This thesis deals with the optimization of the production technology of the cap tube made by injection molding. Series production is set at 5 000 000 units per year; the minimum time of the production is 5 years. A literary study is developed, focusing on the technology of injection molding in molds including the possibilities of the optimization of the production by changing the structure of the mold. The practical part of the thesis is devoted to the optimization of existing mold with cold runner system for the production of the cap tube, using the hot runner system supplied by Synventive. The change of the structure of the mold involves changing the three plate mold to a two plate mold. It is about changing the fixed part of the mold in which the hot runner system is placed; it is composed of standards parts of the company HASCO. Based on the technological parameters the injection machine Krauss Maffei KM 80-380 CX is chosen. There is a technical-economical evaluation of the optimization of the production by using the hot runner system at the end of the thesis.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:231256 |
Date | January 2014 |
Creators | Majerčíková, Erika |
Contributors | Kebrle, Ondřej, Kandus, Bohumil |
Publisher | Vysoké učení technické v Brně. Fakulta strojního inženýrství |
Source Sets | Czech ETDs |
Language | Slovak |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0019 seconds