière un mode de gouvernance basé sur le consensus et sur l’expertification. La charpente de l’action publique pour les énergies renouvelables au Maroc est édifiée autant par les acteurs privés que publics et entraîne la diffusion des formalités issues des grandes entreprises et du marché financier. Sous l’impulsion de ces acteurs, le secteur de l’énergie solaire du Maroc s’institutionnalise à partir des années 2009 en s’inscrivant dans un processus de bureaucratisation néolibérale. Lors de cette institutionnalisation, les bailleurs de fonds et les consortiums privés véhiculent, à travers leurs expertises et leur participation à l’action publique, plusieurs instruments politiques. Cette instrumentation passe par les appels d’offres concurrentiels et internationaux, les prêts d’aide au développement économique ou issus des fonds de lutte contre le changement climatique, et enfin les solutions contractuelles comme le Partenariat Public-Privé. La synergie entre les instruments de l’aide au développement et les politiques pour les énergies renouvelables entraîne une transformation des modes de gouvernement et du rôle de l’État. L’utilisation de ces instruments de l’aide au développement et de l’expertise privée permet la régulation et le contrôle bureaucratique, au sens wébérien, du marché de l’énergie solaire. La politique de transition énergétique marocaine participe au renforcement des monopoles dans le secteur de l’énergie marocain et à sa centralisation. / This thesis proposes a study of State transformation and of the exercise of power from the observation of political instruments used to develop the big Moroccan solar power plants. This work is based on two long participative observations, which consist of a double ethnography of development in the public institution beneficiary of the aid as well as in the institutions that control this aid. I summon up both public policy sociology and studies in management and in economic sociology on finance and Public - Private Partnerships. The Public – Private Partnership contractualisation seems to become a new mode of public policy in favour of aid to development. Besides, the choice of a type of contract, of a type of mode of financing, are political choices as well. Euro-Mediterranean policies for the renewable energy studied in this thesis illustrate a shift of state-centered public policies towards a multilevel public policy. The analysis of the making of tools and instruments of the Mediterranean Solar Plan highlights a mode of governance based on consensus and expertification. The framing of the public policy for renewable energy in Morocco is erected by private and public actors and leads to the diffusion of the formalities coming from big companies and from the financial market.Compelled by these actors, the Moroccan solar energy market has been institutionalized since 2009, in keeping with a process of neoliberal bureaucratization. In this institutionnalisation, international financial institutions and private consortiums convey, through their expertise and their participation to public policy, many political instruments. This instrumentalization goes through competitive and international calls for tender, loans for economic development aids, or climate change funds, and at last contractual solutions such as Public-Private Partnership. The synergy between aid to development instruments and the policies in favour of renewable energylead to a transformation of the modes of government and of the role of State. The use of these aids to development and private expertise instruments allows bureaucratic regulation and control, as Weber says, of the solar energy market. The Moroccan energetic transition policy takes part to the strengthening of monopolies in Moroccan energy and to its centralization.
|
183 |
Indirect Expropriations in Investment As a Result of the Exercise of the Regulatory Power and its Relationship with the Patrimonial state Liability of the Public Administration / Las Expropiaciones Indirectas en Materia de Inversiones Como Consecuencia del Ejercicio de la Potestad Regulatoria y su Relación con la Responsabilidad Patrimonial de la Administración PúblicaTerrazos Poves, Juana Rosa, Cabrera Gómez, Enrique Jesús 10 April 2018 (has links)
In this article the authors highlight the promotion of private sector participation in infrastructure development for the provision of public services, through joint actiondesigned for the private and public sector instruments. Under that context, they take asa starting point the figure of corporate governance, as an efficient state action, because itinvolves a change in the conception of the state and non-state roles in investment in publicservices, considering the actors public and private, as a cooperating conjunction with theformulation and implementation of public policies.In this context, the authors develop and analyze pending tasks in the exercise of regulatoryauthority and its relation to the patrimonial liability of the State, which in their view must also be taken into account for the effectiveness of corporate governance. / En el presente artículo, se destaca el fomento de la participación del sector privado en el desarrollo de infraestructura para la prestación de servicios públicos, a través de instrumentos ideados para una actuación conjunta de los sectores privado y público. Bajo ese contexto, toman como punto de partida a la gobernanza corporativa como una actuación eficiente del Estado, en tanto implica una variación de la concepción de los roles estatales y no estatales en materia de inversión en la prestación de servicios públicos, considerando a los actores públicos y privados como una conjunción cooperante con la formulación y la ejecución de políticas públicas.En ese contexto, los autores desarrollan y analizan tareas pendientes en materia del ejercicio de la potestad reguladora y su relación con la responsabilidad patrimonial del Estado que, desde su perspectiva, deben también tenerse en cuenta para la efectividad de la gobernanza corporativa.
