• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Reglerbara skovlar på pumphjul

Ragnarsson, Tobias January 2006 (has links)
<p>The thesis investigates if it is possible to replace several pumpimpellers with one controllable pumpimpeller, with a economical and a manufacturing analisys aspect. The studied pumpimpeller is mounted on a midrange wastewaterpump, N3127MT.</p><p>In the thesis a contemplated manufacturing process is evaluated for a concept that are supposed to act as a controllable pumpimpeller. The pumpimpeller are studied in a manufacturing and flow matter and are presented in the thesis.</p><p>The manufacturing cost is also estimated, and this has been compared to the storage cost and other costs that the existing pumpimpeller generates.</p><p>The thesis also shows that the concept has minor losses in cutting quality aswell as the effiency comparing to the existing pumpimpeller.</p><p>The concept also raises the manufacturing cost and this increasing cost makes the presented concept to expensive to carry through.</p><p>An investigation of the costs that the existing pumpimpeller produces has also been done, and this shows that there is not that much expenses to earn regarding to for example the storage cost. The storage cost includes information from Flygt’s central storagecenter in Lindas, Sweden and Metz, France, and also an inventory about the pumpimpellers located at Flygt’s different distributors worldwide.</p><p>The thesis shows that a controllable pumpimpeller will generally increase the cost for the pumpimpeller and the performance of the pumpimpeller will decrease.</p>
2

Reglerbara skovlar på pumphjul

Ragnarsson, Tobias January 2006 (has links)
The thesis investigates if it is possible to replace several pumpimpellers with one controllable pumpimpeller, with a economical and a manufacturing analisys aspect. The studied pumpimpeller is mounted on a midrange wastewaterpump, N3127MT. In the thesis a contemplated manufacturing process is evaluated for a concept that are supposed to act as a controllable pumpimpeller. The pumpimpeller are studied in a manufacturing and flow matter and are presented in the thesis. The manufacturing cost is also estimated, and this has been compared to the storage cost and other costs that the existing pumpimpeller generates. The thesis also shows that the concept has minor losses in cutting quality aswell as the effiency comparing to the existing pumpimpeller. The concept also raises the manufacturing cost and this increasing cost makes the presented concept to expensive to carry through. An investigation of the costs that the existing pumpimpeller produces has also been done, and this shows that there is not that much expenses to earn regarding to for example the storage cost. The storage cost includes information from Flygt’s central storagecenter in Lindas, Sweden and Metz, France, and also an inventory about the pumpimpellers located at Flygt’s different distributors worldwide. The thesis shows that a controllable pumpimpeller will generally increase the cost for the pumpimpeller and the performance of the pumpimpeller will decrease.

Page generated in 0.0365 seconds