Return to search

PERT as a Management Tool

The purpose of this study is to examine the three scheduling systems available today as a management tool. The first two systems--Milestone Reporting and Line-of-Balance--are essentially Gantt charts which do not appear to meet the requirements for management control of scheduling. An investigation of PERT is made to see if it will provide additional controls necessary for proper scheduling.

Identiferoai:union.ndltd.org:unt.edu/info:ark/67531/metadc108145
Date06 1900
CreatorsRoss, William Minor
ContributorsSelf, Stanley Allen, Littlefield, C. L. (Cleatice Louis)
PublisherNorth Texas State University
Source SetsUniversity of North Texas
LanguageEnglish
Detected LanguageEnglish
TypeThesis or Dissertation
Formatv, 74 leaves : ill., Text
RightsPublic, Copyright, Copyright is held by the author, unless otherwise noted. All rights reserved., Ross, William Minor

Page generated in 0.0039 seconds