This diploma thesis deals with the influence of range of reconstruction on the price of building construction. Effect of the extent of reconstruction consists in comparing of the total costs of the bridge during reconstruction of the top of the bridge leaving the main structure and during the reconstruction realized with the exchange of the main supporting structure. The total costs incurred are expected for 60 years.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:225535 |
Date | January 2012 |
Creators | Hasilík, Jakub |
Contributors | Kaláb, Petr, Aigel, Petr |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0018 seconds