The purpose of this study is to examine the three scheduling systems available today as a management tool. The first two systems--Milestone Reporting and Line-of-Balance--are essentially Gantt charts which do not appear to meet the requirements for management control of scheduling. An investigation of PERT is made to see if it will provide additional controls necessary for proper scheduling.
Identifer | oai:union.ndltd.org:unt.edu/info:ark/67531/metadc108145 |
Date | 06 1900 |
Creators | Ross, William Minor |
Contributors | Self, Stanley Allen, Littlefield, C. L. (Cleatice Louis) |
Publisher | North Texas State University |
Source Sets | University of North Texas |
Language | English |
Detected Language | English |
Type | Thesis or Dissertation |
Format | v, 74 leaves : ill., Text |
Rights | Public, Copyright, Copyright is held by the author, unless otherwise noted. All rights reserved., Ross, William Minor |
Page generated in 0.0039 seconds