|
184 |
Privatiser la nature : espaces protégés, partenariats public-privé et contrôle territorial au Chili. Le cas du Parc national Alerce Costero et de la Réserve Côtière Valdivienne. / Privatise nature : protected areas, public-private partnerships and territorial control in Chile. The case of the Alerce Costero National Park and the Valdivian Coastal Reserve. / Privatizar la naturaleza : áreas protegidas, cooperación público-privada y control territorial en Chile. El caso del Parque Nacional Alerce Costero y de la Reserva Costera Valdiviana.Rees catalan, Andrés 05 March 2018 (has links)
La protection privée de la nature est un phénomène qui rencontre un succès majeur ces dernières décennies dans le contexte d’ouverture croissante des politiques environnementales à l’économie mondialisée. Le Chili compte précisément parmi les premiers pays à avoir appliqué les principes néolibéraux au niveau de l’État ; il a privatisé de nombreux domaines de l’économie, dont l’accès aux ressources naturelles. Ces dernières ont été, de ce fait, largement exploitées par des capitaux privés qui ont disposé de grandes libertés garanties par l’État. Et même si la protection de la nature est longtemps restée du seul ressort de l’État chilien, on constate à partir de l’année 1990 et la prise de pouvoir du premier gouvernement démocratique post-Pinochet l’émergence croissante des acteurs privés de protection de la nature, dont des ONG environnementalistes nationales et internationales. Ces ONG ont fortement promu et utilisé des outils du libre marché (acquisitions foncières, expertise scientifique, partenariats public-privé, marchés carbone) dans un but affiché de conservation des ressources naturelles. Elles interviennent même, plus récemment, dans les politiques de développement local. Cette recherche entend démontrer, à travers l’exemple du travail conjoint mené par les administrateurs de deux espaces protégés – l’un public, l’autre privé – la manière dont une ONG internationale de conservation exerce son action dans un pays comme le Chili. Il ne s’agit pas uniquement d’enjeux de protection de la nature, de conservation des ressources naturelles et de développement local, mais aussi des méthodes d’intervention auprès des acteurs ruraux et des dispositifs de pouvoir déployés dans un objectif de contrôle territorial. / Private nature conservation is a growing phenomenon against the background of the opening up of environmental policies to globalized economy. Chile is one of the first countries to have implemented neoliberal principles at State level; it has privatized many areas of its economy, including access to natural resources. As a result, those resources have been largely exploited by private capital, with the greatest freedoms guaranteed by the State. Even within nature conservation – which has long remained under the sole responsibility of the Chilean state – we can see from 1990 onwards, and the takeover of the first post-Pinochet democratic government, the increasing emergence of private actors of nature protection, including national and international environmental NGOs. These NGOs have strongly promoted and used free-market tools (land acquisitions, scientific expertise, public-private partnerships, carbon markets) with the aim of natural resources conservation. More recently, they also started to take part in local development policies.This research aims at demonstrating, through the example of the joint work carried out by the administrators of two protected areas - a public one and a private one - the way an international conservation NGO exerts its action in a country like Chile. Therefore, the main issues of this research are not only nature conservation, natural resources preservation and local development, but the interference with rural stakeholders and the power apparatuses that are deployed to gain territorial control at local level. / La protección privada de la naturaleza es un fenómeno que ha tenido gran éxito durante las últimas décadas en el contexto de la apertura creciente de las políticas medioambientales a la economía globalizada. Chile forma parte de los primeros países en haber aplicado los principios neoliberales a nivel de Estado; privatizó muchas áreas de la economía, dentro de las cuales el acceso a los recursos naturales. Por este motivo, los recursos naturales fueron intensamente explotados por capitales privados que beneficiaron, además, de grandes libertades garantizadas por el Estado. A pesar de que la protección de la naturaleza estuvo durante mucho tiempo bajo la sola responsabilidad del Estado chileno, a partir del año 1990 y la llegada al poder del primer gobierno democrático post-Pinochet, se observa un aumento creciente de