Spelling suggestions: "subject:"stavební""
111 |
Stavebně technologický projekt rozšíření ZŠ Šlapanice / Construction-technological project of extension of elementary school ŠlapaniceVrbka, Jiří Unknown Date (has links)
This diploma thesis deals with construction-technological project of extension of elementary school Šlapanice. The thesis is focused on the design of the construction site equipment, the time and financial plan, itemized budged, the design of machines and mechanisms, the technological regulations, the control and test plan and the noise study. Part of this thesis is also the detailed time schedule and the thermal assessment of the roof.
|
112 |
Bytový dům Prostějov, stavebně technologická příprava stavby. / Residential Building, civil technical projekt.Pokorný, Jan January 2020 (has links)
In my diploma thesis, I focus on a building technology project of an apartment house in Prostějov. My work aims to design an optimal construction process. The thesis consists of a technical report, coordination drawing, project of the building site, building machines and mechanisms, time schedule and financial plan, description of technological process of the ventilated facade and of the monolithic reinforced concrete vertical structures including quality controls and testing plans. The process of making ventilated facade in comparison with the ETICS system is presented in more detail. Because the construction works take place in a city centre, the study of noise on the construction site is included as well.
|
113 |
Příprava realizace stavby Biology Park Brno / Preparation for construction management Biology Park BrnoŠťastná, Ludmila January 2016 (has links)
The thesis deals with the preparation of construction works Biology Park Brno . The goal is to determine the time, financial and material demands of the building and determine the appropriate method of construction technology . The work is focused on the main building object SO 01 - Building laboratories and offices , but some parts are addressed to the whole building. It is elaborated construction technology study , which followed closely solved the selected part of building technology project dealing with the given structures. Part of the work is devoted to the design optimization of the amount of formwork , which is necessary for construction.
|
114 |
Architektonická skulptura chrámu Matky Boží před Týnem na Starém městě pražském v lucemburském období / Architectural sculpture of Church of Our Lady before Týn in Prague Old Town in Luxembourg periodPeroutková, Jana January 2014 (has links)
This thesis looks into the analysis of iconography of the northern lateral portal of the Church of Our Lady before Týn. For this purpose this thesis summarizes the most important historiographical, Artististic Science and source literature related to this relic. Based on researched iconographic analysis this thesis aids to propose all possible solutions iconographic programme which could have been intended for this thesis. Based on the evaluation of literature, sources and on the formal analysis principal the objective of this thesis is to specify significantly problematic dating range (approximately from mid. 13th century up to late 1450) to shorter period of possible origin of the artwork there are also evaluated all available restauration reports and construction historical surveys related to the inspected relic.
|
115 |
Obytný soubor "Letňanské Zahrady" v Praze - stavebně technologický projekt / Residence "Letňanské Zahrady" in Prague - Building Contruction ProjectFaltys, David January 2018 (has links)
The subject of the final thesis deals with constructional technological project of structural work of building E, F, G and undeground garages, which belong to complex of building „Letňanské zahrady“ in Prague. The thesis contains time and financial plan, itemized budget for substructure, technical report, site equipment, machine assembly. The main part of my thesis consists of the technological prescription for foundation slab and construction of carcass substructure „white tank“.
|
116 |
Bytový dům "Za Pivovarem" Lázně Bohdaneč - stavebně technologický projekt / Construction Project - Apartment Building "Za Pivovarem" Lázně BohdanečVolf, Miroslav January 2018 (has links)
The aim of this diploma thesis is to process a building construction project for the apartment building “Za Pivovarem” in Lázně Bohdaneč. The building is designed as a four-floor object which has a flat roof, 24 apartments, 24 cellars, 10 garage stalls, 3 terraces that belong to the apartments on the 1st floor and enclosed balconies or balconies for the apartments in the above floors. The thesis focuses on the organization and preparation of the construction process. It contains a technological project for the cast-in-place reinforced concrete floors, which includes also drawings of formwork, a technical-economic balance sheet of the formwork costs and a calculation of the time for formwork removal, a technological project for anhydrite floors and inspection and test plans for both of the above mentioned building procedures, which are dealt with in a more detailed way. The implementation of other construction procedures is described in the preliminary design of implementation. Concerning the work safety, the plan of health and safety at work, focusing on work at heights and other dangers connected to work on the floor constructions, has been processed. Furthermore, there is a time and finance schedule for the whole construction, a construction site project, a set of main machines and mechanisms which includes a comparison of a mobile crane and a tower crane. In addition, broader transport relations have been assessed. The thesis also contains an instruction manual on the main object.
|
117 |
Výrobní hala LD Seating - stavebně technologický projekt / LD Seating production hall - construction technology projectJůzl, Martin January 2018 (has links)
The aim of the diploma thesis is a building-technological project on the production and assembly hall LD Seating in Boskovice u Brna. The solution is influenced by the existing hall in the area of the investor, where there will be a future new building. Based on this fact, the appropriate measures are chosen. The project puts emphasis on the off-road transport and the technological process of assembly of the prefabricated reinforced concrete hall, which will be solved from the financial and time point of view. The workflow will be affected by machine assembly, site facilities, and wider transport relationships. The project also solves the concept of the whole issue as a whole. All building objects are taken into account. Based on this, an object schedule and budget are developed.
|
118 |
Stavebně technologický projekt administrativní budovy / Constructive technological project of an administrative buildingLačňák, Slavomír January 2018 (has links)
The final thesis is focused on construction of the main technological stages of the administrative building of the Vídeňská in Brno. The final thesis contains the object engineering report, technological study, technological report, design of construction machinery and their transport. It also includes control and test plan, detailed schedule, item budget, and device object design. Finally is a plan of safety measures on the building.
|
119 |
Novostavba administrativního objektu v Karviné, stavebně technologický projekt / New Administrative Building in Karviná, Construction Technological ProjectToman, Marek January 2018 (has links)
The diploma thesis deals with preparation, organization and construction technology of an administrative building in Karviná. It is about new building with four above ground floor. From a design point of view, the structure is designed as a precast concrete frame. The diploma thesis contains technical report, coordinating situation with design of transport ways, time financial plan, study of the implementation of the main technological phases, concept of construction site equipment, design of machinery set, time plan with worker bilancion, material delivery plan for rough building, technical report for masonry work, inspection and test plan for masonry work, item budget with the statement of measurements and noice study for earthworks.
|
120 |
Stavebně technologický projekt demolice a stavby mostu / CONSTRUCTION-TECHNOLOGY PROJECT OF BRIDGE DEMOLITION AND BRIDGE CONSTRUCTIONHofírek, Radovan January 2018 (has links)
This diploma thesis deals with the demolition of a bridge located at the D1 motorway from Prague to Brno. The bridge no longer meets the load and width requirements of today´s standards. The thesis also deals with the construction of a new bridge, which will be expanded into D28/120 category. This expansion will allow for provisory use of the carriageways of one half of the motorway in both directions. The whole reconstruction is very time consuming that is the reason the new bridge is made of prefabricated pre-tensioned girders with a composite bridge deck. This can save time and the new bridge can be open for service in a shorter period of time.
|
Page generated in 0.0324 seconds