Spelling suggestions: "subject:"stavební"" "subject:"stavebně""
1 |
Projekt víceúčelové hospodářské stavbyTrojanová, Ludmila January 2010 (has links)
No description available.
|
2 |
Teorie Her Aplikovaná na Manažerské Rozhodování: Případová Studie Dopravního StavitelstvíVařeková, Barbora January 2010 (has links)
No description available.
|
3 |
Návrh budovy taneční školyPecháčková, Pavlína January 2018 (has links)
In the final thesis is solved design of a building for a dancing school. The building is designed from solid wood panels CLT with a diffusion-open system and the building envelope is in passive house standart. Design is subject valids standarts and meets requirements of the investor. Part of the final thesis is drawings with technical description of the building and thermal assessment of the building envelope. Also, in the final thesis is solved fire safety requirements, which is with drawing and fire safety report.
|
4 |
Procesní postupy v rámci územního a stavebního řízení / Process procedures in area management and construction managementKřivánková, Jana January 2008 (has links)
This diploma thesis is focused on issues of positioning, licensing and fruition of civil engineering projects. The aim of this work is to analyze these matters and create subsequently single consecutions facilitating orientation in the construction law for the employers. First the elemental terms of procedure modelling and methodology are introduced to reader to be used further in the text for illustration of the processes. Furthermore particular types of construction positioning, planning permissions and fruition of constructions are analyzed to demonstrate the progression and essential inputs for gaining the authorization within the required moves. In the final part particular procedures giving instructions for the employers which steps to make for realization of their construction plan are elaborated. All the procedures are derived from the types of positioning, permissions and fruition of constructions as in the text described. Short presentation as an operative manual for employers assigning constructions to particular procedures is added.
|
5 |
Užívání staveb a jejich změn / Occupancy of buildings and their alterationsMazáčková, Jana January 2013 (has links)
- 1 - Abstract This thesis deals with the Occupancy of buildings and their alterations. To select this theme inspired me the decision to leave home and reconstruction of apartment. The aim of this thesis was to exclusion and describing the problems of practices that lead to the occupancy of buildings. A choice selected institute was targeted because the area governed by the Building Act is very wide. Another aim was to define the differences of the amended provisions. I also considered it important to outline the practice of building offices. The thesis is presented a short introduction. The sources of law are discussed in the first chapter. This chapter is divided into four subchapters and this chapter is dealing with the historical development of legislation, current sources of legislation, the last amendment to the building law and its deficiencies. Content of the second chapter is interpretation of some terms that relate to occupancy of buildings. This is essentially a building, "black" building, change of the completed building, change building before its completed, change in the way of building occupancy and builder. In the third chapter, attention is paid to executors of public administration in the section of the building code. This chapter consists of two subchapters. The first subchapter focuses...
|
6 |
Provádění staveb a jejich změn / Construction of buildings and their alterationsOndra, Martin January 2018 (has links)
Construction of buildings and their alterations Abstract This master's thesis is concerned with the analysis of the primary regulation of realization of structures and their alternations, which is a part of the public construction law. The topic of this thesis is up-to-date because of adoption of the second major amendment to the Building Act. The proclaimed goal of this amendment is a simplification and an acceleration of the processes and procedures. The main goal of this thesis is to identify problems associated with the current legal regulation of realization of general structures and their alternations, which, in selected cases, is followed by the effort to find their solution de lege ferenda. The secondary goal of this thesis is a critique of the second major amendment to the Building Act from 2017 and the identification of what problems it has brought including the assessment of whether is actually fulfilling its stated goal. The master's thesis is composed of six chapters. Chapter one deals with the sources of law and the fragmentation of implementing statues. Chapter two analyzes the basic concept of structure as well as other basic concepts related to the topic of this thesis. Chapter three contains an analysis of the organisation of building offices, selected issues related to the performance of...
