• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Effektiv partiformning : analys och tillämpning på Uppåkra Mekaniska AB / Efficient lot-sizing : a case study at Uppåkra Mekaniska AB

Eriksson, Emma, Claesson, Andreas January 2006 (has links)
This paper is the result of a case study conducted at Uppåkra Mekaniska AB during the spring of 2006. The task that was presented by Uppåkra was to develop a basis for a decision for the planning activities at the company, so that in the future they can create lot-sizes which are based upon a total cost perspective. Total cost in regards to lot-sizing is defined as the sum of the administrative reordering costs and warehousing cost per stock keeping unit. To collect data a series of interviews and observations were conducted. This data was then used during the lot-sizing simulation and analysis. The 15 units that the simulation was conducted on were grouped into three item classes depending how many different machine setups they required during the production process. Class A contained items which resulted in only one machine setup; where as those items in Class B had several different setups. Class C represents items without any machine setups, but requires shorter preparation for assembly. In the simulations the Wilson’s formula, Economic Part Period (EPP) and Least Cost method (LC) were compared with the lot-sizing model currently used by Uppåkra. The simulation results showed that there is a large potential to reduce the cost of lot-sizing by using the Wilson’s formula instead of the current model. For the 15 units simulated in this study, there was the potential to reduce costs by 5000SEK per unit yearly.
2

Effektiv partiformning : analys och tillämpning på Uppåkra Mekaniska AB / Efficient lot-sizing : a case study at Uppåkra Mekaniska AB

Eriksson, Emma, Claesson, Andreas January 2006 (has links)
<p>This paper is the result of a case study conducted at Uppåkra Mekaniska AB during the spring of 2006. The task that was presented by Uppåkra was to develop a basis for a decision for the planning activities at the company, so that in the future they can create lot-sizes which are based upon a total cost perspective. Total cost in regards to lot-sizing is defined as the sum of the administrative reordering costs and warehousing cost per stock keeping unit.</p><p>To collect data a series of interviews and observations were conducted. This data was then used during the lot-sizing simulation and analysis. The 15 units that the simulation was conducted on were grouped into three item classes depending how many different machine setups they required during the production process. Class A contained items which resulted in only one machine setup; where as those items in Class B had several different setups. Class C represents items without any machine setups, but requires shorter preparation for assembly. In the simulations the Wilson’s formula, Economic Part Period (EPP) and Least Cost method (LC) were compared with the lot-sizing model currently used by Uppåkra.</p><p>The simulation results showed that there is a large potential to reduce the cost of lot-sizing by using the Wilson’s formula instead of the current model. For the 15 units simulated in this study, there was the potential to reduce costs by 5000SEK per unit yearly.</p>

Page generated in 0.0523 seconds