Return to search

Integrating Stope Design and Long-term Production Scheduling Under Uncertainty: Methods and Applications for an Operating Copper Mine

No description available.
Identiferoai:union.ndltd.org:mcgill.ca/oai:escholarship.mcgill.ca:8w32rb952
Date January 2024
CreatorsCarelos Andrade, Laura
ContributorsRoussos G Dimitrakopoulos (Supervisor)
PublisherMcGill University
Source SetsMcGill University
Languagehttp://id.loc.gov/vocabulary/iso639-2/eng
Detected LanguageEnglish
TypeThesis
RightsAll items in eScholarship@McGill are protected by copyright with all rights reserved unless otherwise indicated.

Page generated in 0.0017 seconds