los actores privados de la protección de la naturaleza, dentro de los cuales ONG medioambientalistas nacionales e internacionales. Estas ONG han promocionado y utilizado las herramientas de libre mercado (adquisición de tierras, conocimiento científico, cooperación público-privada, mercados de carbono) con el objetivo de conservar los recursos naturales. De manera más reciente, intervienen incluso en las políticas de desarrollo local.Esta investigación busca demostrar, mediante el ejemplo del trabajo conjunto llevado a cabo por los administradores de dos áreas protegidas – un pública, la otra privada – la manera como una ONG internacional de conservación ejerce su acción en un país como Chile. No se trata únicamente de desafíos de protección de la naturaleza, de conservación de los recursos naturales y de desarrollo local, sino que también de los métodos de intervención con los actores rurales y de los dispositivos de poder utilizados con un objetivo de control territorial.
|
185 |
As taxas de retorno dos projetos de concessão e PPP do setor de rodoviasIto, Minoru 26 February 2015 (has links)
Submitted by Minoru Ito (minoruito@gmail.com) on 2015-02-26T16:18:44Z
No. of bitstreams: 1
Minoru Ito - Dissertação.pdf: 3146333 bytes, checksum: 2be44b6347010be421091aa520f3aef9 (MD5) / Approved for entry into archive by Marcia Bacha (marcia.bacha@fgv.br) on 2015-03-02T19:32:52Z (GMT) No. of bitstreams: 1
Minoru Ito - Dissertação.pdf: 3146333 bytes, checksum: 2be44b6347010be421091aa520f3aef9 (MD5) / Approved for entry into archive by Marcia Bacha (marcia.bacha@fgv.br) on 2015-03-02T19:33:16Z (GMT) No. of bitstreams: 1
Minoru Ito - Dissertação.pdf: 3146333 bytes, checksum: 2be44b6347010be421091aa520f3aef9 (MD5) / Made available in DSpace on 2015-03-02T19:33:33Z (GMT). No. of bitstreams: 1
Minoru Ito - Dissertação.pdf: 3146333 bytes, checksum: 2be44b6347010be421091aa520f3aef9 (MD5)
Previous issue date: 2015-02-26 / As concessões e as Parcerias Público-Privadas (PPP) são mecanismos cada vez mais utilizados pelo setor público para alavancar os investimentos em infraestrutura no país. Para que haja viabilidade econômica das mesmas, as suas taxas internas de retorno (TIR) apresentam-se como variáveis que precisam refletir os riscos e a realidade do negócio. O presente estudo busca analisar as taxas de retorno utilizadas para a modelagem das tarifas-teto do setor de rodovias federais frente às especificidades do seu mercado. Para tal, são seguidas três frentes: a primeira é analisar a metodologia da taxa de retorno utilizada para a modelagem das concessões mais recentes de rodovias; a segunda é estimar uma taxa de retorno a partir de pesquisa bibliográfica; e a terceira é, por meio de dados de rentabilidade de balanços de concessionárias do setor, observar se as taxas de retorno das primeiras concessões foram devidamente calculadas na época. Na dissertação, concluímos que a atual metodologia da taxa de retorno do Tesouro Nacional pode ser aprimorada, principalmente em relação aos parâmetros de grau de alavancagem e capital de terceiros, e observamos que a taxa de retorno tem se aproximado do custo de oportunidade do setor ao longo das últimas etapas de concessão. O estudo visa contribuir para o debate sobre a rentabilidade dos projetos de infraestrutura rodoviária, em meio a um período de intensos investimentos no setor. / Concessions and Public-Private Partnerships (PPP) are mechanisms increasingly used by the public sector to enhance the investments in infrastructure in Brazil. To achieve economic viability in these projects, their internal rates of return (IRR) are variables which must reflect the risks and reality of the business. The present study seeks to analyse the IRRs used for modeling the price-caps of the federal highways’ sector, under the specificities of such market. For this purpose, three approaches are pursued: the first one analyses the methodology of IRR calculation applied for modelling the most recent highway concessions; the second estimates an IRR based on bibliographic research; and the third makes use of data acquired from the balance sheets from the sector`s concessionaries, to observe if the IRR for the f irst concessions of federal highways were properly calculated at the time. In this dissertation, we concluded that the current National T reasury´s methodology of the rate of return can be improved, especially in relation to parameters like leverage and debt, and we observed that the rate of return has come closer to the opportunity cost for the sector throughout the last concession rounds. This study aims to contribute to the debate on the profitability of road infrastructure projects, a midst a period of intense investments in the sector.
