Return to search

Pořizovací a provozní náklady vybraného stavebního objektu / Acquisition and operating costs of a selected building

This Diploma Thesis is focused on initial and operating costs. At first we calculated price for all building and for its other parts, which was calculated by program used for budgeting. After that we calculated partial costs which were done only for specific parts of the construction. These parts were changed and due to these changes we were finding out differences in heat losses and initial costs. Than for individual rooms we were defining heat losses. In this rooms, radiators were designed to cover its heat losses. By summarization of all heat gains we find out boiler´s power and this boiler was used in our building. After that we calculated initial costs for heating system includes radiators and boiler. In the end we compared both kinds of heating systems due to one year operating costs. Results were used for defining final heating system which is the most economic efficiential.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:372217
Date January 2018
CreatorsJanků, Tereza
ContributorsLabudek, Lukáš, Tichá, Alena
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0019 seconds