Return to search

Výrobní aplikace KAIZEN / Production KAIZEN Application

Theoretical part of this diploma thesis describe Kaizen method and parts of this method, which was developed in Japan after the Second World War. One part of this method is the 3MU concept, that includes definition of absences which influence all companies. One concept of the 3MU is “Muda”, who indicate waste. Practical part is interesting in wastes in sphere of productivity at one of the production department of the Bosch Diesel Ltd. in Jihlava. Individual operations of this department are considered in light of possibility introduction of more-machine operation and the checking of necessity of some machines. As a result is time data evaluation by REFA method and check of possibility introduction of more-machine operation with modification of working processes, calculation of industrial production capacity of some machines and the definition of buffer stocks. This modification of working processes, number of machines and the definition of buffer stocks needs change of layout of production department. At the conclusion there are calculated final costs and savings for implementation of this project.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:229366
Date January 2010
CreatorsNovák, Jaroslav
ContributorsKotek, Luboš, Fiala, Alois
PublisherVysoké učení technické v Brně. Fakulta strojního inženýrství
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0022 seconds