|
186 |
Avaliação do impacto da utilização de parceria público-privada para construção e operação de unidades municipais de educação infantil em Belo HorizonteRodrigues, Bruno da Costa Lucas 16 December 2015 (has links)
Submitted by Bruno da Costa Lucas Rodrigues (brunor270@gmail.com) on 2016-01-18T08:25:33Z
No. of bitstreams: 1
Dissertação Bruno Versão Final.pdf: 5963363 bytes, checksum: 8b1e0b7a0e8f5ae54f6183d793e06876 (MD5) / Approved for entry into archive by ÁUREA CORRÊA DA FONSECA CORRÊA DA FONSECA (aurea.fonseca@fgv.br) on 2016-02-01T19:28:30Z (GMT) No. of bitstreams: 1
Dissertação Bruno Versão Final.pdf: 5963363 bytes, checksum: 8b1e0b7a0e8f5ae54f6183d793e06876 (MD5) / Approved for entry into archive by Marcia Bacha (marcia.bacha@fgv.br) on 2016-02-11T13:08:07Z (GMT) No. of bitstreams: 1
Dissertação Bruno Versão Final.pdf: 5963363 bytes, checksum: 8b1e0b7a0e8f5ae54f6183d793e06876 (MD5) / Made available in DSpace on 2016-02-11T13:08:21Z (GMT). No. of bitstreams: 1
Dissertação Bruno Versão Final.pdf: 5963363 bytes, checksum: 8b1e0b7a0e8f5ae54f6183d793e06876 (MD5)
Previous issue date: 2015-12-16 / School Infrastructure Public-Private Partnerships (PPPs) are being increasingly used over the globe. However, the literature that analyzes the role and impact of PPP models in education is still incipient. The present study aims to contribute to the literature investigating the impact of a school infrastructure PPP contract used in municipal schools in Belo Horizonte. The methodology was based in the comparison of 46 schools under two models, being 27 schools under a PPP model and 19 schools built and operated under traditional public procurement model. The results show that the time to build schools under the PPP Model is 45% shorter and that 79% of the schools under traditional model were delivered out of the contracted term of 13 months, while all PPP units were delivered below this time. In the same vain, the satisfaction level regarding maintenance services is substantially higher under PPP than under traditional model. Specifically in relation to IT services it was not observed positive results for PPPs. Finally, principals in PPP schools have 25% more time to focus on pedagogical activities, as they spend less time with the management of non- pedagogical services. One limitation of this study is not to provide a comparative analysis between the two models in terms of costs. This study aims to contribute to the improvement of PPP regulatory models used in the education and to the discussion of the role that could be played by PPPs in the reduction of school infrastructure deficit. / As Parcerias Público-Privadas (PPP) de infraestrutura escolar são cada vez mais utilizadas no mundo, entretanto as avaliações de impacto desse modelo ainda são escassas. O presente estudo contribui para essa área do conhecimento ao avaliar o impacto da utilização de PPP tanto na construção como na operação das Unidades Municipais de Educação Infantil (UMEIs) de Belo Horizonte (BH). A metodologia de pesquisa foi baseada na comparação de 46 UMEIs, sendo 27 unidades de PPP e 19 unidades construídas e operadas no modelo tradicional de contratação pública. Em relação ao impacto na construção, os principais resultados são que o tempo de obra das unidades de PPP foi 45% menor e que 79% das unidades tradicionais foram entregues fora do prazo contratado de 13 meses, enquanto que nenhuma PPP foi entregue acima deste prazo. Além disso, a PPP permitiu aumentar a escala na construção das UMEIs, superando as limitações do modelo tradicional. Dentre as principais evidências encontradas quanto ao impacto na operação, pode-se citar que os diretores de unidades de PPP afirmam ter 25% mais tempo para focar nas atividades pedagógicas, pois gastam menos tempo na gestão dos serviços não pedagógicos, e que o grau de satisfação com os serviços de manutenção das instalações físicas é substancialmente maior nessas unidades. Os resultados positivos para PPP só não apareceram em relação aos serviços de manutenção de TI. Uma limitação deste trabalho foi não conseguir realizar a comparação de custos das duas modalidades. O estudo pretende contribuir para o aprimoramento dos modelos regulatórios de PPPs em educação e para a discussão sobre o papel que pode ser desempenhado pelas PPPs na redução do déficit de infraestrutura escolar.
