The aim of the diploma thesis is the design of a continuous bridge construction of five fields in the direction of the town Albrechtice - Opava. The bridge overcame local roads and railway tracks and is part of the bypass of Albrechtice. From the three proposed variants, a pre-stressed two-beam structure was selected for the detailed solution and it is assessed according to the limit states and includes the effects of gradual construction. Further detailed drawings are drawn up.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:392190 |
Date | January 2019 |
Creators | Paleček, Vladimír |
Contributors | Řehulka, Martin, Panáček, Josef |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.002 seconds