|
7 |
Správní řád a jeho využití při povolování staveb podle stavebního zákona / The Code of Administrative Procedure and its use in construction permitting in accordance with the Building ActHercíková, Dita January 2016 (has links)
The thesis characterises building permitting administrative procedures subject to the Building Act and Rules of Administrative Procedure. The legal regulation contained in the new Building Act that has been effective since 2007 has been amended several times over the period of nine years, among other by so called big amendment to the Building Act in 2013. Both the Building Act and amendments to it are supposed to simplify and speed up its implementation as much as possible. The Building Act is a special legal regulation the implementation of which is supported by the Rules of Administrative Procedure as a general legal regulation. The current legal regulation of the Rules of Administrative Procedure has been effective since 2006. The Rules of Administrative Procedure stipulate general procedures that are not set forth in special laws. Therefore, the research part of the thesis describes procedures of the granting of individual types of permits subject to the Building Act that are related to general procedures subject to the Rules of Administrative Procedure.
The result part of the thesis focuses on a comparison of permitting and appeal procedures in the Central Bohemian region and a comparison of such proceedings outputs to outputs of the proceedings in the Czech Republic. The paper analyses reasons that are behind the described results. The statistic evaluation deals with influences than affect numbers of granted permits. The thesis conclusion includes some suggestions concerning some Building Act amendments based on findings contained in the result and research part of the thesis.
|
8 |
Historické a soudobé dřevěné roubené stavby pro bydlení a jejich konstrukční řešení / Historical and contemporary wooden timbered buildings for living and construction solutionsMatějovský, Šimon January 2016 (has links)
The aim of this thesis was to carry out a search based on available literature that focused on historical development of timbered houses in the Czech Republic that are intended for permanent living. A survey was conducted subsequently to this search. This survey concentrated on firms that nowadays build timbered houses and also on construction solutions and structure composition of such houses. The conducted survey describes prevalent construction solutions of timbered houses in the current housebuilding sector of the Czech market.
The thesis focuses on thermal properties of today's timbered wooden structures. Next, an indicative measurement of these buildings was carried out by a blower door test and thermal imaging diagnostics. Furthermore, the thesis compares timbered structures with standard requirements for permanent housing. Interestingly, the measurements for instance showed that one new building met the requirements of the blower door test. Next, several thermography measurements demonstrated seamless heat transfer of a timbered wall as a whole.
The conclusion of the thesis summarizes the current use and construction of timbered houses in the Czech Republic. Moreover, it sums up the results of the measurements and outlines the survey results regarding the thermal properties of these houses.
|
9 |
Návrh sportovní halySevera, Zdeněk January 2019 (has links)
The thesis is focused on the design of the sports hall. The building consists of several materials, from reinforced concrete, ceramic bricks, insulation panels to wooden roof structures. In the design, valid standards were adhered to mainly for sanitary facilities and tribune design standards. The work includes static calculation of the roof structure in RFEM, and a fire safety solution is created containing drawings and fire report.
|
10 |
Provádění staveb a jejich změn / Construction of buildings and their alterationsDvořák, Stanislav January 2012 (has links)
I have chosen this topic, because I am interested in building and related issues. Another reason for the selection of the work is that the construction industry is very promising, dynamic and lucrative field. The thesis is devided into five chapters with appendix. The work begins with a historical introduction to construction law and its major developmental milestones in the Czech Republic. The sources of public constructional law are discussed in detail in the following passage of the first chapter. Basic terms of construction law, relevant to the processing of the dissertation are defined in chapter 2. The issue of public administration that is related to the construction is described in chapter 3. Realization modes are described in chapter 4. First is called "free" mode, which is used in case of less technologically challenging projects and a minimum of intervening in the public and private interests (chapter 4.1). Second is the reporting regime and institute planning information given in section 4.2. And third, I consider the most important an authorization regime. In the authorization regime are carried out all constructions, if is not established that the reporting regime is sufficient or "free". To alternatives of authorization regime are dedicated separate subchapters. Public contracts (4....
|
Page generated in 0.072 seconds