|
187 |
A decision model for contracting out local government services in a South African contextSlot, Paul Johan 06 1900 (has links)
Business management / M. Com. (Business management)
|
188 |
AS PARCERIAS PÚBLICO-PRIVADAS NA EDUCAÇÃO INFANTIL: UM ESTUDO SOBRE A LAICIDADE DO ESTADO E A RELIGIOSIDADE DE INSTITUIÇÕES CONVENIADAS / Public private partnerships in early childhood education: study on the secular nature of the state and the religiosity of partner isntitutionsAlmeida, Volnei Bispo de 30 September 2014 (has links)
Made available in DSpace on 2016-08-03T16:15:46Z (GMT). No. of bitstreams: 1
VolneiAlmeida.pdf: 693595 bytes, checksum: 297eb1438887407b5a07b52ddd8e96f8 (MD5)
Previous issue date: 2014-09-30 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / One of the policies most used by the municipal public power to guarantee educational services to children 0-3 years and increasing the number of vacancies in kindergartens has been the adoption of partnerships through agreements with private institutions. Many questions emerge from this public policy, for example, the relationship between the secular state and the religiosity of many of these institutions. This study arose from the need to provide greater transparency and broaden the debate on the agreements between the municipal government and aid agencies, especially regarding the conflict between the public and the private, between the secular and the religious. This study aimed to investigate public-private partnerships and the possible impacts on the secular state and the right to education. The research problem posed was what the CME Paper 12/2011 revealed about the secular state and the religiosity of partner institutions in the care of early childhood education in São Bernardo do Campo. There was the assumption that the representation of a convening authority to the Municipal Board of Education on spiritual education express a possible religious education projection in public kindergarten. The theoretical discussion involved as authors FISCHMANN (2009), ARELARO (2008), SARMENTO (2006), ADRIÃO (2009), OLIVEIRA (2005) and ideas that dealt with the deformations of public and private interests, the supply of places following daycare, religious instruction in public schools. The methodology used was to analyze literature and documents. The literature shows a historical subordination of public early childhood education to private welfare and disputes over implementation of religious education in public basic education. The documents analyzed revealed that there may be some degree of involvement of the secular state when it formalizes partnerships with charities of religious origin, especially when evaluating the shortcomings and trends of management and supervision of agreements made by the government. It is believed that this study opens the doors to investigate policies and practices that are facing or stimulating religious education in public schools and covenanted day cares. / Uma das políticas mais utilizadas pelo poder publico municipal para garantir o atendimento educacional às crianças de 0 a 3 anos e a ampliação do número de vagas em creches, tem sido a adoção de parcerias por meio de convênios com instituições privadas. Muitas questões emergem desta política pública como, por exemplo, a relação entre a laicidade do Estado e a religiosidade de grande parte destas instituições. Este estudo surgiu da necessidade de se dar maior transparência e ampliar o debate sobre os convênios entre o poder público municipal e entidades assistenciais, principalmente, no que tange o embate entre o público e o privado, entre o laico e o religioso. Este trabalho teve como objetivo investigar as parcerias público-privadas e os possíveis impactos sobre a laicidade do Estado e o direito à Educação. O problema de pesquisa posto foi o que o Parecer CME 12/2011 revela sobre a laicidade do Estado e a religiosidade das instituições conveniadas no atendimento a educação infantil do município de São Bernardo do Campo? Havia a hipótese de que a representação de uma entidade conveniada ao Conselho Municipal de Educação sobre educação espiritual expressasse uma possível projeção de ensino religioso na educação infantil pública. A discussão teórica envolveu autores como