1 |
Mateřská škola a polyfunkční objekt Želivec - příprava a realizace stavby / Nursery school and multifunctional building Želivec - preparation and realizationKrál, David January 2012 (has links)
The masters thesis with the name Nursery school and multifunctional building Želivec solves preparation and realization of building. The aim of masters thesis is to design of time, financial and material resources. The thesis contains budget, time schedule, building-site, technological standard, control and trial plan, assessment of lifting mechanism and study of realization of the main stages. The thesis is prepared on the basis of technical documents submitted by the designer. Part of the thesis is specialization.
|
2 |
Vybrané části stavebně technologického projektu bioplynové stanice v Herálci / Selected Parts of Building -Technological Project of Biogas Station in HeralecPíštěk, Kamil January 2013 (has links)
The master thesis with the name Selected Parts of Building -Technological Project of Biogas Station in Heralec solves preparation and realization of building. The aim of master thesis is to design of time, financial and material resources. The thesis contains budget, time schedule, building-site, technological standard, control and trial plan, assessment of lifting mechanism and study of realization of the main stages. The thesis is prepared on the basis of technical documents submitted by the designer. Part of the thesis is specialization.
|
Page generated in 0.1106 seconds