The topic of this thesis is a collection of objects of the postharvest line in the village Horní Moštěnice by the town Přerov. The thesis resolves the time schedule along with the financial plan. In the drawing of the constructional plant is being solved the establishment of the whole construction. Further is it the technical report, site engineering study and a noise study. The thesis is focused on the storage bins, for which is being developed a detailed time schedule, a budget, a drawing of the machine configuration, a technological standard for the assembly of the storage bins, the principles for the construction management, technical management of the constructional plant, control and test plan, safety and health at work protection and the construction site noise.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:227016 |
Date | January 2014 |
Creators | Bahulíková, Pavla |
Contributors | Horňák, Michal, Vlčková, Jitka Laura |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0016 seconds