FISCHMANN (2009), ARELARO (2008), SARMENTO (2006), ADRIÂO (2009), OLIVEIRA (2005) e ideias que tratavam das deformações dos interesses públicos e privados, da oferta de vagas no seguimento de creche, do ensino religioso em escola pública. A metodologia empregada foi analise bibliográfica e documental. A literatura aponta uma histórica subordinação da educação infantil pública à assistência social privada e as disputas pela implantação do ensino religioso na educação básica pública. Os documentos analisados revelaram que é possível haver certo grau de comprometimento da laicidade do Estado quando se formaliza parcerias com entidades assistenciais de origem religiosa, principalmente, quando se avalia as deficiências e tendências de gestão e supervisão dos convênios realizados pelo poder público. Acredita-se que este estudo abre portas para novas investigações sobre políticas e práticas que enfrentam ou estimulam o ensino religioso em escolas públicas e creches conveniadas.
|
189 |
O direito fundamental a saúde e as parcerias na administração pública : regulando a iniciativa privada na assistência farmacêuticaCunha Neto, Antonio Resende da 23 February 2016 (has links)
The prevalence of the Constitution emphasizes the axiological hegemony of
principles that become normative pedestal of the legal system, stopping the
function of ensuring an interpretive and integrative criterion, a spongy,
incomplete and imperfect system. On this track of thought, axiological validity of
fundamental rights demand the legitimacy of state prerogatives with
communication between state and citizen, in a dialectical relationship that
requires democratic participation from the enjoyment of basic rights as defined
from the notion of citizenship. This dissertation analyzes the fundamental right
to health, through the public health system (SUS). Being a theoretical work,
analyzes its guiding principles and corresponding laws. In the face of objective
reality and fateful, critical and analytical approach is urgent and imperative to
share some of the numerous existing problems, but also important it is to
analyze and discuss possible solutions. In this respect, it is particularly
highlighted public-private partnerships and its peculiarities. Therefore, to
express the real potential of these analyzes to pharmaceutical assistance as a
complementary activity object of the private sector through the model of publicprivate
partnerships, implementation of the right policies to access to medicines
and pharmaceutical patents and their relativity as form of effectiveness of the
principle of efficiency in pharmaceutical care. It makes up this long journey in
pursuit of making efficient and effective the fundamental right to health. / A prevalência da Constituição acentua a hegemonia axiológica dos princípios,
que se convertem em pedestal normativo do sistema jurídico, detendo a função
de assegurar um critério interpretativo e integrativo, num sistema lacunoso,
incompleto e imperfeito. Nesta esteira de pensamento, a validade axiológica
dos Direitos Fundamentais demanda a legitimação das prerrogativas estatais
com a comunicação entre Estado e cidadão, numa relação dialética que
pressupõe a participação democrática a partir da satisfação dos direitos
fundamentais, definidos a partir da noção de cidadania. A presente dissertação
analisa o direito fundamental à saúde, passando pelo sistema público de saúde
(SUS). Sendo um trabalho teórico, analisa-se seus princípios norteadores e leis
correspondentes. Diante da realidade fática e fatídica, a abordagem crítica e
analítica se torna premente e imprescindível para externar alguns dos inúmeros
problemas existentes, mas também, importante se torna analisar e discutir as
soluções possíveis. Neste aspecto, assume especial destaque as parcerias
público privadas e suas peculiaridades. Portanto, para exprimir o real potencial
destas, analisa-se a assistência farmacêutica como objeto de atuação
complementar da iniciativa privada por meio do modelo das parcerias público
privadas, as políticas de implementação do direito ao acesso a medicamentos
e as patentes farmacêuticas e sua relativização como forma de efetividade do
princípio da eficiência na assistência farmacêutica. Faz-se este longo caminho,
