Return to search

Introducing C-Band Operations Using a Low Cost Test Platform

ITC/USA 2015 Conference Proceedings / The Fifty-First Annual International Telemetering Conference and Technical Exhibition / October 26-29, 2015 / Bally's Hotel & Convention Center, Las Vegas, NV / Changing from L/S-Band to C-Band requires not only new equipment. Even the characteristics of the new frequencies just as the new frequency environment are a challenge for the operations in this bands when changing from a well-known frequency environment to a unknown new one. This paper describes the way used at Airbus Defense and Space Flight Test Ground Station to get experience with new equipment and to learn more about the new environment. Repeatable and comparable tests allowed training for the operators and the optimization of the equipment and procedures with the new environment. Although many of the problems or features observed during the tests where expected in advance, but even unexpected results could be identified.

Identiferoai:union.ndltd.org:arizona.edu/oai:arizona.openrepository.com:10150/596418
Date10 1900
CreatorsMueller, Guenter
ContributorsAirbus Defence and Space
PublisherInternational Foundation for Telemetering
Source SetsUniversity of Arizona
Languageen_US
Detected LanguageEnglish
Typetext, Proceedings
RightsCopyright © held by the author; distribution rights International Foundation for Telemetering
Relationhttp://www.telemetry.org/

Page generated in 0.002 seconds