Spelling suggestions: "subject:"seidlová"" "subject:"seidler""
1 |
Ustálený chod a zkratové poměry v síti 110 kV E.ON napájené z rozvodny 110 kV Otrokovice v roce 2011 / Stabilized operation and short - circuit conditions within E.ON 110 kV power network supplied from Otrokovice 110kV switching station, during the period of 2011Jurča, Ondřej January 2011 (has links)
Distribution network 110 kV owned by E. ON in the area Otrokovice; powered by 110 kV and two variants of involvement contained.The first option is basic involvement, without the use of the bridge. The second option includes involvement with the bridge. The aim of this study is to compare; by calculating the steady-state network operation and short circuit conditions of the network, the involvement of these two options. The thesis is divided into two parts, theoretical and practical. The theoretical part consists of a description of the steady operation of networks of high-voltage and short circuit ratio calculations. Load flow calculations are described by the Gauss-Seidel and Newton iterative method. In the case of short-circuit conditions, the effects of their characteristic values, processes and various methods of calculation are described.In the second part, this theoretical knowledge is applied to input data and dispatching programme with the appropriate calculations of network operation and short circuit conditions. The calculated values are listed in the thesis, on the basis of which an evaluation of the two possible connections is made.
|
Page generated in 0.0326 seconds