na busca de tornar eficiente e efetivo o direito fundamental à saúde. / Mestre em Direito Público
|
190 |
The related party transaction in Brazilian Infrastructure PPPsAlmeida Júnior, Nilo Alves de January 2018 (has links)
Submitted by Nilo Almeida (naajrj@gmail.com) on 2018-08-15T16:34:00Z
No. of bitstreams: 1
The Related Party Transaction in Brazilian Infrastructure PPPs - Final Version.pdf: 1720313 bytes, checksum: 169661514312285f50c2683e8bb457ca (MD5) / Approved for entry into archive by GILSON ROCHA MIRANDA (gilson.miranda@fgv.br) on 2018-08-24T14:47:09Z (GMT) No. of bitstreams: 1
The Related Party Transaction in Brazilian Infrastructure PPPs - Final Version.pdf: 1720313 bytes, checksum: 169661514312285f50c2683e8bb457ca (MD5) / Made available in DSpace on 2018-08-27T14:37:34Z (GMT). No. of bitstreams: 1
The Related Party Transaction in Brazilian Infrastructure PPPs - Final Version.pdf: 1720313 bytes, checksum: 169661514312285f50c2683e8bb457ca (MD5)
Previous issue date: 2018-05-11 / Transações com parte relacionadas (RPT) é um problema recorrente na maioria das empresas com propriedade compartilhada porque, ao mesmo tempo que pode trazer uma redução significante dos custos de transação, por outro lado apresenta o risco de ser abusada causando perdas para os acionistas minoritários e credores. A Parceria Público Privada (PPP) de infraestrutura, sendo um empreendimento em sociedade, está sujeito a este dilema e, devido à alavancagem proporcionada pelo Project Finance, há inclusive maiores incentivos ao comportamento oportunista. Um exemplo recente, motivando a discussão, é o case da usina hidroelétrica Santo Antônio, que, com um orçamento inicial de R$ 12 bilhões, acabou custando um total de R$ 20 bilhões. O potencial de retorno imediato por expropriação dos custos majoritários, tipo aquisição e construção para o projeto, na maioria das vezes é extremamente superior à exposição do agente oportunista às perdas durante a futura operação da infraestrutura. Neste trabalho é proposto um modelo microeconômico simples para explorar os incentivos subjacentes nos projetos de PPP com o objetivo de encontrar alternativas para mitigar o desalinhamento de incentivos causados por RPT’s nas PPPs. Finalmente, a literatura pesquisada, em conjunto com o modelo proposto, são usados na comparação com dados empíricos mostrando forte evidência de efeitos negativos das RPTs. Em muitas PPPs no Brasil, a presença de grandes construtoras nas holdings dos seus controladores, aliada à pouca experiência dos agentes governamentais e deficiência de recursos na utilização do modelo PPP, criou um ambiente muito desfavorável ao sucesso desses projetos. / The Related Party Transaction (RPT) is a recurring issue in most shared ownership companies because, at the same time, it has the potential to bring significant reduction of transaction costs, on the other hand, presents many pitfalls of being abused to the loss of the minority shareholders and creditors. The infrastructure Public Private Partnership (PPP), being a shared enterprise, is prone to this dilemma and, because project finance is extremely leveraged, there are even stronger incentives for opportunistic behavior. As a recent example to motivate the discussion there is the case of Santo Antonio hydroelectric power generation facility, which had an initial budget of R$ 12 billion and ended up costing a grand total of R$ 20 billion. The potential immediate returns of expropriation from major expenses, such as acquisition and construction for the project, most of the time, far outweighs the opportunist’s exposure to losses in the future operation of the infrastructure. It is proposed a simple microeconomic model for exploring the underlying incentives of PPP projects to help devise options for mitigating the incentive misalignment of RPTs in PPPs. Finally, the literature and the proposed model findings are used to compare with empirical data which has showed strong evidence of negative RPT effects. In many PPPs in Brazil, the presence of big construction firms in the controlling shareholders’ holdings, coupled with the government’s lack of experience and adequate resources to work with the PPP model, created a difficult environment for the financial success of those projects.
|
Page generated in 0.12 seconds